← Back
Miscellaneous two family
283 SOUTH 2 STREET
BROOKLYN · BIN 3063023
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R6Zoning
2,340 sfGross Floor Area
2Units
Miscellaneous two family · 1,600 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 161p · 1 filing · 5 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 210p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Sub-Basement5p · 1 filing · 18 docs
1 job · most recent 03/30/2023
Gas Water/Sanitary
FiledStatusContractorScope
03/30/2023Permit IssuedSTELLMAR PLBG & MECH.CORPGas, Water/Sanitary
2 jobs · most recent 01/26/2024
General Wiring
FiledStatusContractorScope
01/26/2024CompleteISLAND ELECTRIC CORP—
03/21/2023Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Signed Off (1)Inspection (7)Objection (2)Special Inspection (6)
05/15/2024
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 9 Panels, 3.6 kW
B00996788-I1
02/22/2024
Permit issued — Solar
B00996788-I1-SL
02/09/2024
Objection resolved — Addressed
02/05/2024
Objection raised — Other
01/31/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 9 Panels, 3.6 kW
B00996788-I1
12/04/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2023
Permit issued — Plumbing
B08038697-I1-PL
03/30/2023
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJUNCTION WITH PREVIOUSLY FILED GENERAL CONSTRUCTION APPLICATION B08023814. REPLACEMENT & REMOVAL OF EXISTING FIXTURES AND INSTALLATION OF NEW FIXTURES AS PER PLAN.
B08038697-I1
11/18/2022
Permit issued — General Construction
B08023814-I1-GC
11/11/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2 FAMILY, 3 STORY BUILDING. INTERIOR PARTITION, GENERAL CONSTRUCTION AND FINISH WORK AS PER DRAWING. PLUMBING WORK FILED UNDER JOB B08038697 . NO CHANGE IN BULK, USE, OCCUPANCY OR EGRESS.
B08023814-I1
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
10/19/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nikola Martinovic
10/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Nikola Martinovic
10/19/2022
Special inspection requirement — Final
Nikola Martinovic
10/19/2022
Special inspection requirement — Lighting controls
Nikola Martinovic
10/19/2022
Special inspection requirement — Lighting in dwelling units
Nikola Martinovic
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2021$1.6M—283 SOUTH SECOND LLC → Private party$694/sf building
12/11/2020$1.3M—Private party → 283 SOUTH SECOND LLC$556/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/31/2024
INM ARCHITECTS PC203/30/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.G CONTRACTORS, INCGeneral Contractor107/08/2026
STELLMAR PLBG & MECH.CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281101/31/2024
INM ARCHITECT, P.C.3351111/11/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR02/22/2024
DOB NOWPlumbingPermit IssuedSTELLMAR PLBG & MECH.CORP04/03/2023
DOB NOWGeneral ConstructionPermit IssuedD.G CONTRACTORS, INC11/18/2022
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/19/2022Fire-Resistant Penetrations and JointsNikola Martinovicspecial
10/19/2022Structural Stability – Alterations of existing buildingsNikola Martinovicspecial
10/19/2022Energy Code Compliance InspectionsNikola Martinovicprogress
10/19/2022FinalNikola Martinovicprogress
10/19/2022Lighting controlsNikola Martinovicenergy_progress
10/19/2022Lighting in dwelling unitsNikola Martinovicenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B08023814-P1Request digital key ↗
08/28/2026B08023814-I1Request digital key ↗
08/27/2026B08038697-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B08023814-I1Open ↗
09/02/2026B08023814-I1Open ↗
09/02/2026B08023814-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B08023814-P1Open ↗
08/28/2026B08023814-I1Open ↗
08/27/2026B08038697-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B08023814-I1Open ↗
09/02/2026B08023814-I1Open ↗
08/23/2026B08023814-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B08023814-P1Open ↗
08/28/2026B08023814-I1Open ↗
08/27/2026B08038697-P1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00996788-I1Open ↗