← Back
Three families
291 KINGSLAND AVENUE
BROOKLYN · BIN 3066604
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
2,376 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Three families · 1,892 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
Architecture
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/02/2024$1.8M—— → —$754/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC907/30/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLIAMS DESIGNS & CONSTRGeneral Contractor707/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUNG HO SHIN ARCHITECT2997907/30/2025
Building Lifecycle
All (91)Filed (9)Permit Issued (4)Signed Off (3)Violation (27)Inspection (8)Objection (10)Special Inspection (30)
11/20/2025
Violation issued (HPD, closed)
I
08/19/2025
Signed off — Alteration
Plumbing work for interior renovation of existing 3 family building with cellar. Remove/install plumbing fixtures, gas stoves, direct replacement of hot water heater, new gas dryer, washer, dish washer, relocation of existing bathrooms. Remove boiler.
B01088460-I1
08/19/2025
Signed off — Alteration
Interior renovation of existing 3-family apartment
B01082791-I1
08/19/2025
Signed off — Alteration
Installation of split system heat pump ac system for apartment. 3 outdoor units (condensors) and 9 indoor units (blowers)
B01159065-I1
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/30/2025
Filed — Alteration
Interior renovation of existing 3-family apartment
B01082791-P3
07/30/2025
Special inspection requirement — Interior lighting power
SUNG HO SHIN
07/30/2025
Special inspection requirement — Fenestration areas
SUNG HO SHIN
07/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SUNG HO SHIN
07/30/2025
Special inspection requirement — Air barrier - visual inspection
SUNG HO SHIN
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
07/30/2025
Special inspection requirement — Masonry
SUNG HO SHIN
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
SUNG HO SHIN
07/30/2025
Special inspection requirement — Fenestration air leakage
SUNG HO SHIN
07/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/27/2025
Filed — Alteration
Interior renovation of existing 3-family apartment
B01082791-P2
06/24/2025
Special inspection requirement — Mechanical Systems
SUNG HO SHIN
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
06/24/2025
Special inspection requirement — Final
SUNG HO SHIN
06/24/2025
Special inspection requirement — Maintenance information
SUNG HO SHIN
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
06/24/2025
Special inspection requirement — Masonry
SUNG HO SHIN
06/24/2025
Special inspection requirement — Energy Code Compliance Inspections
SUNG HO SHIN
06/24/2025
Special inspection requirement — Air barrier - visual inspection
SUNG HO SHIN
06/24/2025
Special inspection requirement — Fenestration air leakage
SUNG HO SHIN
06/24/2025
Special inspection requirement — Interior lighting power
SUNG HO SHIN
06/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SUNG HO SHIN
06/24/2025
Special inspection requirement — Fenestration areas
SUNG HO SHIN
06/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/17/2025
Filed — Alteration
Plumbing work for interior renovation of existing 3 family building with cellar. Remove/install plumbing fixtures, gas stoves, direct replacement of hot water heater, new gas dryer, washer, dish washer, relocation of existing bathrooms. Remove boiler.
B01088460-P2
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
06/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNG HO SHIN
06/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
SUNG HO SHIN
06/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
SUNG HO SHIN
06/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2025
Objection resolved — Addressed
06/10/2025
Violation issued (HPD, closed)
A
06/06/2025
Objection raised — Scope
05/29/2025
Filed — Alteration
Installation of split system heat pump ac system for apartment. 3 outdoor units (condensors) and 9 indoor units (blowers)
B01159065-P1
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
05/23/2025
Special inspection requirement — Mechanical Systems
SUNG HO SHIN
05/23/2025
Special inspection requirement — Final
SUNG HO SHIN
05/23/2025
Special inspection requirement — Maintenance information
SUNG HO SHIN
05/21/2025
Permit issued — General Construction
B01082791-I1-GC
03/13/2025
Permit issued — Mechanical Systems
B01159065-I1-MS
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Objection resolved — Addressed
01/31/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Zoning
01/30/2025
Objection raised — Mechanical
01/30/2025
Objection raised — Zoning
01/30/2025
Objection raised — Mechanical
01/28/2025
Filed — Alteration
Interior renovation of existing 3-family apartment
B01082791-P1
01/28/2025
Filed — Alteration
Plumbing work for interior renovation of existing 3 family building with cellar. Remove/install plumbing fixtures, gas stoves, direct replacement of hot water heater, new gas dryer, washer, dish washer, relocation of existing bathrooms. Remove boiler.
B01088460-P1
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWILLIAMS DESIGNS & CONSTR05/21/2025
DOB NOWMechanical SystemsSigned-offWILLIAMS DESIGNS & CONSTR03/13/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/01/2024
DOB NOWGeneral ConstructionSigned-offWILLIAMS DESIGNS & CONSTR08/01/2024
1 project · most recent 01/05/2025
General Wiring
FiledStatusContractorScope
01/05/2025CompleteA.S.H ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/30/2025Interior lighting powerSUNG HO SHINenergy_progress
07/30/2025Fenestration areasSUNG HO SHINenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsSUNG HO SHINenergy_progress
07/30/2025Air barrier - visual inspectionSUNG HO SHINenergy_progress
07/30/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
07/30/2025MasonrySUNG HO SHINspecial
07/30/2025Energy Code Compliance InspectionsSUNG HO SHINprogress
07/30/2025Fenestration air leakageSUNG HO SHINenergy_progress
06/24/2025Mechanical SystemsSUNG HO SHINspecial
06/24/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
06/24/2025FinalSUNG HO SHINprogress
06/24/2025Maintenance informationSUNG HO SHINenergy_progress
06/24/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
06/24/2025MasonrySUNG HO SHINspecial
06/24/2025Energy Code Compliance InspectionsSUNG HO SHINprogress
06/24/2025Air barrier - visual inspectionSUNG HO SHINenergy_progress
06/24/2025Fenestration air leakageSUNG HO SHINenergy_progress
06/24/2025Interior lighting powerSUNG HO SHINenergy_progress
06/24/2025Fenestration and door U-factor and product ratingsSUNG HO SHINenergy_progress
06/24/2025Fenestration areasSUNG HO SHINenergy_progress
06/17/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
06/17/2025HVAC-R and service water piping design and insulationSUNG HO SHINenergy_progress
06/17/2025HVAC-R and service water heating system controlsSUNG HO SHINenergy_progress
06/17/2025HVAC-R and service water heating equipmentSUNG HO SHINenergy_progress
05/23/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
Latest 25 of 40.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026B01088460-P1Request digital key ↗
08/24/2026B01088460-I1Request digital key ↗
08/24/2026B01088460-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature28
08/29/2026B01088460-P1Open ↗
08/29/2026B01088460-P1Open ↗
08/29/2026B01088460-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/29/2026B01088460-P1Open ↗
08/28/2026B01082791-P2Open ↗
08/28/2026B01082791-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026B01088460-I1Open ↗
08/24/2026B01088460-P1Open ↗
08/23/2026B01159065-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026B01088460-P1Open ↗
08/24/2026B01088460-I1Open ↗
08/23/2026B01159065-I1Open ↗
Showing 3 of 9 on file for this type