← Back
Elevator apt, miscellaneous
260 SOUTH 1 STREET
BROOKLYN · BIN 3063017
💬 Discuss this project
1915Year Built
6Stories
D9Building Class
R6Zoning
15,836 sfGross Floor Area
24Units
Rent Stabilized22 Open Violations 13 unresolved · 9 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: GROWER HOUSING DEVELOPMENT FUND CORPORAT ION, AS NOMINEE, · 4,000 sf lot · 3.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 11 docs
Basement2p · 2 filings · 6 docs
1 job · most recent 02/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/05/2025——Gas, Water/Sanitary
3 jobs · most recent 10/06/2025
FiledStatusContractorScope
10/06/2025Permit IssuedR.C.M. ELECTRIC CORP.—
09/15/2023CompleteRICHARD NEU—
08/10/2023Permit IssuedRICHARD NEU—
1 job · most recent 08/09/2023
Sidewalk Shed
FiledStatusContractorScope
08/09/2023Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
Building Lifecycle
All (110)Filed (6)Permit Issued (3)Signed Off (2)Facade (FISP) (14)Violation (60)Objection (20)Special Inspection (5)
08/04/2026
Violation issued (HPD, closed)
C
05/19/2026
Violation issued (HPD, closed)
C
05/19/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
A
01/28/2026
Violation issued (HPD, closed)
A
01/28/2026
Violation issued (HPD, closed)
A
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
A
02/10/2025
Objection raised — Admin
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Fire_Protection
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Inspections
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Fire_Protection
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Fire_Protection
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Scope
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Inspections
02/10/2025
Objection resolved — Addressed
02/05/2025
Filed — Alteration
B01098428-I1
02/05/2025
Filed — Alteration
Re-connection of replaced boilers and hwh.
B01102630-I1
08/23/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00932253-I1
08/06/2024
Signed off — Alteration
Facade, parapet, fire escape repair work as per plans
B01035340-I1
07/24/2024
Filed — Alteration
Facade, parapet, fire escape repair work as per plans
B01035340-P1
06/27/2024
Special inspection requirement — Masonry
ALAN DUDLEY
06/27/2024
Special inspection requirement — Post-installed Anchors
ALAN DUDLEY
06/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALAN DUDLEY
06/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
06/27/2024
Special inspection requirement — Final
ALAN DUDLEY
06/20/2024
Cycle 9 facade report submitted
06/19/2024
Cycle 9 facade report signed — SAFE
06/13/2024
Cycle 9 facade inspection completed
05/10/2024
Permit issued — General Construction
B01035340-I1-GC
04/30/2024
Objection resolved — Addressed
04/26/2024
Objection raised — Other
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection raised — Other
04/26/2024
Objection raised — Accessibility
04/26/2024
Objection resolved — Addressed
04/17/2024
Filed — Alteration
Facade, parapet, fire escape repair work as per plans
B01035340-I1
04/16/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
C
04/16/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
B
04/16/2024
Violation issued (HPD, closed)
B
04/16/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
03/22/2024
Violation issued (ECB, open)
Elevators
03/21/2024
Cycle 9 facade report submitted
03/21/2024
Cycle 9 facade report signed — UNSAFE
02/22/2024
Cycle 9 facade inspection completed
02/08/2024
Violation issued (ECB, closed)
Local Law
01/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2024
Violation issued (HPD, open)
B
01/03/2024
Violation issued (HPD, open)
B
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING307/08/2026
KRAUS MANAGEMENT2407/08/2026
NEW AMERICAN CONSTRUCTION INC503/22/2026
GROWER HOUSING DEVELOPMENT FUND CORPORAT ION, AS NOMINEE,403/22/2026
TOPLINE NYC CONTRACTING 1303/22/2026
DEVELOPMENT ASSOCIATES BU303/22/2026
DEVELOPMENT ASSOCIATES603/22/2026
SHAH GROUP ENTERPRISES403/22/2026
KRAUS MGT/DEVELOPMENT103/22/2026
BILLY CONTRACTORS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING202/05/2025
PVE ENGINEERING207/24/2024
MJE PROFESSIONAL SERVICES109/12/2023
ASR ENGINEERING PC108/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY MGT403/21/2026
YAGUDAYEV ARCHITECTURE STUDIO P C403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMERICAN CONSTRUCTION INCGeneral Contractor303/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
MORRIS HELLERElectrical103/21/2026
ATLAS BUILDERS LLCGeneral Contractor107/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704502/05/2025
INTEGRITY CONSULTING SERV666207/24/2024
PARTRIDGE VENTURE ENGINEE7690207/24/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offATLAS BUILDERS LLC05/10/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION09/12/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING08/09/2023
BISEQISSUEDTOPLINE NYC CONTRACTING01/05/2022
BISEQISSUEDTOPLINE NYC CONTRACTING05/28/2020
BISEQISSUEDSHAH GROUP ENTERPRISES IN08/08/2018
BISEQISSUEDSHAH GROUP ENTERPRISES IN08/04/2017
BISEQISSUEDBILLY CONTRACTORS INC12/10/2010
BISOTISSUEDDREAMLAND CONSTRUCTION IN07/14/2010
BISEQISSUEDBILLY CONTRACTORS INC12/22/2009
BISEQISSUEDBILLY CONT01/07/2008
BISEQISSUEDBILLY CONT01/24/2007
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/27/2024MasonryALAN DUDLEYspecial
06/27/2024Post-installed AnchorsALAN DUDLEYspecial
06/27/2024Structural Stability – Alterations of existing buildingsALAN DUDLEYspecial
06/27/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
06/27/2024FinalALAN DUDLEYprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00915795-I1Request digital key ↗
08/26/2026B00932253-I1Request digital key ↗
08/25/2026B01035340-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION6
01/06/2022340529967Open ↗
05/29/2020340529967Open ↗
08/09/2018340529967Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/02/2017340529967Open ↗
06/04/2010320163853Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01098428-I1Open ↗
08/23/2026B01102630-I1Open ↗
08/13/2026B00932253-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B01035340-P1Open ↗
08/30/2026B01035340-P1Open ↗
08/30/2026B01035340-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/02/2017340529967Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/02/2017340529967Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/02/2017340529967Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/04/2010320163853Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026B01035340-P1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/02/2017340529967Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01098428-I1Open ↗
08/14/2026B01102630-I1Open ↗
08/13/2026B01035340-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/04/2010320163853Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/02/2017340529967Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
06/04/2010320163853Open ↗
▸BISSHED LETTER1
08/09/2018340529967Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/04/2010320163853Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
08/02/2017340529967Open ↗
▸BISBOROUGH INTAKE FORM1
01/06/2022340529967Open ↗
▸BISEFILING COVER SHEET1
06/04/2010320163853Open ↗