← Back
Office only, 2-6 stories
73 SOUTH ELLIOTT PLACE
BROOKLYN · BIN 3058774
💬 Discuss this project
1925Year Built
3Stories
O2Building Class
R6BZoning
12,000 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
Office only, 2-6 stories · 4,000 sf lot · 3 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 2 filings · 11 docs
Floor 61p · 1 filing · 8 docs
Floor 51p · 1 filing · 8 docs
Floor 41p · 1 filing · 8 docs
Floor 32p · 2 filings · 11 docs
Floor 22p · 2 filings · 11 docs
Floor 12p · 3 filings · 14 docs
Cellar2p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
40 ACRES A MULE FILMWORKS1507/08/2026
40 ACRES S MULE103/22/2026
40 ACRES AND A MULE FI103/22/2026
OWNERS OF #73 S. E. PL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LPE ENGINEERING, PC205/23/2023
REX A. HEUERMANN, ARCHITECT P.C.208/04/2022
ROGER DE ELECTRIC CO.206/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REX A HEUERMANN ARCHITECT P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTANDREA, CElectrical203/21/2026
TORRES, OSCARElectrical203/21/2026
KAGAN, RElectrical103/21/2026
BURRELL, MARKElectrical103/21/2026
FULL CIRCLE PLUMBING CORP.Plumbing103/22/2026
TROJAN INTERIORS INCGeneral Contractor107/08/2026
CUMMINGS, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LPE ENGINEERING PC3102205/23/2023
Building Lifecycle
All (95)Filed (6)Permit Issued (1)Signed Off (1)Violation (58)Objection (13)Special Inspection (16)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2023
Signed off — Alteration
SHORING ASSOCIATED WITH VAULT REPAIR FILED ON APPLICATION NUMBER 340776501 AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08008966-I1
05/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Roberta Levine
05/25/2023
Special inspection requirement — Final
Roberta Levine
05/23/2023
Filed — Alteration
SHORING ASSOCIATED WITH VAULT REPAIR FILED ON APPLICATION NUMBER 340776501 AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08008966-P1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2023
Objection raised — Other
12/06/2022
Permit issued — Structural
B08008966-I1-ST
10/26/2022
Objection raised — Other
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Other
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Other
10/26/2022
Objection resolved — Addressed
10/19/2022
Filed — Alteration
SHORING ASSOCIATED WITH VAULT REPAIR FILED ON APPLICATION NUMBER 340776501 AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08008966-I1
08/10/2022
Objection raised — Inspections
08/10/2022
Objection resolved — Resolved
08/10/2022
Objection raised — Structural
08/10/2022
Objection resolved — Addressed
08/10/2022
Objection raised — Scope
08/10/2022
Objection resolved — Resolved
08/04/2022
Filed — Alteration
INTERIOR RENO. REPLACING AND REPAIRING EXISTING PARTITIONS AND FINISHES AT THE 1st FL PANTRY LOCATION, Replace wood flooring at 2nd FL level. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00695223-I1
08/04/2022
Filed — Alteration
REPLACE EXISTING 12'-0" WIDE CURB CUT INSTALLED ALONG SOUTH ELLIOTT PLACE.
B00654382-I1
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/15/2022
Special inspection requirement — Energy Code Compliance Inspections
03/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
03/15/2022
Special inspection requirement — Interior lighting power
03/15/2022
Special inspection requirement — Lighting controls
03/09/2022
Special inspection requirement — Final
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2021
Violation issued (ECB, closed)
Zoning
07/16/2021
Violation issued (ECB, closed)
Construction
07/16/2021
Violation issued (ECB, closed)
Construction
07/02/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Filed — Alteration
Installation of snowmelt system.
B00517793-I1
05/19/2021
Filed — Alteration
Mechanical work includes new roof top units and new duct distribution throughout building to provide ventilation throughout all floors, cellar thru Roof. No change in use, egress, or occupancy under this application.
