← Back
Over six families without stores
62 NEWEL STREET
BROOKLYN · BIN 3066967
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R6BZoning
5,000 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: CROWN NEWEL LLC · 2,500 sf lot · 2 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIOLET HOLDINGS2707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2022$2.2M—— → —$440/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS507/12/2024
BADALY ENGINEERING PLLC512/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor407/08/2026
MORELL BUILDERS INCGeneral Contractor303/21/2026
RKA PIPING AND HEATINGPlumbing207/08/2026
2260 MAG CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137905/13/2024
Building Lifecycle
All (68)Filed (10)Permit Issued (6)Signed Off (4)Violation (15)Inspection (4)Special Inspection (29)
06/10/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2024
Signed off — Alteration
B01079921-I1
07/25/2024
Permit issued — General Construction
B01079921-I1-GC
07/12/2024
Filed — Alteration
B01079921-I1
06/24/2024
Signed off — Alteration
PROVIDE NEW FURNACE HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08025308-I1
05/20/2024
Signed off — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-I1
05/17/2024
Permit issued — Mechanical Systems
B08025308-I1-MS
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
05/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
05/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
05/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
05/16/2024
Special inspection requirement — Maintenance information
SHAHIN BADALY
05/16/2024
Special inspection requirement — Shutoff dampers
SHAHIN BADALY
05/16/2024
Special inspection requirement — Final
MOHAMMAD BADALY
05/16/2024
Special inspection requirement — Mechanical Systems
SHAHIN BADALY
05/13/2024
Filed — Alteration
PROVIDE NEW FURNACE HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08025308-P1
05/13/2024
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-P5
04/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
04/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
04/24/2024
Special inspection requirement — Maintenance information
SHAHIN BADALY
04/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
04/24/2024
Special inspection requirement — Permanent certificate
SHAHIN BADALY
04/11/2024
Violation issued (HPD, closed)
A
03/12/2024
Violation issued (ECB, closed)
Construction
01/25/2024
Permit issued — Plumbing
B08030348-I1-PL
12/20/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/15/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-P4
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
12/15/2023
Special inspection requirement — Permanent certificate
SHAHIN BADALY
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
12/15/2023
Special inspection requirement — Maintenance information
SHAHIN BADALY
12/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
12/13/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
12/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
12/05/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/30/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-P3
09/19/2023
Signed off — Alteration
INTERIOR ALTERATIONS OF EXISTING 8-FAMILY BUILDING AS PER PLANS FILED.
B00746922-I1
08/17/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-P2
03/29/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
03/24/2023
Violation issued (HPD, closed)
A
03/22/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/06/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-P1
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
02/28/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
12/20/2022
Permit issued — Plumbing
B08030348-I1-PL
12/06/2022
Filed — Alteration
PROVIDE NEW FURNACE HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08025308-I1
12/06/2022
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND NEW FIXTURES
B08030348-I1
09/23/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC07/25/2024
DOB NOWMechanical SystemsSigned-offMAMC CONSULTING REPS LLC05/17/2024
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING01/25/2024
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING12/20/2022
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC09/14/2022
DOB NOWGeneral ConstructionSigned-off2260 MAG CORP06/21/2022
2 projects · most recent 07/10/2022
General Wiring
FiledStatusContractorScope
07/10/2022CompleteINFINITI ELECTRIC CORPGeneral Wiring
04/23/2020CompleteEXCALIBUR ELECTRIC INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/20/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/22/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/16/2024Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
05/16/2024Energy Code Compliance InspectionsSHAHIN BADALYprogress
05/16/2024HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
05/16/2024HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
05/16/2024HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
05/16/2024Maintenance informationSHAHIN BADALYenergy_progress
05/16/2024Shutoff dampersSHAHIN BADALYenergy_progress
05/16/2024FinalMOHAMMAD BADALYprogress
05/16/2024Mechanical SystemsSHAHIN BADALYspecial
04/24/2024HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
04/24/2024HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
04/24/2024Maintenance informationSHAHIN BADALYenergy_progress
04/24/2024HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
04/24/2024Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
04/24/2024Energy Code Compliance InspectionsSHAHIN BADALYprogress
04/24/2024Permanent certificateSHAHIN BADALYenergy_progress
12/15/2023HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
12/15/2023Permanent certificateSHAHIN BADALYenergy_progress
12/15/2023HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
12/15/2023Maintenance informationSHAHIN BADALYenergy_progress
12/15/2023HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
12/13/2023Energy Code Compliance InspectionsSHAHIN BADALYprogress
12/13/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
08/17/2023Energy Code Compliance InspectionsSHAHIN BADALYprogress
08/17/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
Latest 25 of 29.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026B00746922-I1Request digital key ↗
08/28/2026B08025308-I1Request digital key ↗
08/28/2026B08025308-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature14
09/18/2026B08030348-P2Open ↗
09/01/2026B08030348-P5Open ↗
09/01/2026B08030348-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026B00746922-I1Open ↗
08/28/2026B08025308-P1Open ↗
08/28/2026B08025308-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/18/2026B08030348-P2Open ↗
09/01/2026B08030348-P5Open ↗
08/29/2026B08030348-P4Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00746922-I1Open ↗
08/28/2026B08025308-P1Open ↗
08/28/2026B08025308-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08025308-I1Open ↗
▸Other Documents9
▸DOB NOWDHCR Document9
08/13/2026B08030348-I1Open ↗
08/13/2026B08025308-I1Open ↗
08/13/2026B08030348-P5Open ↗
Showing 3 of 9 on file for this type