Primarily 2 family with 1 store or office
290 BROADWAY
BROOKLYN · BIN 3059657
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
C4-3Zoning
2,290 sfGross Floor Area
3Units
Rent StabilizedFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 290 BROADWAY REALTY CORP. · 911 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 1Under Construction14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
290 BROADWAY REALTY CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUSTAINABLE DESIGN ENGINEERING PLLC605/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WE R DECOR CORPGeneral Contractor204/09/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404305/11/2026
Building Lifecycle
All (27)Filed (6)Permit Issued (3)Objection (10)Special Inspection (8)
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
05/18/2026
Special inspection requirement — Final
Kayan Tse
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
05/18/2026
Special inspection requirement — Interior lighting power
Kenny Mak
05/11/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-P3
05/11/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-P2
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
04/09/2026
Special inspection requirement — Final
Kayan Tse
04/09/2026
Special inspection requirement — Interior lighting power
Kenny Mak
01/14/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-P1
12/08/2025
Permit issued — Plumbing
B01244011-S1-PL
08/22/2025
Permit issued — General Construction
B01244011-I1-GC
08/07/2025
Permit issued — Mechanical Systems
B01244011-S2-MS
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Fire_Protection
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Mechanical
08/04/2025
Objection raised — Scope
08/04/2025
Objection raised — Admin
07/25/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-S1
07/25/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-I1
07/25/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 HAND SINK, (1) 3-COMP SINK, 1 MOP SINK, 1 F.D.) AND (1 GREASE TRAP) AT THE CELLAR. REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC) AT 1ST FLOOR.
B01244011-S2
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedWE R DECOR CORP08/22/2025
DOB NOWMechanical SystemsPermit IssuedWE R DECOR CORP08/07/2025
BISPLISSUEDL&J PLG & HTG CO OF NY IN07/08/2002
BISOTISSUEDA M P CONSTRUCTION CORP06/17/2002
1 project · most recent 05/11/2026
Water/Sanitary
FiledStatusContractorScope
05/11/2026Permit IssuedCAPE PLUMBING INCWater/Sanitary
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/18/2026Fire-Resistant Penetrations and JointsKenny Makspecial
05/18/2026FinalKayan Tseprogress
05/18/2026Energy Code Compliance InspectionsKenny Makprogress
05/18/2026Interior lighting powerKenny Makenergy_progress
04/09/2026Fire-Resistant Penetrations and JointsKenny Makspecial
04/09/2026Energy Code Compliance InspectionsKenny Makprogress
04/09/2026FinalKayan Tseprogress
04/09/2026Interior lighting powerKenny Makenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026B01244011-S1Request digital key ↗
08/17/2026B01244011-P1Request digital key ↗
08/17/2026B01244011-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026B01244011-P2Open ↗
08/29/2026B01244011-P2Open ↗
08/29/2026B01244011-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B01244011-P1Open ↗
08/17/2026B01244011-S2Open ↗
08/17/2026B01244011-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026B01244011-P2Open ↗
08/29/2026B01244011-P4Open ↗
08/29/2026B01244011-P4Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01244011-P1Open ↗
08/17/2026B01244011-S2Open ↗
08/17/2026B01244011-P4Open ↗
Showing 3 of 7 on file for this type