← Back
Predominantly retail with other uses
763 FULTON STREET
BROOKLYN · BIN 3059338
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R7AZoning
1,241 sfGross Floor Area
2Units
Rent Stabilized12 Open Violations 5 unresolved · 7 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: OWONIRAN PROPERTIES, LLC · 1,210 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 5 docs
Floor 111p · 2 filings · 19 docs
Cellar9p · 1 filing · 14 docs
1 job · most recent 06/20/2025
Ventilation Systems
FiledStatusContractorScope
06/20/2025——Ventilation Systems
2 jobs · most recent 06/20/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/20/2025Permit IssuedG. ROLLINS PLBG & HTG LLCGas, Water/Sanitary
03/30/2023——Storm, Water/Sanitary
1 job · most recent 12/29/2022
Steel
FiledStatusContractorScope
12/29/2022——Steel
Building Lifecycle
All (72)Filed (5)Permit Issued (2)Violation (15)Inspection (6)Objection (29)Special Inspection (15)
11/24/2025
Violation issued (HPD, open)
I
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/02/2025
Permit issued — Plumbing
B00898069-I1-PL
09/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/20/2025
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER. INSTALL NEW NON RESIDENTIAL COOKING EQUIPMENT CONSISTING OF ONE 4 BURNER STOVE, 2 DEEP FRYERS, AND 1 GRILL. INSTALL ONE (1) NEW ANSUL VALVE AND 1 NEW GREASETRAP. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00898069-P2
12/04/2024
Violation issued (HPD, open)
I
10/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2023
Permit issued — Plumbing
B00898069-I1-PL
07/06/2023
Objection raised — Other
07/06/2023
Objection resolved — Addressed
07/03/2023
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER. INSTALL NEW NON RESIDENTIAL COOKING EQUIPMENT CONSISTING OF ONE 4 BURNER STOVE, 2 DEEP FRYERS, AND 1 GRILL. INSTALL ONE (1) NEW ANSUL VALVE AND 1 NEW GREASETRAP. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00898069-S1
07/03/2023
Special inspection requirement — Maintenance information
Steven Williams
07/03/2023
Special inspection requirement — Shutoff dampers
Steven Williams
06/30/2023
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER. INSTALL NEW NON RESIDENTIAL COOKING EQUIPMENT CONSISTING OF ONE 4 BURNER STOVE, 2 DEEP FRYERS, AND 1 GRILL. INSTALL ONE (1) NEW ANSUL VALVE AND 1 NEW GREASETRAP. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00898069-I1
06/29/2023
Special inspection requirement — Mechanical Systems
Steven Williams
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
06/29/2023
Special inspection requirement — Final
05/11/2023
Objection raised — Other
05/11/2023
Objection resolved — Resolved
05/11/2023
Objection raised — Other
05/11/2023
Objection resolved — Resolved
05/11/2023
Objection resolved — Resolved
04/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
04/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
04/17/2023
Objection raised — Other
04/17/2023
Objection raised — Inspections
04/12/2023
Violation issued (HPD, closed)
I
04/11/2023
Violation issued (HPD, closed)
C
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
04/06/2023
Objection raised — Other
04/06/2023
Objection raised — Other
03/30/2023
Filed — Alteration
FILE TO PROPOSED INSTALL NEW GAS PIPE LINE, AND RELOCATE GAS METER, (1) TWO COMP. SINK, (1) NEW GAS RANGE 4 BONERS, ALSO INSTALL A YARD DRAIN FOR WALKING BOX. AND TO INSTALL A DRYWELL AT REAR YARD (OSP). SEE SITE PLAN.
B08010867-I1
03/30/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
03/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Steven Williams
03/22/2023
Objection resolved — Addressed
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection resolved — Addressed
03/20/2023
Objection raised — Other
03/20/2023
Objection raised — Other
03/20/2023
Objection raised — Other
03/20/2023
Objection raised — Other
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection resolved — Addressed
02/07/2023
Objection raised — Other
02/02/2023
Special inspection requirement — Masonry
SYED RIZVI
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
02/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
SYED RIZVI
01/05/2023
Objection raised — Other
01/05/2023
Objection raised — Other
01/05/2023
Objection raised — Other
12/29/2022
Filed — Alteration
PROVIDE PROTECTION AT SIDES OF EXCAVATION DURING INSTALLATIONOF BLDG FOOTING, PROVIDED SHORING PROTECTION AT EXCAVATION AS REQUIRED. TO COMPLY WITH VIOLATION # 34867857M. 34867855Z,
B08010859-I1
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A B HOME BUILDERS403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIKE TECH ASSOCIATES LLC203/21/2026
JULIAN ALBERTO GOMEZ103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GAROFALO, FRANKElectrical103/21/2026
LARICOS, JOHNElectrical103/21/2026
LATCHA, RAJENDRAElectrical103/21/2026
DJ INTERNATIONAL PLBG INCPlumbing107/08/2026
G. ROLLINS PLBG & HTG LLCPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804406/20/2025
RIKE TECH ASSOCIATES LLC2965112/29/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedG. ROLLINS PLBG & HTG LLC09/02/2025
DOB NOWPlumbingPermit IssuedDJ INTERNATIONAL PLBG INC07/24/2023
BISOTISSUEDRIKE ASSOCIATES INC09/27/2022
BISOTISSUEDA&B HOME BUILDERS CORP11/09/2009
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsSteven Williamsspecial
07/03/2023Maintenance informationSteven Williamsenergy_progress
07/03/2023Shutoff dampersSteven Williamsenergy_progress
06/29/2023Mechanical SystemsSteven Williamsspecial
06/29/2023Fire-Resistant Penetrations and JointsSteven Williamsspecial
06/29/2023Final—progress
04/27/2023HVAC-R and service water heating system controls—energy_progress
04/27/2023HVAC-R and service water heating equipment—energy_progress
03/30/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
03/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSteven Williamsspecial
02/02/2023MasonrySYED RIZVIspecial
02/02/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/02/2023Fire-Resistance Rated ConstructionSYED RIZVIprogress
09/27/2022Energy Code Compliance InspectionsSYED RIZVIprogress
09/27/2022Energy Code Compliance Inspections—progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08010859-S1Request digital key ↗
08/27/2026B00898069-S1Request digital key ↗
08/27/2026B00898069-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
09/30/2022320093108Open ↗
11/10/2009320093108Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/10/2009320093108Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00898069-I1Open ↗
08/13/2026B00898069-P2Open ↗
08/13/2026B00898069-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00898069-I1Open ↗
08/31/2026B08010859-I1Open ↗
08/31/2026B08010859-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/10/2009320093108Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/10/2009320093108Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/10/2009320093108Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B00898069-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00898069-I1Open ↗
08/13/2026B08010859-I1Open ↗
08/13/2026B00898069-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/10/2009320093108Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSUPERSEDING LETTER1
09/30/2022320093108Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/10/2009320093108Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/10/2009320093108Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/10/2009320093108Open ↗
▸Other Documents2
▸DOB NOWWaiver Document2
08/27/2026B00898069-I1Open ↗
08/13/2026B00898069-P2Open ↗