← Back
Miscellaneous two family
25 ST FELIX STREET
BROOKLYN · BIN 3058695
💬 Discuss this project
1900Year Built
3Stories
B9Building Class
R6BZoning
3,000 sfGross Floor Area
2Units
Rent Stabilized68 Open Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 25 SAINT FELIX ASSOCIATES LLC · 1,417 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
Floor 3Under Construction33p · 1 filing · 20 docs
Floor 2Under Construction33p · 1 filing · 20 docs
Floor 1Under Construction33p · 1 filing · 20 docs
CellarUnder Construction36p · 1 filing · 20 docs
BasementUnder Construction22p · 1 filing · 20 docs
Sub-BasementUnder Construction16p · 1 filing · 20 docs
2 jobs · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/21/2026Permit IssuedCL ELECTRICAL CORPGeneral Wiring
1 job · most recent 05/07/2026
Steel Wood
FiledStatusContractorScope
05/07/2026Permit IssuedNEW HO XIN DEVELOPMENT INSteel, Wood
Building Lifecycle
All (120)Filed (6)Permit Issued (8)Violation (60)Objection (16)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
B01464484-I1-SH
09/25/2026
Permit issued — Sidewalk Shed
B01464484-I1-SF
07/20/2026
Permit issued — General Construction
B01362403-I1-GC
07/10/2026
Permit issued — Sprinklers
B01362403-S5-EW-SP
07/09/2026
Permit issued — Mechanical Systems
B01362403-S3-MS
07/09/2026
Permit issued — Plumbing
B01362403-S4-PL
07/07/2026
Permit issued — Foundation
B01362403-S2-FO
07/07/2026
Permit issued — Structural
B01362403-S1-ST
06/01/2026
Special inspection requirement — Chimneys and vents
GUNJAN KHANDWALA
05/07/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S5
05/06/2026
Special inspection requirement — Post-installed Anchors
GUNJAN KHANDWALA
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
05/05/2026
Violation issued (HPD, open)
A
04/24/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S3
04/24/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S4
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Shutoff dampers
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Maintenance information
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — Maintenance information
GUNJAN KHANDWALA
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GUNJAN KHANDWALA
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/13/2026
Special inspection requirement — Final
GUNJAN KHANDWALA
04/13/2026
Special inspection requirement — Mechanical Systems
GUNJAN KHANDWALA
04/13/2026
Special inspection requirement — Sprinkler Systems
GUNJAN KHANDWALA
04/10/2026
Special inspection requirement — Insulation placement and R values
GUNJAN KHANDWALA
04/10/2026
Special inspection requirement — Protection of exposed foundation insulation
GUNJAN KHANDWALA
04/07/2026
Objection raised — Admin
04/02/2026
Objection resolved — Resolved
03/26/2026
Objection raised — Admin
03/26/2026
Objection raised — Cost
03/20/2026
Objection raised — Zoning
03/20/2026
Objection raised — Structural
03/19/2026
Objection raised — Fire_Protection
03/17/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S2
03/17/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-S1
03/17/2026
Objection raised — Cost
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Admin
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICKEY WING KWAN CHAN
03/16/2026
Special inspection requirement — Final
MICKEY WING KWAN CHAN
03/16/2026
Special inspection requirement — Footing and Foundation
MICKEY WING KWAN CHAN
03/03/2026
Violation issued (FDNY_NOV, closed)
02/26/2026
Filed — Alteration CO
Proposed footings for a existing 3-story townhouse with cellar and basement as per plan, filed in conjunction with GC # B01362403-I1.
