← Back
Walk-up cooperative
151 GRAND STREET
BROOKLYN · BIN 3062626
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R6BZoning
8,200 sfGross Floor Area
8Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 149-51 GRAND ST HOS D · 2,366 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
StructuralMechanicalGeneral
Roof13p · 1 filing · 4 docs
Floor 413p · 1 filing · 4 docs
Floor 313p · 1 filing · 4 docs
Floor 213p · 1 filing · 4 docs
Floor 115p · 2 filings · 9 docs
7 jobs · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
02/25/2026Permit IssuedAEX ELECTRIC LLC9 meters
12/19/2023CompleteD.R.P. ELEC'L CONTRG INC1 meters
07/19/2023Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
07/20/2022CompleteRJ RUSSO ELECTRIC CO.1 meters, 1 new_meters
07/16/2020CompleteCRM ELECTRIC CORPGeneral Wiring
02/06/2020Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 job · most recent 06/05/2026
Sidewalk Shed
FiledStatusContractorScope
06/05/2026Permit IssuedACE GROUP NY CORPSidewalk Shed
Building Lifecycle
All (54)Filed (4)Permit Issued (5)Signed Off (1)Violation (43)Inspection (1)
07/16/2026
Permit issued — Sidewalk Shed
B01412507-I1-SH
06/05/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01412507-I1
11/24/2025
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2025
Violation issued (HPD, closed)
C
07/09/2025
Violation issued (HPD, closed)
C
07/09/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
A
03/08/2025
Violation issued (HPD, closed)
A
03/08/2025
Violation issued (HPD, closed)
B
03/08/2025
Violation issued (HPD, closed)
A
03/08/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/03/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/09/2024
Permit issued — General Construction
B00984981-I1-GC
01/19/2024
Filed — Alteration
Propose interior renovation @ partial 3rd floor Apt#6 with partition work and floor finish as per plan. No change in use, egress, or occupancy.
B00984981-I1
11/20/2023
Permit issued — Mechanical Systems
B08008974-I1-MS
04/06/2023
Violation issued (ECB, closed)
Construction
04/05/2023
Violation issued (HPD, closed)
A
04/05/2023
Violation issued (HPD, closed)
B
04/05/2023
Violation issued (HPD, closed)
B
04/05/2023
Violation issued (HPD, closed)
A
04/05/2023
Violation issued (HPD, closed)
A
03/23/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
10/15/2022
Filed — Alteration
B08008974-I1
03/24/2022
Signed off — Alteration
B00519425-I1
02/25/2022
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
08/18/2021
Permit issued — Structural
B00519425-I1-ST
08/18/2021
Permit issued — General Construction
B00519425-I1-GC
06/18/2021
Filed — Alteration
B00519425-I1
04/09/2021
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
01/15/2020
Violation issued (HPD, closed)
C
10/17/2018
Violation issued (HPD, closed)
I
09/30/2018
Violation issued (HPD, open)
B
11/22/2017
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
03/21/2007
Violation issued (HPD, open)
B
11/21/2005
Violation issued (HPD, open)
B
11/21/2005
Violation issued (HPD, open)
C
11/21/2005
Violation issued (HPD, open)
C
05/02/2000
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
05/02/2000
Violation issued (ECB, closed)
Construction
07/09/1999
Violation issued (HPD, open)
B
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY208/29/2026
BLOCPOWER307/08/2026
149-51 GRAND ST HOS D203/22/2026
BEST ENERGY POWER 2015 LL103/22/2026
OWNER OF 149-51 GRAND STR103/22/2026
149-151 GRAND ST HDFC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC203/21/2026
MODERN BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK & HAMMER CONSTRUCTIOGeneral Contractor303/21/2026
L & Z CONSULTING CORPGeneral Contractor207/08/2026
ACE GROUP NY CORPGeneral Contractor107/17/2026
SUPER COOL HVAC, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449101/19/2024
WELLS DESIGN & CONSULTING7750110/15/2022
CHEN ENGINEERING SERVICES1826106/18/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP07/16/2026
DOB NOWGeneral ConstructionSigned-offROCK & HAMMER CONSTRUCTIO02/09/2024
DOB NOWMechanical SystemsPermit IssuedSUPER COOL HVAC, LLC11/20/2023
DOB NOWStructuralSigned-offL & Z CONSULTING CORP08/18/2021
DOB NOWGeneral ConstructionSigned-offL & Z CONSULTING CORP08/18/2021
BISOTISSUEDBEST ENERGY POWER 2015 LL05/08/2023
BISOTISSUEDBEST ENERGY POWER 2015 LL01/09/2023
BISOTISSUEDALL TECHNICAL ART06/23/2000
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/03/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00519425-I1Request digital key ↗
08/28/2026B08008974-I1Request digital key ↗
08/26/2026B00984981-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
05/10/2023340865004Open ↗
05/01/2023340865004Open ↗
01/09/2023340865004Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/22/2022340865004Open ↗
11/27/2019301037134Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00519425-I1Open ↗
08/28/2026B08008974-I1Open ↗
08/26/2026B00984981-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/20/2019301037134Open ↗
09/20/2019301037134Open ↗
09/20/2019301037134Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/22/2022340865004Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/22/2022340865004Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
01/04/2023340865004Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00519425-I1Open ↗
08/28/2026B08008974-I1Open ↗
08/26/2026B00984981-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026B08008974-I1Open ↗
08/13/2026B00519425-I1Open ↗
08/13/2026B00984981-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/22/2022340865004Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/22/2022340865004Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00519425-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/07/2024340865004Open ↗
10/22/2022340865004Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/22/2022340865004Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/07/2024340865004Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/22/2022340865004Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/07/2024340865004Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/07/2024340865004Open ↗
10/22/2022340865004Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
09/20/2019301037134Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/12/2024340865004Open ↗
11/23/2019301037134Open ↗
10/12/2019301037134Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL ELECTRICAL SIGNOFF1
03/12/2024340865004Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/12/2024340865004Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/22/2022340865004Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/07/2024340865004Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
11/23/2019301037134Open ↗
10/12/2019301037134Open ↗
09/20/2019301037134Open ↗
▸BISADDITIONAL INFORMATION2
12/17/2022340865004Open ↗
11/23/2022340865004Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/22/2022340865004Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
03/12/2024340865004Open ↗
03/12/2024340865004Open ↗
03/12/2024340865004Open ↗