← Back
Two family converted from one family
30 LEFFERTS PLACE
BROOKLYN · BIN 3057804
💬 Discuss this project
1910Year Built
3Stories
B3Building Class
R7AZoning
2,920 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: 202 WEST LLC · 1,275 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof8p · 1 filing · 19 docs
Floor 42p · 2 filings · 18 docs
Floor 33p · 2 filings · 18 docs
Floor 22p · 2 filings · 18 docs
Floor 13p · 2 filings · 18 docs
Cellar6p · 3 filings · 20 docs
1 job · most recent 05/06/2024
General Wiring
FiledStatusContractorScope
05/06/2024CompleteACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (77)Filed (8)Permit Issued (5)Signed Off (4)Violation (42)Inspection (4)Special Inspection (14)
09/07/2025
Signed off — Alteration
INTERIOR ALTERATION TYPE 2. WORK LIMITED TO RESIDENTIAL UNITS, COMMONCORRIDOR AREAS NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING
B00895340-I1
03/24/2025
Signed off — Alteration
B00904973-I1
03/21/2025
Signed off — Alteration
Remove existing apartment plumbing fixtures, rough-in piping, and risers throughout and replace with new . Provide (4) new electric water heaters to serve individual apartments.
B00896350-I1
03/21/2025
Signed off — Alteration
PROVIDE NEW EXHAUST DISTRIBUTION FOR TOILET AND KITCHEN/PANTRY ROOM SPACES. PROVIDE NEW ELECTRIC RADIATORS FOR BEDROOMS AND STAIR.
B00896343-I1
02/28/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
02/26/2025
Filed — Alteration
INTERIOR ALTERATION TYPE 2. WORK LIMITED TO RESIDENTIAL UNITS, COMMONCORRIDOR AREAS NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING
B00895340-P3
02/12/2025
Special inspection requirement — Final
MAURICIO ANDRADE
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
02/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
01/06/2025
Filed — Alteration
INTERIOR ALTERATION TYPE 2. WORK LIMITED TO RESIDENTIAL UNITS, COMMONCORRIDOR AREAS NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING
B00895340-P2
10/07/2024
Permit issued — Mechanical Systems
B00896343-I1-MS
09/20/2024
Special inspection requirement — Final
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
06/11/2024
Filed — Alteration
Remove existing apartment plumbing fixtures, rough-in piping, and risers throughout and replace with new . Provide (4) new electric water heaters to serve individual apartments.
B00896350-P3
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2024
Permit issued — Sprinklers
B00904973-I1-EW-SP
11/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Filed — Alteration
Remove existing apartment plumbing fixtures, rough-in piping, and risers throughout and replace with new . Provide (4) new electric water heaters to serve individual apartments.
B00896350-P2
09/22/2023
Permit issued — Plumbing
B00896350-I1-PL
08/11/2023
Permit issued — General Construction
B00895340-I1-GC
07/26/2023
Permit issued — General Construction
B00895340-I1-GC
07/18/2023
Filed — Alteration
INTERIOR ALTERATION TYPE 2. WORK LIMITED TO RESIDENTIAL UNITS, COMMONCORRIDOR AREAS NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING
B00895340-I1
07/18/2023
Filed — Alteration
B00904973-I1
07/18/2023
Filed — Alteration
Remove existing apartment plumbing fixtures, rough-in piping, and risers throughout and replace with new . Provide (4) new electric water heaters to serve individual apartments.
B00896350-I1
07/18/2023
Filed — Alteration
PROVIDE NEW EXHAUST DISTRIBUTION FOR TOILET AND KITCHEN/PANTRY ROOM SPACES. PROVIDE NEW ELECTRIC RADIATORS FOR BEDROOMS AND STAIR.
