Miscellaneous two family
37 SOUTH PORTLAND AVE
BROOKLYN · BIN 3058869
💬 Discuss this project
1867Year Built
3Stories
B9Building Class
R6BZoning
4,136 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 2,200 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 7 docs
Floor 41p · 1 filing · 7 docs
Floor 31p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
Cellar4p · 2 filings · 15 docs
Basement4p · 2 filings · 15 docs
1 job · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026Permit Issued5 J'S ELECTL CONTS CORPGeneral Wiring
Building Lifecycle
All (28)Filed (3)Permit Issued (2)Signed Off (2)Violation (4)Objection (4)Special Inspection (13)
12/18/2024
Signed off — Alteration
Shoring elements installed to stabilize structure and rebuilding of partially collapsed party wall
B01144539-I1
12/18/2024
Permit issued — General Construction
B01144539-I1-GC-CX
11/27/2024
Filed — Alteration
Shoring elements installed to stabilize structure and rebuilding of partially collapsed party wall
B01144539-I1
11/27/2024
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Concrete - Cast-In-Place
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Demolition
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Masonry
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Post-installed Anchors
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Structural Steel - Details
RAUL VELASQUEZ MARTINEZ
11/27/2024
Special inspection requirement — Structural Steel - Welding
RAUL VELASQUEZ MARTINEZ
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
11/19/2024
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
11/19/2024
Special inspection requirement — Footing and Foundation
RAUL VELASQUEZ MARTINEZ
11/12/2024
Signed off — Alteration
1.DEMOLITION OF 2 STORY MASONRY PARTY WALL. 2. REMOVE AND LEGALLY DISPOSE OF ALL DEBRIS. 3. THE DEMOLITION SHALL BE DONE GENERALLY IN THE SEQUENCE AND MANNER INDICATED ON THESE DRAWINGS, USING THE EQUIPMENT SHOWN ON THESE DRAWINGS.
B01084309-I1
10/04/2024
Permit issued — Structural
B01084309-I1-GC-CX
10/02/2024
Objection resolved — Addressed
10/01/2024
Objection raised — Scope
09/30/2024
Filed — Alteration
1.DEMOLITION OF 2 STORY MASONRY PARTY WALL. 2. REMOVE AND LEGALLY DISPOSE OF ALL DEBRIS. 3. THE DEMOLITION SHALL BE DONE GENERALLY IN THE SEQUENCE AND MANNER INDICATED ON THESE DRAWINGS, USING THE EQUIPMENT SHOWN ON THESE DRAWINGS.
B01084309-P1
09/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
09/27/2024
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
07/31/2024
Objection resolved — Addressed
07/30/2024
Objection raised — Scope
07/23/2024
Filed — Alteration
1.DEMOLITION OF 2 STORY MASONRY PARTY WALL. 2. REMOVE AND LEGALLY DISPOSE OF ALL DEBRIS. 3. THE DEMOLITION SHALL BE DONE GENERALLY IN THE SEQUENCE AND MANNER INDICATED ON THESE DRAWINGS, USING THE EQUIPMENT SHOWN ON THESE DRAWINGS.
B01084309-I1
07/19/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/17/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BGM ENGINEERING311/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VADEM BRODSKY303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ENDO SERVICES LLCGeneral Contractor603/21/2026
5 J'S ELECTL CONTS CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514311/27/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENDO SERVICES LLC12/18/2024
DOB NOWStructuralSigned-offENDO SERVICES LLC10/04/2024
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/27/2024Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
11/27/2024Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
11/27/2024DemolitionRAUL VELASQUEZ MARTINEZspecial
11/27/2024Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
11/27/2024MasonryRAUL VELASQUEZ MARTINEZspecial
11/27/2024Post-installed AnchorsRAUL VELASQUEZ MARTINEZspecial
11/27/2024Structural Steel - DetailsRAUL VELASQUEZ MARTINEZspecial
11/27/2024Structural Steel - WeldingRAUL VELASQUEZ MARTINEZspecial
11/19/2024Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
11/19/2024FinalRAUL VELASQUEZ MARTINEZprogress
11/19/2024Footing and FoundationRAUL VELASQUEZ MARTINEZprogress
09/27/2024Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
09/27/2024FinalRAUL VELASQUEZ MARTINEZprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01084309-I1Request digital key ↗
08/23/2026B01144539-I1Request digital key ↗
08/15/2026B01084309-P1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026B01144539-I1Open ↗
08/13/2026B01084309-I1Open ↗
08/13/2026B01084309-P1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01084309-I1Open ↗
08/24/2026B01084309-P1Open ↗
08/13/2026B01144539-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01144539-I1Open ↗
08/28/2026B01084309-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B01144539-I1Open ↗
08/28/2026B01084309-P1Open ↗
▸Other Documents2
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026B01144539-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01144539-I1Open ↗