← Back
Three families
517 LEONARD STREET
BROOKLYN · BIN 3066746
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,964 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,950 sf lot · 1.52 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Roof2p · 2 filings · 9 docs
Floor 33p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC102/04/2026
MKO ARCHITECTURE607/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES603/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
HOME SOLUTIONS INCGeneral Contractor203/21/2026
STEVEN BURKEElectrical103/21/2026
ARC ELECTRICAL & MECH CONElectrical103/21/2026
COBALT MECHANICALGeneral Contractor103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
DILIP SEECHARRANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244102/04/2026
LINEA LLP3155607/22/2022
Building Lifecycle
All (27)Filed (7)Permit Issued (3)Signed Off (3)Violation (7)Inspection (3)Special Inspection (4)
06/11/2026
Signed off — Alteration
B01352086-I1
05/05/2026
Violation issued (HPD, closed)
A
02/10/2026
Permit issued — Solar
B01352086-I1-SL
02/04/2026
Filed — Alteration
B01352086-I1
06/10/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
03/23/2023
Violation issued (HPD, closed)
A
09/20/2022
Signed off — Alteration
B00462142-I1
09/20/2022
Signed off — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-I1
08/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
07/22/2022
Filed — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-P5
07/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
06/09/2022
Filed — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-P4
06/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
05/16/2022
Filed — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-P2
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lisa Vangelas
04/26/2022
Filed — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-P1
02/25/2022
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
10/05/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2021
Permit issued — Plumbing
B00451491-I1-PL
08/03/2021
Permit issued — Mechanical Systems
B00462142-I1-GC-CX
04/09/2021
Violation issued (HPD, closed)
A
03/31/2021
Filed — Alteration
B00462142-I1
03/31/2021
Filed — Alteration
File for new fixtures at existing locations or relocated, as per plans filed herewith. No change to use, egress, or occupancy.
B00451491-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC02/10/2026
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.08/16/2021
DOB NOWMechanical SystemsSigned-offHOME SOLUTIONS08/03/2021
2 projects · most recent 01/28/2026
General Wiring
FiledStatusContractorScope
01/28/2026CompleteBROOKYLN SOLARWORKS, LLC—
05/26/2018CompleteJOE ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/27/2022Fire-Resistant Penetrations and JointsLisa Vangelasspecial
07/19/2022Fire-Resistant Penetrations and JointsLisa Vangelasspecial
06/07/2022Fire-Resistant Penetrations and JointsLisa Vangelasspecial
05/12/2022Fire-Resistant Penetrations and JointsLisa Vangelasspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/29/2026B00451491-P2Request digital key ↗
08/29/2026B00451491-I1Request digital key ↗
08/29/2026B00451491-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00462142-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/18/2026B01352086-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00462142-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00462142-I1Open ↗
08/29/2026B00451491-P2Open ↗
08/29/2026B00451491-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00451491-P2Open ↗
08/27/2026B00451491-P4Open ↗
08/26/2026B00451491-P5Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00462142-I1Open ↗
08/29/2026B00451491-P1Open ↗
08/29/2026B00451491-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00462142-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026B01352086-I1Open ↗