← Back
Over six families without stores
296 NASSAU AVENUE
BROOKLYN · BIN 3067411
💬 Discuss this project
1929Year Built
4Stories
C1Building Class
R6BZoning
8,225 sfGross Floor Area
9Units
Rent Stabilized29 Open Violations ▸FDNY Report ↗
Over six families without stores · 2,750 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFETECH ENTERPRISES407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC108/25/2024
ASE PLLC110/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGGING CONSULTANTS203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFETECH ENTERPRISES CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745108/22/2024
ASE ENGINEERING PLLC5785110/23/2023
Building Lifecycle
All (74)Filed (3)Permit Issued (3)Signed Off (3)Violation (54)Objection (2)Special Inspection (9)
05/08/2025
Signed off — Alteration
EXTERIOR FACADE RESTORATION. WORK INCLUDES BRICK AND STONE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00923245-I1
04/10/2025
Signed off — Alteration
FACADE RESTORATION VIA SUSPENDED SCAFFOLDINGS
B01098711-I1
04/08/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01101355-I1
08/28/2024
Permit issued — Suspended Scaffold
B01098711-I1-SC
08/28/2024
Objection raised — Other
08/28/2024
Objection resolved — Addressed
08/26/2024
Permit issued — Supported Scaffold
B01101355-I1-SF
08/25/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01101355-I1
08/22/2024
Filed — Alteration
FACADE RESTORATION VIA SUSPENDED SCAFFOLDINGS
B01098711-I1
08/20/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
08/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
07/17/2024
Permit issued — Structural
B00923245-I1-GC-CX
12/22/2023
Violation issued (HPD, closed)
C
12/22/2023
Violation issued (HPD, closed)
C
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
C
10/23/2023
Filed — Alteration
EXTERIOR FACADE RESTORATION. WORK INCLUDES BRICK AND STONE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00923245-I1
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
09/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
alon egozi
09/19/2023
Special inspection requirement — Air barrier - visual inspection
alon egozi
09/19/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
alon egozi
09/19/2023
Special inspection requirement — Masonry
alon egozi
08/22/2023
Special inspection requirement — Final
alon egozi
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2019
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2018
Violation issued (ECB, closed)
Boilers
12/07/2017
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/23/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2000
Violation issued (HPD, closed)
B
01/20/2000
Violation issued (HPD, closed)
B
01/20/2000
Violation issued (HPD, closed)
B
01/20/2000
Violation issued (HPD, closed)
B
01/20/2000
Violation issued (HPD, closed)
B
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSAFETECH ENTERPRISES CORP08/28/2024
DOB NOWSupported ScaffoldSigned-offSAFETECH ENTERPRISES CORP08/26/2024
DOB NOWStructuralSigned-offSAFETECH ENTERPRISES CORP07/17/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/20/2024Post-installed AnchorsMichael Walshspecial
08/20/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
09/19/2023Structural Stability – Alterations of existing buildingsalon egozispecial
09/19/2023Tenant Protection Plan Compliancealon egozispecial
09/19/2023Energy Code Compliance Inspectionsalon egoziprogress
09/19/2023Air barrier - visual inspectionalon egozienergy_progress
09/19/2023Construction Operations Influencing Adjacent Structuresalon egozispecial
09/19/2023Masonryalon egozispecial
08/22/2023Finalalon egoziprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00923245-I1Request digital key ↗
08/24/2026B01101355-I1Request digital key ↗
08/14/2026B01098711-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00923245-I1Open ↗
08/25/2026B01098711-I1Open ↗
08/25/2026B01098711-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00923245-I1Open ↗
08/28/2026B00923245-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01101355-I1Open ↗
08/13/2026B00923245-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00923245-I1Open ↗
▸Other Documents3
▸DOB NOWCalculations1
08/13/2026B01098711-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01098711-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00923245-I1Open ↗