Factory, light manufacturing
266 BANKER STREET
BROOKLYN · BIN 3065251
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-1Zoning
924 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: 30-38 FRANKLIN OWNER LLC · 2,613 sf lot · 0.35 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 18p · 1 filing · 20 docs
1 job · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/11/2026Permit IssuedA&S.INTERIOR CONSTRUCTIONHeating and Air Conditioning Systems
1 job · most recent 08/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/11/2026Signed-offI & I PLUMBING CORPGas, Water/Sanitary
1 job · most recent 12/24/2025
General Wiring
FiledStatusContractorScope
12/24/2025CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
1 job · most recent 08/11/2026
Concrete Masonry Wood
FiledStatusContractorScope
08/11/2026Signed-offI & I PLUMBING CORPConcrete, Masonry, Wood
Building Lifecycle
All (77)Filed (8)Permit Issued (7)Signed Off (3)Violation (10)Inspection (11)Objection (8)Special Inspection (30)
08/11/2026
Filed — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-P5
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2026
Signed off — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-S3
06/16/2026
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Lowest Floor Elevation
EUGENE BIFULCO
06/16/2026
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
06/04/2026
Signed off — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-S2
05/29/2026
Signed off — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-S1
05/15/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2026
Inspection — Under Review CND-Occupancy Inspection
Under Review
View inspection ↗
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Final
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Objection raised — Cost
04/08/2026
Objection resolved — Addressed
04/06/2026
Filed — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-P3
04/06/2026
Filed — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-P4
03/31/2026
Permit issued — Plumbing
B01122409-S1-PL
03/31/2026
Permit issued — General Construction
B01122409-I1-GC
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
03/31/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2025
Filed — Alteration CO
INSTALLATION OF A NEW GAS-FIRED ROOFTOP HVAC UNIT AS PER THE DRAWINGS FILED HEREIN. DISTRIBUTION DUCTWORK TO BE COMPLETED BY THE FUTURE TENANT. FILED IN CONJUNCTION WITH GC #B01122409-I1
B01122409-P1
09/11/2025
Special inspection requirement — Subgrade Inspections
EUGENE BIFULCO
09/11/2025
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, closed)
Construction
08/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2025
Violation issued (ECB, closed)
Unknown
08/22/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Violation issued (ECB, open)
Unknown
08/20/2025
Violation issued (ECB, closed)
Construction
07/15/2025
Permit issued — Mechanical Systems
B01122409-S2-MS
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAX REAL ESTATE1709/15/2026
30-38 FRANKLIN OWNER LLC103/22/2026
A&S INTERIOR CONSTRUCTION603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS608/11/2026
HANSEN ENGINEERING, PC209/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&S.INTERIOR CONSTRUCTIONGeneral Contractor907/08/2026
GLENNS PLUMBING SVCS INCPlumbing207/08/2026
EXPERT ELECTRIC.CONT NY IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544608/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedA&S.INTERIOR CONSTRUCTION03/31/2026
DOB NOWMechanical SystemsSigned-offA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWStructuralSigned-offA&S.INTERIOR CONSTRUCTION07/15/2025
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC03/04/2025
DOB NOWMechanical SystemsSigned-offA&S.INTERIOR CONSTRUCTION02/25/2025
DOB NOWStructuralSigned-offA&S.INTERIOR CONSTRUCTION02/25/2025
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2026Under Review CND-Occupancy InspectionUnder ReviewView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/16/2026Fenestration air leakageEUGENE BIFULCOenergy_progress
06/16/2026Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
06/16/2026Fenestration areasEUGENE BIFULCOenergy_progress
06/16/2026Interior lighting powerEUGENE BIFULCOenergy_progress
06/16/2026Lighting controlsEUGENE BIFULCOenergy_progress
06/16/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
06/16/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
06/16/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
06/16/2026Lowest Floor ElevationEUGENE BIFULCOprogress
06/16/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
04/09/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/09/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/09/2026Maintenance informationEUGENE BIFULCOenergy_progress
04/09/2026Mechanical SystemsEUGENE BIFULCOspecial
04/09/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/09/2026FinalEUGENE BIFULCOprogress
04/09/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/09/2026Maintenance informationEUGENE BIFULCOenergy_progress
03/31/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/31/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
Latest 25 of 50.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026B01122409-S3Request digital key ↗
08/23/2026B01122409-P5Request digital key ↗
08/23/2026B01122409-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B01122409-P3Open ↗
09/01/2026B01122409-P3Open ↗
09/01/2026B01122409-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/23/2026B01122409-S2Open ↗
08/23/2026B01122409-P5Open ↗
08/23/2026B01122409-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01122409-P5Open ↗
08/29/2026B01122409-P1Open ↗
08/29/2026B01122409-P1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026B01122409-P4Open ↗
08/23/2026B01122409-P3Open ↗
08/23/2026B01122409-P5Open ↗
Showing 3 of 8 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸DOB NOWPlot Diagram2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/23/2026B01122409-P5Open ↗
08/13/2026B01122409-I1Open ↗
▸DOB NOWFinal Survey1
08/23/2026B01122409-I1Open ↗