← Back
Factory, industrial, semi-fireproof
284 KINGSLAND AVENUE
BROOKLYN · BIN 3066659
💬 Discuss this project
1931Year Built
1Stories
F4Building Class
M1-2Zoning
8,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: 284 KINGSLAND LLC · 8,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 3 filings · 15 docs
Floor 110p · 7 filings · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
284 KINGSLAND407/08/2026
BELGO PPR LLC2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
P WOLFE CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANAL CONSTRUCTION CORPGeneral Contractor603/21/2026
AIR TECH COOLING INCGeneral Contractor203/21/2026
S & J INDUSTRIAL CORPPlumbing207/08/2026
AECOM USA INCGeneral Contractor107/08/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010511/12/2025
M. INT'L ENGINEERING PLLC3129107/13/2023
VINCENT J. LIOTTA P. E.1974112/14/2021
Building Lifecycle
All (79)Filed (10)Permit Issued (8)Signed Off (7)Violation (5)Inspection (17)Objection (2)Special Inspection (30)
04/13/2026
Signed off — Alteration CO
PROPOSE INTERIOR RENOVATION WORKS AS PER PLAN. THE MECHANICAL AND PLUMBING WORK TYPE ARE FILED UNDER SEPARATE APPLICATIONS. AMENDING C OF O.
B00801483-I1
03/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/12/2025
Filed — Alteration CO
PROPOSE INTERIOR RENOVATION WORKS AS PER PLAN. THE MECHANICAL AND PLUMBING WORK TYPE ARE FILED UNDER SEPARATE APPLICATIONS. AMENDING C OF O.
B00801483-P2
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
10/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
09/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/18/2025
Signed off — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00758606-I1
06/04/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB NOW #B00734909.
B00758616-I1
05/20/2024
Violation issued (FDNY_NOV, closed)
02/21/2024
Signed off — Alteration
ALTERATION OF 1-STORY BUILDING. ADDING FOOTING FOR FREEZE PLACE AT 1ST FLOOR AND DUNNAGE BEAMS AT ROOF.
B08008411-I1
02/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/09/2023
Signed off — Alteration
PROPOSE TO FILE FOR SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN TO MITIGATE VAPOR INTRUSION, THESE ARE NOT PERMANENT INSTALLATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00891520-I1
10/17/2023
Filed — Alteration CO
PROPOSE INTERIOR RENOVATION WORKS AS PER PLAN. THE MECHANICAL AND PLUMBING WORK TYPE ARE FILED UNDER SEPARATE APPLICATIONS. AMENDING C OF O.
B00801483-P1
09/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
09/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
09/08/2023
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
08/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/21/2023
Permit issued — General Construction
B00891520-I1-GC
07/13/2023
Filed — Alteration
PROPOSE TO FILE FOR SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN TO MITIGATE VAPOR INTRUSION, THESE ARE NOT PERMANENT INSTALLATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00891520-I1
06/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
06/15/2023
Special inspection requirement — Final
Robert Forstner
06/06/2023
Violation issued (ECB, closed)
Construction
06/03/2023
Violation issued (FDNY_ORDER, closed)
06/03/2023
Violation issued (FDNY_NOV, closed)
06/03/2023
Violation issued (FDNY_NOV, closed)
02/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2023
Permit issued — General Construction
B00801483-I1-GC
02/10/2023
Permit issued — Mechanical Systems
B00758606-I1-MS
02/10/2023
Permit issued — Structural
B08008411-I1-ST
02/02/2023
Objection resolved — Addressed
01/10/2023
Objection raised — Fire_Protection
01/04/2023
Filed — Alteration CO
PROPOSE INTERIOR RENOVATION WORKS AS PER PLAN. THE MECHANICAL AND PLUMBING WORK TYPE ARE FILED UNDER SEPARATE APPLICATIONS. AMENDING C OF O.
B00801483-I1
11/22/2022
Permit issued — Plumbing
B00758616-I1-PL
11/10/2022
Filed — Alteration
B00734909-I1
11/09/2022
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00758606-I1
11/07/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB NOW #B00734909.