B00513664-I1
04/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2021
Special inspection requirement — Final
04/30/2021
Special inspection requirement — Mechanical Systems
04/30/2021
Special inspection requirement — Energy Code Compliance Inspections
04/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
04/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
04/30/2021
Special inspection requirement — Maintenance information
04/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
08/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2014
Violation issued (ECB, closed)
Zoning
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2013
Violation issued (ECB, closed)
Elevators
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTROJAN INTERIORS INC12/06/2022
BISOTISSUEDTROJAN INTERIORS INC04/05/2021
BISPLISSUEDGREST CITY PLBG. & HGT. CORP.07/07/2008
BISOTISSUEDLEXCORE ASSOCIATES INC03/04/2008
BISOTISSUEDLEXCORE ASSOCIATES INC03/04/2008
BISMHISSUEDLEXCORE ASSOCIATES INC03/04/2008
BISMHISSUEDVIRGO & GIGLIO CONTTRACTING CORP10/01/2002
2 projects · most recent 06/08/2021
Others Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2021——Others
Other
Weil-Mclain EVG 299 280,000 BTU · Boiler ×1
__Junk__ LB31-40 250,000 BTU · Heat Exchanger ×1
05/19/2021——Associated Ducts and Piping, Ventilation Systems
Cooling
Carrier 48LCEA14A2M5-1S2C0 12 tons · Rooftop Unit ×1
Heating
Carrier 48LCEA14A2M5-1S2C0 12 tons · Rooftop Unit ×1
Ventilation
Carrier 48LCEA14A2M5-1S2C0 12 tons · Rooftop Unit ×1
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/25/2023Structural Stability – Alterations of existing buildingsRoberta Levinespecial
05/25/2023FinalRoberta Levineprogress
03/15/2022Fire-Resistant Penetrations and Joints—special
03/15/2022Energy Code Compliance Inspections—progress
03/15/2022Fire-Resistance Rated Construction—progress
03/15/2022Interior lighting power—energy_progress
03/15/2022Lighting controls—energy_progress
03/09/2022Final—progress
04/30/2021Fire-Resistant Penetrations and Joints—special
04/30/2021Final—progress
04/30/2021Mechanical Systems—special
04/30/2021Energy Code Compliance Inspections—progress
04/30/2021HVAC-R and service water heating system controls—energy_progress
04/30/2021HVAC-R and service water heating equipment—energy_progress
04/30/2021Maintenance information—energy_progress
04/30/2021HVAC-R and service water piping design and insulation—energy_progress
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00513664-I1Request digital key ↗
09/01/2026B00517793-I1Request digital key ↗
08/28/2026B00695223-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
06/04/2021310071702Open ↗
04/05/2021340776501Open ↗
07/07/2008310071702Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
11/20/2021310071702Open ↗
06/23/2021340776501Open ↗
06/18/2021340776501Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00513664-I1Open ↗
09/01/2026B00517793-I1Open ↗
08/27/2026B08008966-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/04/2008310071702Open ↗
03/04/2008310071702Open ↗
03/04/2008310071702Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT3
01/29/2008310071702Open ↗
01/28/2008310071702Open ↗
01/28/2008310071702Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/19/2020340776501Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/19/2020340776501Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/19/2020340776501Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B08008966-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B08008966-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
05/27/2021310071702Open ↗
12/19/2007310071702Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00513664-I1Open ↗
09/01/2026B00517793-I1Open ↗
08/15/2026B08008966-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/19/2007310071702Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/19/2020340776501Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/27/2021310071702Open ↗
10/19/2020340776501Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/05/2021340776501Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
04/05/2021340776501Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/05/2021340776501Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
04/05/2021340776501Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/14/2022310071702Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/18/2022310071702Open ↗
▸BISLANDMARKS SIGNOFF1
07/23/2021310071702Open ↗
▸BISFINAL1
04/05/2021340776501Open ↗
▸BISLANDMARKS APPROVAL1
02/15/2008310071702Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/19/2007310071702Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
10/19/2020340776501Open ↗
07/07/2008310071702Open ↗
03/04/2008310071702Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/23/2021310071702Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
06/04/2021310071702Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/19/2020340776501Open ↗
▸BISADDITIONAL INFORMATION1
06/23/2021340776501Open ↗
▸Other Documents3
▸BIS* FIRE STOPS 27-3451
05/27/2021310071702Open ↗
▸BIS* NOISE CONTROL TESTS 27-768,769,7701
07/23/2021310071702Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
05/27/2021310071702Open ↗