← Back
One story retail building
1135 FULTON STREET
BROOKLYN · BIN 3057393
💬 Discuss this project
1999Year Built
1Stories
K1Building Class
R7DZoning
2,800 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: BERMUDA REALTY NO. 2 LLC · 3,323 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 13p · 2 filings · 18 docs
1 job · most recent 06/21/2022
General Wiring
FiledStatusContractorScope
06/21/2022CompleteDELTA POWER ELECTRICALGeneral Wiring
Building Lifecycle
All (42)Filed (6)Permit Issued (5)Signed Off (5)Violation (10)Inspection (5)Special Inspection (11)
10/23/2023
Signed off — Alteration
Interior renovation of existing commercial space, new non-load-bearing partitions, new wall floor ceiling finishes.
B00655759-I1
10/23/2023
Signed off — Alteration
new HVAC system
B00655764-I1
10/20/2023
Signed off — Alteration
B00655765-I1
10/20/2023
Signed off — Alteration
modifications to existing sprinkler system
B00655766-I1
10/20/2023
Signed off — Alteration
B00655762-I1
05/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/27/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/08/2022
Permit issued — Mechanical Systems
B00655764-I1-MS
03/07/2022
Filed — Alteration
new HVAC system
B00655764-I1
02/23/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2022
Permit issued — General Construction
B00655759-I1-GC
02/15/2022
Permit issued — Sprinklers
B00655766-I1-EW-SP
02/14/2022
Permit issued — General Construction
B00655762-I1-GC
02/14/2022
Permit issued — Plumbing
B00655765-I1-PL
02/10/2022
Filed — Alteration
Interior renovation of existing commercial space, new non-load-bearing partitions, new wall floor ceiling finishes.
B00655759-P1
02/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
02/10/2022
Special inspection requirement — Final
Yongho Kim
02/10/2022
Special inspection requirement — Lighting controls
Yongho Kim
02/10/2022
Special inspection requirement — Interior lighting power
Yongho Kim
02/08/2022
Filed — Alteration
Interior renovation of existing commercial space, new non-load-bearing partitions, new wall floor ceiling finishes.
B00655759-I1
02/08/2022
Filed — Alteration
B00655765-I1
02/08/2022
Filed — Alteration
modifications to existing sprinkler system
B00655766-I1
02/08/2022
Filed — Alteration
B00655762-I1
01/01/2022
Special inspection requirement — Mechanical Systems
Yongho Kim
01/01/2022
Special inspection requirement — Final
Yongho Kim
01/01/2022
Special inspection requirement — Maintenance information
Yongho Kim
01/01/2022
Special inspection requirement — Shutoff dampers
Yongho Kim
01/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
01/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
01/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
05/10/2000
Violation issued (ECB, closed)
Plumbing
05/10/2000
Violation issued (ECB, closed)
Plumbing
05/10/2000
Violation issued (ECB, closed)
Plumbing
05/10/2000
Violation issued (ECB, closed)
Plumbing
12/13/1999
Violation issued (ECB, closed)
Construction
12/13/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
12/13/1999
Violation issued (ECB, closed)
Construction
02/12/1997
Violation issued (ECB, closed)
Construction
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/20/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERMUDA REALTY1607/08/2026
OWNER OF 1135/ 37 FULTON103/22/2026
OWNER OF 1135 FULTON STRE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C2B ARCHITECTS PC603/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALCHEMY DEVELOPMENTGeneral Contractor903/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327503/07/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offALCHEMY DEVELOPMENT03/08/2022
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT02/17/2022
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR02/15/2022
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT02/14/2022
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP02/14/2022
BISMHISSUEDI.B.M. INDUSTRIES INC11/18/1999
BISEQISSUEDSCALA CONTRACTING CO., INC.03/13/1997
BISEQISSUEDSCALA CONTRACTING CO., INC.03/13/1997
BIS—ISSUEDSCALA CONTRACTING CO., INC.03/13/1997
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/27/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
02/10/2022Fire-Resistant Penetrations and JointsYongho Kimspecial
02/10/2022FinalYongho Kimprogress
02/10/2022Lighting controlsYongho Kimenergy_progress
02/10/2022Interior lighting powerYongho Kimenergy_progress
01/01/2022Mechanical SystemsYongho Kimspecial
01/01/2022FinalYongho Kimprogress
01/01/2022Maintenance informationYongho Kimenergy_progress
01/01/2022Shutoff dampersYongho Kimenergy_progress
01/01/2022HVAC-R and service water piping design and insulationYongho Kimenergy_progress
01/01/2022HVAC-R and service water heating system controlsYongho Kimenergy_progress
01/01/2022HVAC-R and service water heating equipmentYongho Kimenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00655765-I1Request digital key ↗
08/31/2026B00655766-I1Request digital key ↗
08/31/2026B00655759-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00655765-I1Open ↗
08/31/2026B00655759-I1Open ↗
08/31/2026B00655759-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026B00655764-I1Open ↗
08/26/2026B00655764-I1Open ↗
08/24/2026B00655759-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00655764-I1Open ↗
08/24/2026B00655759-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026B00655765-I1Open ↗
08/31/2026B00655759-I1Open ↗
08/31/2026B00655759-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/31/2026B00655764-I1Open ↗
08/13/2026B00655759-I1Open ↗
08/13/2026B00655762-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/31/2026B00655764-I1Open ↗
08/13/2026B00655759-I1Open ↗
08/13/2026B00655762-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis4
08/31/2026B00655764-I1Open ↗
08/13/2026B00655765-I1Open ↗
08/13/2026B00655759-I1Open ↗
Showing 3 of 4 on file for this type