Single or multiple dwelling with stores or offices
322 SOUTH 3 STREET
BROOKLYN · BIN 3063337
💬 Discuss this project
1920Year Built
3Stories
S9Building Class
R6Zoning
3,300 sfGross Floor Area
4Units
2 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: KEAP ST MANAGEMENT LLC · 1,500 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction7p · 1 filing · 11 docs
CellarUnder Construction7p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA301/28/2026
KRIS KOZLOWSKI ARCHITECT307/05/2023
PAUL PERDEK, PROF. ENG. PLLC205/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
SEVERINO ASSOCIATES403/21/2026
L & J DESIGN GROUP203/21/2026
ARTWIN CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDERS INCGeneral Contractor403/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor303/21/2026
DIOMEDES E ARBOLEDAGeneral Contractor303/21/2026
INNOVATIVE VENTURES TEAMGeneral Contractor303/21/2026
CENTRAL SCAFFOLD & HOISTGeneral Contractor207/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANARK CONSULTING ENGINEE6824109/16/2024
KRIS KOZLOWSKI ARCHITECT3955307/05/2023
STRUCT. ENGINEERING INTEG4174207/05/2023
Building Lifecycle
All (76)Filed (8)Permit Issued (8)Signed Off (3)Violation (23)Inspection (10)Objection (8)Special Inspection (16)
04/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/24/2026
Violation issued (FDNY_ORDER, closed)
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2026
Filed — Alteration
INSTALL NEW KITCHEN IN EXISTING COMMERCIAL RETAIL STORE (USE GROUP VI). INSTALL NEW HOOD AND DUCTS FOR KITCHEN EXHAUST AND VENTILATION.
B01028258-P1
01/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2025
Violation issued (FDNY_NOV, closed)
10/28/2025
Violation issued (FDNY_ORDER, closed)
10/28/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_NOV, closed)
10/23/2025
Permit issued — Plumbing
B01028258-S1-PL
08/28/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/28/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
10/17/2024
Permit issued — General Construction
B01028258-I1-GC
09/18/2024
Filed — Alteration
INSTALL NEW KITCHEN IN EXISTING COMMERCIAL RETAIL STORE (USE GROUP VI). INSTALL NEW HOOD AND DUCTS FOR KITCHEN EXHAUST AND VENTILATION.
B01028258-S1
09/16/2024
Filed — Alteration
INSTALL NEW KITCHEN IN EXISTING COMMERCIAL RETAIL STORE (USE GROUP VI). INSTALL NEW HOOD AND DUCTS FOR KITCHEN EXHAUST AND VENTILATION.
B01028258-I1
09/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
03/30/2024
Special inspection requirement — Mechanical Systems
REJEP KOLAR
03/30/2024
Special inspection requirement — Final
Vicente Varela
01/29/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00534581-I1
11/24/2023
Signed off — Alteration
Emergency repairs of the street wall, partial replacement of the masonry wall facing the street and installation of shoring at the cellar, first to third floor. No change to use occupancy and egress.
B08004578-I1
11/19/2023
Signed off — Alteration
Emergency repairs of the street wall, partial replacement of the masonry wall facing the street and installation of shoring at the cellar, first to third floor. No change to use occupancy and egress.
B08004578-S1
08/04/2023
Special inspection requirement — Fenestration areas
Kris Kozlowski
08/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Kris Kozlowski
08/04/2023
Special inspection requirement — Fenestration air leakage
Kris Kozlowski
08/04/2023
Special inspection requirement — Insulation placement and R values
Kris Kozlowski
08/04/2023
Special inspection requirement — Masonry
Kris Kozlowski
08/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kris Kozlowski
08/04/2023
Special inspection requirement — Final
Kris Kozlowski
07/05/2023
Filed — Alteration
Emergency repairs of the street wall, partial replacement of the masonry wall facing the street and installation of shoring at the cellar, first to third floor. No change to use occupancy and egress.
B08004578-P2
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kris Kozlowski
06/22/2023
Special inspection requirement — Masonry
Kris Kozlowski
06/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
06/22/2023
Special inspection requirement — Final
Kris Kozlowski
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2023
Permit issued — Construction Fence
B08004578-S1-FN
05/19/2023
Permit issued — General Construction
B08004578-I1-GC
05/05/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00534581-P1
05/05/2023
Permit issued — Sidewalk Shed
B00534581-I1-SH
05/05/2023
Objection raised — Structural
05/05/2023
Objection resolved — Addressed
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2023
Objection raised — Structural
04/24/2023
Objection resolved — Addressed
04/24/2023
Objection raised — Inspections
04/24/2023
Objection resolved — Addressed
04/11/2023
Filed — Alteration
Emergency repairs of the street wall, partial replacement of the masonry wall facing the street and installation of shoring at the cellar, first to third floor. No change to use occupancy and egress.
B08004578-S1
02/28/2023
Permit issued — General Construction
B08004578-I1-GC
10/07/2022
Objection raised — Energy
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC10/23/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM10/17/2024
DOB NOWConstruction FenceSigned-offCITY BUILDERS INC05/20/2023
DOB NOWGeneral ConstructionSigned-offCITY BUILDERS INC05/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/05/2023
DOB NOWGeneral ConstructionSigned-offDIOMEDES E ARBOLEDA02/28/2023
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST06/03/2022
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST06/14/2021
1 project · most recent 01/28/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026Permit IssuedINNOVATIVE VENTURES TEAMVentilation Systems
Ventilation
1 project · most recent 01/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/28/2026Permit IssuedPLUMB-IT MECHANICAL INCGas, Water/Sanitary
3 projects · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
06/07/2021CompleteV. VASS ELECTRIC CORP—
06/07/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/28/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/16/2024Fire-Resistance Rated ConstructionVicente Varelaprogress
09/16/2024Energy Code Compliance InspectionsVicente Varelaprogress
03/30/2024Mechanical SystemsREJEP KOLARspecial
03/30/2024FinalVicente Varelaprogress
08/04/2023Fenestration areasKris Kozlowskienergy_progress
08/04/2023Fenestration and door U-factor and product ratingsKris Kozlowskienergy_progress
08/04/2023Fenestration air leakageKris Kozlowskienergy_progress
08/04/2023Insulation placement and R valuesKris Kozlowskienergy_progress
08/04/2023MasonryKris Kozlowskispecial
08/04/2023Structural Stability – Alterations of existing buildingsChris Yiuspecial
08/04/2023Fire-Resistant Penetrations and JointsKris Kozlowskispecial
08/04/2023FinalKris Kozlowskiprogress
06/22/2023Fire-Resistant Penetrations and JointsKris Kozlowskispecial
06/22/2023MasonryKris Kozlowskispecial
06/22/2023Structural Stability – Alterations of existing buildingsChris Yiuspecial
06/22/2023FinalKris Kozlowskiprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00534581-I1Request digital key ↗
09/01/2026B00534581-P1Request digital key ↗
08/28/2026B08004578-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00534581-P1Open ↗
09/01/2026B00534581-I1Open ↗
08/28/2026B08004578-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B08004578-I1Open ↗
08/27/2026B08004578-I1Open ↗
08/27/2026B08004578-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026B08004578-I1Open ↗
08/27/2026B08004578-I1Open ↗
08/27/2026B08004578-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B08004578-P2Open ↗
08/15/2026B08004578-I1Open ↗
08/13/2026B01028258-S1Open ↗
Showing 3 of 5 on file for this type