← Back
Old law tenement
125 BEDFORD AVENUE
BROOKLYN · BIN 3061614
💬 Discuss this project
1900Year Built
4Stories
C4Building Class
R6AZoning
8,000 sfGross Floor Area
8Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Old law tenement · Owner of record: 125 BEDFORD AVE REALTY CORP. · 2,500 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Roof3p · 1 filing · 4 docs
Floor 13p · 3 filings · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 BEDFORD AVE REALTY1604/21/2026
CONCORD CONST CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL MCVANN P.E.104/16/2026
TAN ENGINEERING PC609/15/2022
RIP CONSTRUCTION CONSULTANTS208/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIP CC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCURATE MECHANICAL INCPlumbing607/08/2026
SAMSON BUILDING CONSULTANGeneral Contractor403/21/2026
ANTHONY COSCHIGANO IIIElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FORDHAM REFRIGERATION & A5864104/16/2026
TAN ENGINEERING, P.C.1291609/15/2022
Building Lifecycle
All (90)Filed (9)Permit Issued (4)Signed Off (3)Violation (30)Inspection (3)Objection (11)Special Inspection (30)
07/16/2026
Objection raised — Structural
07/16/2026
Objection raised — Scope
07/16/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Admin
07/16/2026
Objection raised — Zoning
07/16/2026
Objection raised — Zoning
07/16/2026
Objection raised — Admin
07/16/2026
Objection resolved — Resolved
04/20/2026
Objection raised — Zoning
04/20/2026
Objection raised — Scope
04/20/2026
Objection resolved — Addressed
04/16/2026
Filed — Alteration
HVAC MODIFICATION AS PER PLANS. INSTALLATION OF NEW HEAT PUMP SYSTEM WITH ASSOCIATED PIPING AND DUCTWORK AS PER PLANS. DUNNAGE AS PER STRUCTURAL PLANS. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
B01384446-I1
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL MCVANN
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL MCVANN
04/08/2026
Special inspection requirement — Final
MICHAEL MCVANN
04/08/2026
Special inspection requirement — Structural Steel - Details
04/08/2026
Special inspection requirement — Mechanical Systems
MICHAEL MCVANN
04/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MCVANN
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL MCVANN
10/31/2025
Violation issued (FDNY_ORDER, closed)
10/31/2025
Violation issued (FDNY_ORDER, closed)
04/08/2024
Violation issued (HPD, closed)
A
08/02/2023
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES, INSTALL NEW GAS PIPING AND GAS PLUMBING FIXTURES AS PER PLAN. EXISTING METER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
B00605019-I1
07/13/2023
Violation issued (ECB, closed)
Construction
03/21/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
11/04/2022
Signed off — Alteration
Direct replace kitchen exhaust hood, new louver at exterior, new kitchen exhaust fan and toilet exhaust fan for ADA bathroom filed in conjunction with PL B00605019. No change in use, egress or occupancy proposed. Ansul system filed at FDNY
B00605168-I1
10/27/2022
Signed off — Alteration
The GC is file for minor interior work repair patch and paint where necessary and new seating arrangement at the first floor only. No change to use, egress, occupancy.
B00604615-I1
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
09/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
09/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
09/15/2022
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES, INSTALL NEW GAS PIPING AND GAS PLUMBING FIXTURES AS PER PLAN. EXISTING METER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
B00605019-P3
09/15/2022
Special inspection requirement — Ventilation and air distribution system
Roger Tan
09/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
09/15/2022
Special inspection requirement — Final
Roger Tan
09/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
09/15/2022
Special inspection requirement — Maintenance information
Roger Tan
09/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
09/15/2022
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
09/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
09/15/2022
Special inspection requirement — Shutoff dampers
Roger Tan
09/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
09/15/2022
Special inspection requirement — Mechanical Systems
Roger Tan
09/14/2022
Filed — Alteration
Direct replace kitchen exhaust hood, new louver at exterior, new kitchen exhaust fan and toilet exhaust fan for ADA bathroom filed in conjunction with PL B00605019. No change in use, egress or occupancy proposed. Ansul system filed at FDNY
B00605168-P1
09/12/2022
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
09/12/2022
Special inspection requirement — Shutoff dampers
Roger Tan
09/12/2022
Special inspection requirement — Ventilation and air distribution system
Roger Tan
09/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
09/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
09/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
08/23/2022
Special inspection requirement — Final
Edward Guterman
08/19/2022
Filed — Alteration
The GC is file for minor interior work repair patch and paint where necessary and new seating arrangement at the first floor only. No change to use, egress, occupancy.
