← Back
One story retail building
95 GUERNSEY STREET
BROOKLYN · BIN 3065948
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
M1-1Zoning
2,500 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One story retail building · Owner of record: SHALMER TWO LLC · 2,500 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 153p · 2 filings · 20 docs
Cellar38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHALMER TWO LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT STRONG ARCHITECT804/12/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRUEBLUE CONSTRUCTION LLCGeneral Contractor603/21/2026
CUSTOMBUILT HOMES INCGeneral Contractor403/21/2026
PLUMBING & HTG DOCTOR INCFire Protection107/08/2026
KJK ELECTRIC INCElectrical103/22/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT STRONG ARCHITECT4884704/12/2024
Building Lifecycle
All (23)Filed (8)Permit Issued (8)Violation (7)
09/17/2025
Violation issued (FDNY_NOV, closed)
12/02/2024
Violation issued (ECB, closed)
Construction
06/12/2024
Violation issued (FDNY_NOV, closed)
06/12/2024
Violation issued (FDNY_NOV, closed)
06/12/2024
Violation issued (FDNY_ORDER, closed)
04/12/2024
Filed — Alteration
B00681841-P3
04/12/2024
Filed — Alteration CO
INSTALL PARTITIONS IN FIRST FLOOR EATING AND DRINKING SPACE. INSTALL STOREFRONT AND MECHANICAL EQUIPMENT.
B00681845-P2
02/06/2024
Violation issued (FDNY_NOV, closed)
11/02/2023
Permit issued — Sprinklers
B00681841-I1-EW-SP
10/03/2023
Permit issued — Plumbing
B00681841-I1-PL
09/12/2023
Filed — Alteration
B00681841-P2
08/22/2023
Permit issued — Mechanical Systems
B00681845-I1-GC
11/22/2022
Filed — Alteration CO
INSTALL PARTITIONS IN FIRST FLOOR EATING AND DRINKING SPACE. INSTALL STOREFRONT AND MECHANICAL EQUIPMENT.
B00681845-P1
07/06/2022
Permit issued — Mechanical Systems
B00681845-I1-GC
06/30/2022
Filed — No Work
B00766626-I1
06/30/2022
Permit issued — General Construction
B00681845-I1-GC
06/30/2022
Permit issued — Mechanical Systems
B00681845-I1-MS
04/20/2022
Filed — Alteration
B00681841-P1
04/08/2022
Permit issued — Sprinklers
B00681841-I1-EW-SP
04/08/2022
Permit issued — Plumbing
B00681841-I1-PL
03/09/2022
Filed — Alteration
B00681841-I1
03/02/2022
Filed — Alteration CO
INSTALL PARTITIONS IN FIRST FLOOR EATING AND DRINKING SPACE. INSTALL STOREFRONT AND MECHANICAL EQUIPMENT.
B00681845-I1
10/24/1988
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN11/02/2023
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.10/03/2023
DOB NOWMechanical SystemsPermit IssuedTRUEBLUE CONSTRUCTION LLC08/22/2023
DOB NOWMechanical SystemsPermit IssuedTRUEBLUE CONSTRUCTION LLC07/06/2022
DOB NOWGeneral ConstructionPermit IssuedCUSTOMBUILT HOMES INC06/30/2022
DOB NOWMechanical SystemsPermit IssuedCUSTOMBUILT HOMES INC06/30/2022
DOB NOWSprinklersPermit IssuedPLUMBING & HTG DOCTOR INC04/08/2022
DOB NOWPlumbingPermit IssuedMATHEW WEISS04/08/2022
1 project · most recent 04/12/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/12/2024Permit IssuedTRUEBLUE CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
York YORK ZF240N40R2CIAAA1A 6,200 CFM · Packaged Unit ×3
3 projects · most recent 04/19/2022
General Wiring
FiledStatusContractorScope
04/19/2022Permit IssuedKJK ELECTRIC INCGeneral Wiring
12/30/2021Permit IssuedRONEY ELECTRIC INC4 meters, 1 new_meters
11/12/2019Permit IssuedPOWER SURGE ELECTRIC, INC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
11/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/29/2024Sprinkler SystemsROBERT STRONG JRspecial
04/26/2024Fenestration areasROBERT STRONG JRenergy_progress
04/26/2024Fenestration air leakageROBERT STRONG JRenergy_progress
04/26/2024MeteringROBERT STRONG JRenergy_progress
04/26/2024Fire-Resistant Penetrations and JointsROBERT STRONG JRspecial
04/26/2024Mechanical SystemsROBERT STRONG JRspecial
04/26/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)ROBERT STRONG JRspecial
04/26/2024FinalROBERT STRONG JRprogress
04/26/2024Insulation placement and R valuesROBERT STRONG JRenergy_progress
04/26/2024Lighting controlsROBERT STRONG JRenergy_progress
04/26/2024Interior lighting powerROBERT STRONG JRenergy_progress
04/26/2024Maintenance informationROBERT STRONG JRenergy_progress
04/26/2024Fenestration and door U-factor and product ratingsROBERT STRONG JRenergy_progress
04/11/2024Interior lighting powerROBERT STRONG JRenergy_progress
04/11/2024Sprinkler SystemsROBERT STRONG JRspecial
04/11/2024Fire-Resistant Penetrations and JointsROBERT STRONG JRspecial
04/11/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)ROBERT STRONG JRspecial
04/11/2024Mechanical SystemsROBERT STRONG JRspecial
04/11/2024FinalROBERT STRONG JRprogress
04/11/2024Insulation placement and R valuesROBERT STRONG JRenergy_progress
04/11/2024MeteringROBERT STRONG JRenergy_progress
04/11/2024Fenestration air leakageROBERT STRONG JRenergy_progress
04/11/2024Fenestration and door U-factor and product ratingsROBERT STRONG JRenergy_progress
04/11/2024Fenestration areasROBERT STRONG JRenergy_progress
04/11/2024Maintenance informationROBERT STRONG JRenergy_progress
Latest 25 of 41.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/25/2026B00681845-P1Request digital key ↗
08/25/2026B00681841-P3Request digital key ↗
08/25/2026B00681841-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/29/2026B00766626-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00681845-P2Open ↗
08/13/2026B00681845-P1Open ↗
08/13/2026B00681845-I1Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature28
09/02/2026B00681845-P1Open ↗
09/02/2026B00681845-P1Open ↗
09/02/2026B00681845-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B00681841-P3Open ↗
09/02/2026B00681841-I1Open ↗
09/02/2026B00681845-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026B00681841-P3Open ↗
08/25/2026B00681841-P2Open ↗
08/25/2026B00681841-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00681845-I1Open ↗
08/13/2026B00681845-P2Open ↗
08/13/2026B00681845-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026B00681841-P3Open ↗
08/25/2026B00681841-P2Open ↗
08/25/2026B00681841-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00681845-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/13/2026B00681845-P1Open ↗
08/13/2026B00681845-I1Open ↗
08/13/2026B00681845-P2Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/25/2026B00681845-P1Open ↗
08/15/2026B00681845-P2Open ↗
08/14/2026B00681845-I1Open ↗