← Back
Miscellaneous two family
14 HAUSMAN STREET
BROOKLYN · BIN 3067479
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6Zoning
1,232 sfGross Floor Area
2Units
Miscellaneous two family · 750 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 1
Cellar3p · 2 filings · 18 docs
1 job · most recent 12/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/03/2025Signed-offNEW YORK PARK PLBG&HTG COGas, Water/Sanitary
1 job · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026CompleteBRANDL ELECTRIC INC.General Wiring
Building Lifecycle
All (32)Filed (4)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (18)
05/27/2026
Signed off — Alteration
PROPOSE INTERIOR RENOVATION TO EXISTING TWO FAMILY DWELLING.
B01226531-I1
05/26/2026
Signed off — Alteration
PROPOSE TO REPLACE & RELOCATE, EXISTING PLUMBING FIXTURES AND CAP AND REMOVE ALL GAS FIXTURES.
B01243955-I1
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/05/2025
Special inspection requirement — Final
STAVROS MALLIAROS
12/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
12/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
12/05/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
12/05/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
12/05/2025
Special inspection requirement — Lighting controls
PAUL MARINO
12/05/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
12/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
12/03/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION TO EXISTING TWO FAMILY DWELLING.
B01226531-P2
12/03/2025
Filed — Alteration
PROPOSE TO REPLACE & RELOCATE, EXISTING PLUMBING FIXTURES AND CAP AND REMOVE ALL GAS FIXTURES.
B01243955-P1
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/03/2025
Special inspection requirement — Final
STAVROS MALLIAROS
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
12/03/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
12/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
12/03/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
12/03/2025
Special inspection requirement — Lighting controls
PAUL MARINO
12/03/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
09/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/18/2025
Permit issued — General Construction
B01226531-I1-GC
07/11/2025
Permit issued — Plumbing
B01243955-I1-PL
06/20/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION TO EXISTING TWO FAMILY DWELLING.
B01226531-I1
06/20/2025
Filed — Alteration
PROPOSE TO REPLACE & RELOCATE, EXISTING PLUMBING FIXTURES AND CAP AND REMOVE ALL GAS FIXTURES.
B01243955-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/13/2025$900K—— → —$731/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STAVROS I. MALLIAROS, P.E., P.C.412/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MK EXP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARTA CONSTRUCTION & RENOVGeneral Contractor303/21/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050212/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offARTA CONSTRUCTION & RENOV07/18/2025
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO07/11/2025
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/05/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/05/2025FinalSTAVROS MALLIAROSprogress
12/05/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
12/05/2025HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
12/05/2025Fenestration areasPAUL MARINOenergy_progress
12/05/2025Interior lighting powerPAUL MARINOenergy_progress
12/05/2025Lighting controlsPAUL MARINOenergy_progress
12/05/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
12/05/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/03/2025FinalSTAVROS MALLIAROSprogress
12/03/2025HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
12/03/2025Fenestration areasPAUL MARINOenergy_progress
12/03/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
12/03/2025Interior lighting powerPAUL MARINOenergy_progress
12/03/2025Lighting controlsPAUL MARINOenergy_progress
12/03/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
12/03/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01226531-I1Request digital key ↗
08/19/2026B01226531-P2Request digital key ↗
08/19/2026B01243955-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01226531-I1Open ↗
08/19/2026B01226531-P2Open ↗
08/19/2026B01243955-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/13/2026B01226531-I1Open ↗
09/13/2026B01226531-I1Open ↗
08/26/2026B01226531-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/13/2026B01226531-I1Open ↗
08/26/2026B01226531-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01226531-I1Open ↗
08/19/2026B01226531-P2Open ↗
08/19/2026B01243955-I1Open ↗
Showing 3 of 4 on file for this type