B01362403-I1
02/24/2026
Special inspection requirement — Lighting controls
GUNJAN KHANDWALA
02/24/2026
Special inspection requirement — Metering
GUNJAN KHANDWALA
Latest 60 of 120 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY209/26/2026
25 ST FELIX EAT909/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2025$2.6M—25 SAINT FELIX ASSOCIATES LLC → 25 ST FELIX EAT LLC$867/sf building
12/28/2022$998K—Private party → 25 SAINT FELIX ASSOCIATES LLC$332/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIOSC ARCHITECTURE PLLC405/07/2026
M C STRUCTURAL ENGINEERING203/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW HO XIN DEVELOPMENT INCGeneral Contractor407/22/2026
ACE GROUP NY CORPGeneral Contractor209/26/2026
RRP PLUMBING CORPFire Protection107/11/2026
RRP PLUMBING CORPPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962405/07/2026
M C STRUCTURAL ENGINEERIN4890203/17/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP09/25/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP09/25/2026
DOB NOWGeneral ConstructionPermit IssuedNEW HO XIN DEVELOPMENT INC07/20/2026
DOB NOWSprinklersPermit IssuedRRP PLUMBING CORP07/10/2026
DOB NOWMechanical SystemsPermit IssuedNEW HO XIN DEVELOPMENT INC07/09/2026
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP07/09/2026
DOB NOWFoundationPermit IssuedNEW HO XIN DEVELOPMENT INC07/07/2026
DOB NOWStructuralPermit IssuedNEW HO XIN DEVELOPMENT INC07/07/2026
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/01/2026Chimneys and ventsGUNJAN KHANDWALAspecial
05/06/2026Post-installed AnchorsGUNJAN KHANDWALAspecial
05/06/2026Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
04/21/2026HVAC-R and service water heating equipmentGUNJAN KHANDWALAenergy_progress
04/21/2026HVAC-R and service water heating system controlsGUNJAN KHANDWALAenergy_progress
04/21/2026Energy Code Compliance InspectionsGUNJAN KHANDWALAprogress
04/21/2026Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
04/21/2026Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
04/21/2026HVAC-R and service water piping design and insulationGUNJAN KHANDWALAenergy_progress
04/21/2026Shutoff dampersGUNJAN KHANDWALAenergy_progress
04/21/2026Maintenance informationGUNJAN KHANDWALAenergy_progress
04/21/2026Duct leakage testing, insulation and designGUNJAN KHANDWALAenergy_progress
04/21/2026HVAC-R and service water heating system controlsGUNJAN KHANDWALAenergy_progress
04/21/2026Fire-Resistance Rated ConstructionGUNJAN KHANDWALAprogress
04/21/2026Energy Code Compliance InspectionsGUNJAN KHANDWALAprogress
04/21/2026HVAC-R and service water heating equipmentGUNJAN KHANDWALAenergy_progress
04/21/2026Maintenance informationGUNJAN KHANDWALAenergy_progress
04/21/2026HVAC-R and service water piping design and insulationGUNJAN KHANDWALAenergy_progress
04/13/2026FinalGUNJAN KHANDWALAprogress
04/13/2026Mechanical SystemsGUNJAN KHANDWALAspecial
04/13/2026Sprinkler SystemsGUNJAN KHANDWALAspecial
04/10/2026Insulation placement and R valuesGUNJAN KHANDWALAenergy_progress
04/10/2026Protection of exposed foundation insulationGUNJAN KHANDWALAenergy_progress
03/17/2026Structural Stability – Alterations of existing buildingsMICKEY WING KWAN CHANspecial
03/16/2026FinalMICKEY WING KWAN CHANprogress
Latest 25 of 41.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026B01362403-S4Contact architect ↗
08/17/2026B01362403-S3Contact architect ↗
08/17/2026B01362403-S2Contact architect ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature30
09/28/2026B01362403-S3Open ↗
09/28/2026B01362403-S3Open ↗
09/28/2026B01362403-S3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026B01362403-S3Open ↗
09/28/2026B01362403-S3Open ↗
09/28/2026B01362403-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026B01362403-S3Open ↗
08/17/2026B01362403-S5Open ↗
08/17/2026B01362403-S2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist6
08/17/2026B01362403-S3Open ↗
08/17/2026B01362403-S4Open ↗
08/17/2026B01362403-S5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist1
08/17/2026B01362403-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026B01362403-S3Open ↗
08/17/2026B01362403-S2Open ↗
08/17/2026B01362403-S5Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01362403-I1Open ↗