Two family converted from one family
395 GRAND AVENUE
BROOKLYN · BIN 3056818
💬 Discuss this project
1870Year Built
3Stories
B3Building Class
R6BZoning
3,600 sfGross Floor Area
2Units
Two family converted from one family · 2,030 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction31p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Under Construction33p · 1 filing · 20 docs
CellarUnder Construction37p · 1 filing · 20 docs
Sub-BasementUnder Construction31p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2015$3.0M—395 GRAND AVENUE, LLC → Private party$847/sf building
01/24/2014$1.8M—— → —$508/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A DEGREE OF FREEDOM STRUCTURAL ENGI205/14/2026
MILLWARD ARCHITECTURE DESIGN209/04/2025
AEIS208/18/2025
SYED ENGINEERING, P.C.203/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MILLWARD ARCHITECTURE DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor603/21/2026
M INTERIOR CONSTRUCTION IGeneral Contractor307/09/2026
TAP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A DEGREE OF FREEDOM STRUC925205/14/2026
EP INSPECTIONS AND COMMIS7079208/18/2025
MILLWARD ARCHITECTURE DES9680108/18/2025
Building Lifecycle
All (50)Filed (8)Permit Issued (6)Signed Off (2)Inspection (3)Objection (14)Special Inspection (17)
07/07/2026
Permit issued — General Construction
B01220900-I1-GC
06/08/2026
Permit issued — Structural
B01220900-S1-ST
06/01/2026
Special inspection requirement — Final
Dominic Cullen
06/01/2026
Special inspection requirement — Post-installed Anchors
Dominic Cullen
06/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Dominic Cullen
06/01/2026
Special inspection requirement — Structural Steel - Welding
Dominic Cullen
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
06/01/2026
Special inspection requirement — Structural Steel - Details
Dominic Cullen
06/01/2026
Special inspection requirement — Concrete - Cast-In-Place
Dominic Cullen
05/14/2026
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-P2
05/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Dominic Cullen
05/14/2026
Special inspection requirement — Post-installed Anchors
Dominic Cullen
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
05/14/2026
Special inspection requirement — Structural Steel - Details
Dominic Cullen
05/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Dominic Cullen
05/14/2026
Special inspection requirement — Structural Steel - Welding
Dominic Cullen
05/14/2026
Special inspection requirement — Final
02/11/2026
Permit issued — Plumbing
B01220900-S3-PL
11/28/2025
Permit issued — General Construction
B01220900-I1-GC
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/16/2025
Objection raised — Cost
09/11/2025
Objection raised — Cost
09/04/2025
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-P1
08/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2025
Objection raised — Scope
08/28/2025
Objection resolved — Addressed
08/27/2025
Objection raised — Scope
08/27/2025
Objection resolved — Addressed
08/18/2025
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-S1
08/18/2025
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-S2
08/18/2025
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-S3
08/18/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK MILLWARD
07/29/2025
Objection raised — Other
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Scope
07/15/2025
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-I1
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2025
Special inspection requirement — Final
MOLLY GLENN
05/05/2025
Special inspection requirement — Mechanical Systems
MOLLY GLENN
07/22/2021
Signed off — Alteration
B00488611-I1
07/22/2021
Signed off — Alteration
B00488747-I1
04/02/2021
Permit issued — Sidewalk Shed
B00488611-I1-SH
03/22/2021
Permit issued — Supported Scaffold
B00488747-I1-SF
03/19/2021
Filed — Alteration
B00488611-I1
03/19/2021
Filed — Alteration
B00488747-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM INTERIOR CONSTRUCTION I07/07/2026
DOB NOWStructuralPermit IssuedM INTERIOR CONSTRUCTION I06/08/2026
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP02/11/2026
DOB NOWGeneral ConstructionPermit IssuedM INTERIOR CONSTRUCTION I11/28/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS04/02/2021
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS03/22/2021
1 project · most recent 05/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/14/2026Permit IssuedM INTERIOR CONSTRUCTION IHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Greenheck IDHB 4,265 BTU · Electric Heater ×1
Ventilation
Greenheck SP-LP0511-1 50 CFM · Exhaust Fan ×1
SQ-7-M1-VG 950 CFM · Exhaust Fan ×1
1 project · most recent 05/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2026Permit IssuedTAP PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 02/18/2026
General Wiring
FiledStatusContractorScope
02/18/2026Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
03/24/2021Permit IssuedRICHARD NEU—
1 project · most recent 05/14/2026
Steel
FiledStatusContractorScope
05/14/2026Permit IssuedM INTERIOR CONSTRUCTION ISteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/01/2026FinalDominic Cullenprogress
06/01/2026Post-installed AnchorsDominic Cullenspecial
06/01/2026Structural Steel - High Strength BoltingDominic Cullenspecial
06/01/2026Structural Steel - WeldingDominic Cullenspecial
06/01/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
06/01/2026Structural Steel - DetailsDominic Cullenspecial
06/01/2026Concrete - Cast-In-PlaceDominic Cullenspecial
05/14/2026Concrete - Cast-In-PlaceDominic Cullenspecial
05/14/2026Post-installed AnchorsDominic Cullenspecial
05/14/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
05/14/2026Structural Steel - DetailsDominic Cullenspecial
05/14/2026Structural Steel - High Strength BoltingDominic Cullenspecial
05/14/2026Structural Steel - WeldingDominic Cullenspecial
05/14/2026Final—progress
07/31/2025Fire-Resistant Penetrations and JointsERIK MILLWARDspecial
05/05/2025FinalMOLLY GLENNprogress
05/05/2025Mechanical SystemsMOLLY GLENNspecial
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00488747-I1Request digital key ↗
09/01/2026B00488611-I1Request digital key ↗
08/17/2026B01220900-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/17/2026B01220900-P2Open ↗
08/13/2026B01220900-S1Open ↗
08/13/2026B01220900-S2Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature14
08/26/2026B01220900-S2Open ↗
08/26/2026B01220900-S2Open ↗
08/26/2026B01220900-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00488747-I1Open ↗
09/01/2026B00488611-I1Open ↗
08/17/2026B01220900-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01220900-S2Open ↗
08/24/2026B01220900-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026B01220900-S3Open ↗
08/17/2026B01220900-P2Open ↗
08/17/2026B01220900-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026B01220900-P1Open ↗
08/13/2026B01220900-I1Open ↗