← Back
Miscellaneous two family
189 KINGSLAND AVENUE
BROOKLYN · BIN 3067755
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
2,520 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · 2,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 15 docs
Penthouse4p · 1 filing · 15 docs
Floor 44p · 1 filing · 15 docs
Floor 31p · 1 filing · 15 docs
Floor 22p · 1 filing · 15 docs
Floor 12p · 1 filing · 15 docs
Cellar2p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC404/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)103/21/2026
XPDITE GROUP 103103/21/2026
Building Lifecycle
All (50)Filed (3)Violation (3)Objection (38)Special Inspection (6)
06/11/2026
Special inspection requirement — Concrete - Cast-In-Place
04/21/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO VERTICALLY AND HORIZONALLY ENLARGE AN EXISTING TWO STORY + BASEMENT BUILDING. BUILDING TO BE CONVERTED INTO A FOUR STORY + PENHOUSE THREE FAMILY BUILDING
B01325636-S1
04/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO VERTICALLY AND HORIZONALLY ENLARGE AN EXISTING TWO STORY + BASEMENT BUILDING. BUILDING TO BE CONVERTED INTO A FOUR STORY + PENHOUSE THREE FAMILY BUILDING
B01325636-S3
04/08/2026
Objection raised — Scope
04/08/2026
Objection raised — Zoning
04/08/2026
Objection raised — Zoning
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Scope
03/11/2026
Objection raised — Structural
02/25/2026
Special inspection requirement — Structural Cold-Formed Steel
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/25/2026
Special inspection requirement — Structural Steel - Details
02/25/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/17/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Addressed
01/28/2026
Objection raised — Admin
01/28/2026
Objection raised — Scope
01/14/2026
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Special inspection requirement — Final
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Admin
12/11/2025
Objection raised — Admin
12/11/2025
Objection raised — Mechanical
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Cost
12/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO VERTICALLY AND HORIZONALLY ENLARGE AN EXISTING TWO STORY + BASEMENT BUILDING. BUILDING TO BE CONVERTED INTO A FOUR STORY + PENHOUSE THREE FAMILY BUILDING
B01325636-I1
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Nothing on file for this building.
1 project · most recent 04/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/13/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTA36AAVJU 40,000 BTU · Vrf Outdoor ×1
RXTA48AAVJU 52,000 BTU · Vrf Outdoor ×1
RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×1
2 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedK.A.B. ELECTRIC CORPGeneral Wiring
12/16/2025Permit IssuedAG POWER ELECTRIC CORPGeneral Wiring
1 project · most recent 04/13/2026
Steel Wood
FiledStatusContractorScope
04/13/2026——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/11/2026Concrete - Cast-In-Place—special
02/25/2026Structural Cold-Formed Steel—special
02/25/2026Structural Stability – Alterations of existing buildings—special
02/25/2026Structural Steel - Details—special
02/25/2026Structural Steel - High Strength Bolting—special
12/16/2025Final—progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026B01325636-I1Request digital key ↗
08/17/2026B01325636-S3Request digital key ↗
08/17/2026B01325636-S8Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B01325636-I1Open ↗
08/13/2026B01325636-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01325636-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01325636-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01325636-S3Open ↗
08/17/2026B01325636-S8Open ↗
08/17/2026B01325636-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026B01325636-S8Open ↗
08/17/2026B01325636-S1Open ↗
08/13/2026B01325636-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026B01325636-S8Open ↗
08/17/2026B01325636-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026B01325636-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01325636-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01325636-I1Open ↗