← Back
Single or multiple dwelling with stores or offices
33 LEE AVENUE
BROOKLYN · BIN 3059911
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
R6Zoning
4,000 sfGross Floor Area
5Units
15 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 33 LEE LLC · 2,140 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YELLOW HAT CONSTGRUCTION INC504/09/2026
33 LEE LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR A. GORDON, PE PC202/17/2026
ASHRAF CORP112/19/2025
KMA DESIGNS LLC110/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME INSTALLATIONS CORGeneral Contractor204/09/2026
YELLOW HAT CONSTRUCTION IGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VICTOR A. GORDON, P.E.1477202/17/2026
Building Lifecycle
All (30)Filed (4)Permit Issued (3)Signed Off (2)Violation (16)Special Inspection (5)
04/28/2026
Signed off — Alteration
B01305204-I1
04/28/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01337285-I1
03/23/2026
Permit issued — General Construction
B01333609-I1-GC
02/18/2026
Special inspection requirement — Post-installed Anchors
VICTOR GORDON
02/18/2026
Special inspection requirement — Masonry
VICTOR GORDON
02/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
VICTOR GORDON
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VICTOR GORDON
02/18/2026
Special inspection requirement — Final
VICTOR GORDON
02/17/2026
Filed — Alteration
FACADE REPAIR TO COMPLY WITH DOB VIOLATION NUMBER P130102HZ AND OATH VIOLATION NUMBER 35719036R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01333609-P1
02/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2025
Permit issued — Supported Scaffold
B01337285-I1-SF
12/19/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01337285-I1
12/15/2025
Filed — Alteration
FACADE REPAIR TO COMPLY WITH DOB VIOLATION NUMBER P130102HZ AND OATH VIOLATION NUMBER 35719036R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01333609-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Permit issued — Sidewalk Shed
B01305204-I1-SH
10/20/2025
Filed — Alteration
B01305204-I1
10/15/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Violation issued (ECB, open)
Construction
10/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2007
Violation issued (HPD, open)
B
10/10/2005
Violation issued (HPD, open)
B
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedYELLOW HAT CONSTRUCTION I03/23/2026
DOB NOWSupported ScaffoldSigned-offSUPREME INSTALLATIONS COR12/22/2025
DOB NOWSidewalk ShedSigned-offSUPREME INSTALLATIONS COR10/21/2025
2 projects · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteRICHARD NEU—
01/30/2019Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 02/17/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/17/2026Permit IssuedYELLOW HAT CONSTRUCTION ITenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/18/2026Post-installed AnchorsVICTOR GORDONspecial
02/18/2026MasonryVICTOR GORDONspecial
02/18/2026Tenant Protection Plan ComplianceVICTOR GORDONspecial
02/18/2026Structural Stability – Alterations of existing buildingsVICTOR GORDONspecial
02/18/2026FinalVICTOR GORDONprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01305204-I1Request digital key ↗
08/19/2026B01337285-I1Request digital key ↗
08/18/2026B01333609-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01337285-I1Open ↗
08/18/2026B01333609-I1Open ↗
08/18/2026B01333609-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01333609-I1Open ↗
08/27/2026B01333609-I1Open ↗
08/27/2026B01333609-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01333609-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026B01333609-P1Open ↗
08/18/2026B01333609-I1Open ↗