← Back
Predominantly retail with other uses
371 GRAHAM AVENUE
BROOKLYN · BIN 3068604
💬 Discuss this project
1910Year Built
2Stories
K4Building Class
R6AZoning
2,250 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · 1,250 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KONOSKI ENGINEERING PLLC208/26/2026
ALLEN SHINFELD, P.E. PLLC105/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ICEBERG MECHANICAL CORPGeneral Contractor109/03/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KONOSKI ENGINEERING PLLC9111108/26/2026
Building Lifecycle
All (26)Filed (3)Permit Issued (2)Signed Off (1)Violation (6)Special Inspection (14)
09/02/2026
Permit issued — Mechanical Systems
B01450092-I1-MS
08/26/2026
Filed — Alteration
Filing herewith for installation of HVAC equipment
B01450092-I1
08/26/2026
Filed — Alteration
Filing herewith for installation of HVAC equipment
B01450092-S1
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
christopher konoski
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
christopher konoski
08/23/2026
Special inspection requirement — Final
christopher konoski
08/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
christopher konoski
08/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
christopher konoski
08/23/2026
Special inspection requirement — Maintenance information
christopher konoski
08/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
christopher konoski
08/23/2026
Special inspection requirement — Ventilation and air distribution system
christopher konoski
08/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
08/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/23/2026
Special inspection requirement — Maintenance information
08/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/23/2026
Special inspection requirement — Mechanical Systems
christopher konoski
08/15/2024
Violation issued (FDNY_NOV, closed)
10/11/2022
Violation issued (FDNY_NOV, closed)
01/08/2019
Signed off — Alteration
B00043699-I1
07/25/2018
Permit issued — Sign
B00043699-I1-SG
05/14/2018
Filed — Alteration
B00043699-I1
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/1988
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offICEBERG MECHANICAL CORP09/02/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/25/2018
1 project · most recent 08/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Signed-offICEBERG MECHANICAL CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-FX09NL 9,000 BTU · Fan Coil Indoor ×1
MSZ-FX15NL 15,000 BTU · Fan Coil Indoor ×1
MXZ-2D20NLHZ-U1 20,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/26/2026——Gas, Water/Sanitary
3 projects · most recent 07/17/2026
General Wiring
FiledStatusContractorScope
07/17/2026Permit IssuedMANGI ELECTRICAL CORP1 meters
05/13/2018CompleteJONG HYUN KIM—
04/25/2018Permit IssuedTHROOP ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/26/2026Tenant Protection Plan Compliancechristopher konoskispecial
08/26/2026Tenant Protection Plan Compliancechristopher konoskispecial
08/23/2026Finalchristopher konoskiprogress
08/23/2026HVAC-R and service water heating equipmentchristopher konoskienergy_progress
08/23/2026HVAC-R and service water heating system controlschristopher konoskienergy_progress
08/23/2026Maintenance informationchristopher konoskienergy_progress
08/23/2026HVAC-R and service water piping design and insulationchristopher konoskienergy_progress
08/23/2026Ventilation and air distribution systemchristopher konoskienergy_progress
08/23/2026Fire-Resistant Penetrations and Jointschristopher konoskispecial
08/23/2026HVAC-R and service water heating equipment—energy_progress
08/23/2026HVAC-R and service water piping design and insulation—energy_progress
08/23/2026Maintenance information—energy_progress
08/23/2026HVAC-R and service water heating system controls—energy_progress
08/23/2026Mechanical Systemschristopher konoskispecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026B00043699-I1Request digital key ↗
08/27/2026B01450092-S1Request digital key ↗
08/27/2026B01450092-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01450092-S1Open ↗
09/23/2026B01450092-S1Open ↗
09/23/2026B01450092-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026B00043699-I1Open ↗
08/27/2026B01450092-I1Open ↗
08/27/2026B01450092-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01450092-I1Open ↗
09/23/2026B01450092-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B01450092-I1Open ↗
08/27/2026B01450092-S1Open ↗