← Back
Three families
575 MORGAN AVENUE
BROOKLYN · BIN 3067285
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,402 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · Owner of record: TOWNHOUSE RENTAL V, L.L.C. · 1,900 sf lot · 1.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 18 docs
Floor 33p · 3 filings · 20 docs
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar3p · 3 filings · 20 docs
1 job · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023CompleteOMD ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (3)Violation (7)Inspection (2)Special Inspection (20)
03/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2023
Signed off — Alteration
Installation of Heating System.
B00851535-I1
12/08/2023
Signed off — Alteration
RENOVATION OF APARTMENTS 1,2 AND 3. CONNECT ACCESSORY USE CELLAR WITH APARTMENT 1 VIA NEW STAIRCASE
B00831591-I1
12/05/2023
Signed off — Alteration
Installation of Plumbing Fixtures.
B00851530-I1
11/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/31/2023
Filed — Alteration
Installation of Heating System.
B00851535-P1
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/31/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
10/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/31/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
10/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2023
Permit issued — Mechanical Systems
B00851535-I1-MS
04/25/2023
Permit issued — Plumbing
B00851530-I1-PL
04/11/2023
Filed — Alteration
Installation of Heating System.
B00851535-I1
04/11/2023
Filed — Alteration
Installation of Plumbing Fixtures.
B00851530-I1
04/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
04/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
04/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
03/24/2023
Violation issued (HPD, closed)
A
03/21/2023
Filed — Alteration
RENOVATION OF APARTMENTS 1,2 AND 3. CONNECT ACCESSORY USE CELLAR WITH APARTMENT 1 VIA NEW STAIRCASE
B00831591-I1
01/11/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
01/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/21/2022
Special inspection requirement — Final
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS803/22/2026
TOWNHOUSE RENTAL V, L.L.C.203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2024$3.7M—— → —$1,088/sf building
12/15/2022$1.9M—— → —$544/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD310/31/2023
CPENGINEERING PC103/21/2023
THE VILNITS GROUP1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE CORE GROUP LLCGeneral Contractor203/21/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727310/31/2023
PSI AGENCY INC.254103/21/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEMPIRE CORE GROUP LLC05/30/2023
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC04/25/2023
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/31/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
10/31/2023FinalNICHOLAS AZADIANprogress
10/31/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
10/31/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
10/31/2023Mechanical SystemsNICHOLAS AZADIANspecial
10/31/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
10/17/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
10/17/2023Mechanical SystemsNICHOLAS AZADIANspecial
10/17/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
10/17/2023FinalNICHOLAS AZADIANprogress
10/17/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
10/17/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
04/11/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
04/11/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
04/11/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
03/28/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
03/28/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
01/11/2023Construction Operations Influencing Adjacent Structures—special
01/11/2023Structural Stability – Alterations of existing buildings—special
12/21/2022Final—progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B00803016-I1Request digital key ↗
08/27/2026B00831591-I1Request digital key ↗
08/27/2026B00851530-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature14
08/27/2026B00851530-I1Open ↗
08/27/2026B00851530-I1Open ↗
08/27/2026B00851530-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00851535-P1Open ↗
08/27/2026B00851535-I1Open ↗
08/13/2026B00803016-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B00851530-I1Open ↗
08/25/2026B00851535-I1Open ↗
08/22/2026B00851535-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00851535-P1Open ↗
08/27/2026B00851535-I1Open ↗
08/13/2026B00803016-I1Open ↗
Showing 3 of 5 on file for this type