B00896343-I1
02/25/2022
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
01/31/2010
Violation issued (HPD, closed)
A
03/12/2007
Violation issued (ECB, closed)
Boilers
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2004
Violation issued (HPD, closed)
B
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2001
Violation issued (HPD, closed)
B
04/18/2001
Violation issued (HPD, closed)
B
04/18/2001
Violation issued (HPD, closed)
B
04/18/2001
Violation issued (HPD, closed)
B
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/27/1999
Violation issued (HPD, closed)
B
08/27/1999
Violation issued (HPD, closed)
B
08/27/1999
Violation issued (HPD, closed)
B
08/27/1999
Violation issued (HPD, closed)
B
08/27/1999
Violation issued (HPD, closed)
A
08/27/1999
Violation issued (HPD, closed)
B
08/27/1999
Violation issued (HPD, closed)
B
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS2007/08/2026
30 LEFFERTS PL, LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ESNYC CONSULTING INC302/26/2025
POLISE CONSULTING ENGINEER506/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP1403/21/2026
RIMKUS NEW YORK PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
METACOMET CONSTRUCTIONGeneral Contractor107/08/2026
MONTENEGRO HOME IMPR LLCGeneral Contractor104/09/2026
MONTENEGRO HOME IMPROVEGeneral Contractor104/09/2026
P.S.I. MECHANICALPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254802/26/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMETACOMET CONSTRUCTION10/07/2024
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC02/27/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL09/22/2023
DOB NOWGeneral ConstructionSigned-offMONTENEGRO HOME IMPROVE08/11/2023
DOB NOWGeneral ConstructionSigned-offMONTENEGRO HOME IMPR LLC07/26/2023
BIS—ISSUEDMETACOMET CONSTRUCTION07/10/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/28/2025FinalNAVEEN KUMARprogress
02/28/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/28/2025Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
02/28/2025Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
02/12/2025FinalMAURICIO ANDRADEprogress
02/12/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/12/2025Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
02/12/2025Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
09/20/2024FinalMAURICIO ANDRADEprogress
09/20/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/20/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
09/20/2024Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
06/11/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/31/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00896343-I1Request digital key ↗
08/27/2026B00895340-I1Request digital key ↗
08/27/2026B00895340-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION38
09/17/2025321386488Open ↗
07/25/2025321386488Open ↗
12/31/2024321386488Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
11/21/2024321386488Open ↗
11/20/2024321386488Open ↗
11/19/2024321386488Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
07/24/2024321386488Open ↗
07/12/2024321386488Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/24/2019321386488Open ↗
▸BISVERIFY TAX LOT1
10/11/2024321386488Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/11/2024321386488Open ↗
▸BISZONING DIAGRAM1
06/27/2023321386488Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/24/2019321386488Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00895340-I1Open ↗
08/27/2026B00895340-P2Open ↗
08/27/2026B00904973-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00895340-P3Open ↗
08/26/2026B00895340-P2Open ↗
08/25/2026B00896350-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00895340-P3Open ↗
08/26/2026B00895340-P2Open ↗
08/23/2026B00895340-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING6
08/29/2024321386488Open ↗
08/20/2024321386488Open ↗
02/15/2024321386488Open ↗
Showing 3 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/17/2024321386488Open ↗
▸BISSPRINKLER SYSTEMS1
10/23/2024321386488Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/03/2025321386488Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/03/2025321386488Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/17/2024321386488Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
05/01/2024321386488Open ↗
10/24/2019321386488Open ↗
04/08/2019321386488Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/25/2023321386488Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00895340-I1Open ↗
08/27/2026B00895340-P2Open ↗
08/27/2026B00904973-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2019321386488Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/08/2024321386488Open ↗
05/01/2024321386488Open ↗
04/03/2019321386488Open ↗
Showing 3 of 4 on file for this type
▸BISFENESTRATION AREAS1
09/17/2024321386488Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/17/2024321386488Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/17/2024321386488Open ↗
▸BISLIGHTING CONTROLS1
09/17/2024321386488Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/14/2025321386488Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/17/2024321386488Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/17/2024321386488Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
06/27/2023321386488Open ↗
▸BISINTERIOR LIGHTING POWER1
09/17/2024321386488Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/17/2024321386488Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/02/2025321386488Open ↗
08/20/2024321386488Open ↗
07/08/2024321386488Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
10/24/2019321386488Open ↗
04/08/2019321386488Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/16/2024321386488Open ↗
▸BISMECHANICAL SYSTEMS1
09/17/2024321386488Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/16/2024321386488Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/17/2024321386488Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/17/2024321386488Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/17/2024321386488Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLETTERS - SUPPORTING DOCUMENTATION16
10/06/2025321386488Open ↗
10/24/2019321386488Open ↗
10/24/2019321386488Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
05/07/2024321386488Open ↗
02/09/2024321386488Open ↗
07/19/2019321386488Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/15/2025321386488Open ↗
05/01/2024321386488Open ↗
10/24/2019321386488Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/14/2025321386488Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION11
10/30/2024321386488Open ↗
09/25/2024321386488Open ↗
06/06/2024321386488Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET5
05/16/2019321386488Open ↗
04/15/2019321386488Open ↗
04/15/2019321386488Open ↗
Showing 3 of 5 on file for this type
▸Other Documents11
▸DOB NOWDHCR Document8
08/27/2026B00895340-I1Open ↗
08/27/2026B00895340-P2Open ↗
08/13/2026B00896350-P3Open ↗
Showing 3 of 8 on file for this type
▸BISPLOT DIAGRAM2
05/01/2024321386488Open ↗
04/08/2019321386488Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/07/2024321386488Open ↗