B00604615-P1
12/21/2021
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES, INSTALL NEW GAS PIPING AND GAS PLUMBING FIXTURES AS PER PLAN. EXISTING METER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
B00605019-P2
12/16/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/07/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/23/2021
Permit issued — Plumbing
B00605019-I1-PL
11/04/2021
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES, INSTALL NEW GAS PIPING AND GAS PLUMBING FIXTURES AS PER PLAN. EXISTING METER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
B00605019-P1
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offANTHONY DISABATO11/23/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO11/01/2021
DOB NOWMechanical SystemsSigned-offSAMSON BUILDING CONSULTAN10/28/2021
DOB NOWGeneral ConstructionSigned-offSAMSON BUILDING CONSULTAN10/21/2021
BISBLISSUEDJ.JEKOWSKY & SONS07/23/1997
BISPLISSUEDJ.JEKOWSKY & SONS07/23/1997
BISFPISSUEDIDEAL FIRE CONTROL10/24/1995
BISOTISSUEDBERES PB & ALE08/15/1994
BISOTISSUEDBERES BAR & PUB12/22/1993
1 project · most recent 04/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2026——Heating and Air Conditioning Systems
Heat / Cool
2 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
09/19/2023CancelledECNY ELEC'L CONTR'S, INCGeneral Wiring
1 project · most recent 04/16/2026
Steel
FiledStatusContractorScope
04/16/2026——Steel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/08/2026HVAC-R and service water piping design and insulationMICHAEL MCVANNenergy_progress
04/08/2026HVAC-R and service water heating equipmentMICHAEL MCVANNenergy_progress
04/08/2026FinalMICHAEL MCVANNprogress
04/08/2026Structural Steel - Details—special
04/08/2026Mechanical SystemsMICHAEL MCVANNspecial
04/08/2026Tenant Protection Plan Compliance—special
04/08/2026Fire-Resistant Penetrations and JointsMICHAEL MCVANNspecial
04/08/2026HVAC-R and service water heating system controlsMICHAEL MCVANNenergy_progress
09/19/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/19/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/19/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
09/19/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/15/2022Ventilation and air distribution systemRoger Tanenergy_progress
09/15/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
09/15/2022FinalRoger Tanprogress
09/15/2022Energy Code Compliance InspectionsRoger Tanprogress
09/15/2022Maintenance informationRoger Tanenergy_progress
09/15/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/15/2022Duct leakage testing, insulation and designRoger Tanenergy_progress
09/15/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/15/2022Shutoff dampersRoger Tanenergy_progress
09/15/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/15/2022Mechanical SystemsRoger Tanspecial
09/12/2022Duct leakage testing, insulation and designRoger Tanenergy_progress
09/12/2022Shutoff dampersRoger Tanenergy_progress
Latest 25 of 44.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00605168-I1Request digital key ↗
09/01/2026B00605168-P1Request digital key ↗
09/01/2026B00605019-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
12/04/2023301985859Open ↗
10/31/2023300350643Open ↗
08/04/2023301985859Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature13
09/28/2026B00605168-P1Open ↗
09/28/2026B00605168-P1Open ↗
09/28/2026B00605168-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00605168-P1Open ↗
09/01/2026B00605168-I1Open ↗
09/01/2026B00605019-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026B00605168-P1Open ↗
08/29/2026B00605168-I1Open ↗
08/27/2026B00605019-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026B01384446-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00605168-P1Open ↗
09/01/2026B00605168-I1Open ↗
09/01/2026B00605019-P3Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00605019-I1Open ↗
08/13/2026B00605168-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/03/2023300317618Open ↗
05/01/2023300317618Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
05/01/2023300317618Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/01/2023300317618Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/04/2023300317618Open ↗
01/17/2023300636916Open ↗
04/03/2020300636916Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
04/03/2020300636916Open ↗
04/03/2020300350643Open ↗
▸BISADDITIONAL INFORMATION1
03/06/2023300317618Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
01/17/2023300636916Open ↗