B00758616-I1
11/07/2022
Filed — Alteration
ALTERATION OF 1-STORY BUILDING. ADDING FOOTING FOR FREEZE PLACE AT 1ST FLOOR AND DUNNAGE BEAMS AT ROOF.
B08008411-I1
11/07/2022
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIUCHENG LI
11/04/2022
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
11/04/2022
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
11/04/2022
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
11/04/2022
Special inspection requirement — Preliminary
XIUCHENG LI
11/04/2022
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
10/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
10/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
10/26/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
10/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAECOM USA INC07/21/2023
DOB NOWGeneral ConstructionPermit IssuedCANAL CONSTRUCTION02/10/2023
DOB NOWMechanical SystemsSigned-offCANAL CONSTRUCTION02/10/2023
DOB NOWStructuralSigned-offCANAL CONSTRUCTION02/10/2023
DOB NOWPlumbingSigned-offKATAN P & H INC11/22/2022
DOB NOWPlumbingSigned-offS & J INDUSTRIAL CORP03/04/2022
DOB NOWMechanical SystemsSigned-offAIR TECH COOLING12/17/2021
DOB NOWPlumbingSigned-offS & J INDUSTRIAL CORP12/16/2021
BISPLISSUEDALJER PLBG & HTG CORP07/20/1992
BISMHISSUEDDAVID KRZELJ DBA CETINA CONTR.05/15/1992
4 projects · most recent 01/30/2025
General Wiring
FiledStatusContractorScope
01/30/2025CompleteCL ELECTRICAL CORPGeneral Wiring
12/08/2022CompleteWCK ELECTRIC CORP.General Wiring
10/04/2021CompleteA.C.M. ELEC'L CONTR'G CORGeneral Wiring
08/07/2019CompleteT.M.T ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
03/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2023Fail-Final CND-Occupancy InspectionFailView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/18/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
11/18/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/18/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
10/07/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
10/07/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
10/07/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
09/08/2023Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
09/08/2023Fire-Resistance Rated ConstructionXIUCHENG LIprogress
09/08/2023Energy Code Compliance InspectionsXIUCHENG LIprogress
06/15/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/15/2023FinalRobert Forstnerprogress
11/07/2022Construction Operations Influencing Adjacent StructuresXIUCHENG LIspecial
11/04/2022Concrete - Cast-In-PlaceXIUCHENG LIspecial
11/04/2022Structural Steel - DetailsXIUCHENG LIspecial
11/04/2022Structural Steel - WeldingXIUCHENG LIspecial
11/04/2022PreliminaryXIUCHENG LIprogress
11/04/2022Structural Steel - High Strength BoltingXIUCHENG LIspecial
10/26/2022HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
10/26/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
10/26/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
10/26/2022HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
10/26/2022Maintenance informationXIUCHENG LIenergy_progress
10/26/2022HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
10/26/2022Shutoff dampersXIUCHENG LIenergy_progress
09/22/2022FinalXIUCHENG LIprogress
Latest 25 of 31.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00640969-I1Request digital key ↗
08/31/2026B00640995-I1Request digital key ↗
08/28/2026B00758616-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
04/24/2025300162730Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00801483-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00758606-I1Open ↗
08/27/2026B00891520-I1Open ↗
08/26/2026B00801483-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/07/2026B00640995-I1Open ↗
09/01/2026B00891520-I1Open ↗
08/31/2026B00758606-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00891520-I1Open ↗
08/31/2026B00758606-I1Open ↗
08/28/2026B00801483-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/26/2026B00801483-P2Open ↗
08/26/2026B00801483-P1Open ↗
08/15/2026B00801483-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B00758606-I1Open ↗
08/27/2026B00891520-I1Open ↗
08/26/2026B00801483-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00640969-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00640969-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/26/2026B00801483-P2Open ↗
08/26/2026B00801483-P1Open ↗
08/15/2026B00801483-I1Open ↗