← Back
Miscellaneous two family
72 DEVOE STREET
BROOKLYN · BIN 3068980
💬 Discuss this project
1901Year Built
2.5Stories
B9Building Class
R6BZoning
2,368 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,500 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof20p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
1 job · most recent 09/04/2024
Sprinkler System
FiledStatusContractorScope
09/04/2024Signed-offREAL PLUMBING CORPSprinkler System
1 job · most recent 09/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/04/2024——Gas, Water/Sanitary
1 job · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023CompleteCMY ELECTRICAL CORPGeneral Wiring
1 job · most recent 09/04/2024
Steel Concrete Wood
FiledStatusContractorScope
09/04/2024Signed-offMEGA PLBG CORPSteel, Concrete, Wood
Building Lifecycle
All (85)Filed (8)Permit Issued (3)Signed Off (3)Violation (1)Inspection (4)Objection (64)Special Inspection (2)
01/07/2025
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-S3
11/06/2024
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-S1
10/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Objection resolved — Addressed
09/20/2024
Signed off — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-S2
09/18/2024
Objection raised — Scope
09/04/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-P4
08/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2024
Special inspection requirement — Sprinkler Systems
Joseph Vuto
07/16/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-P3
07/11/2024
Special inspection requirement — Sprinkler Systems
Joseph Vuto
06/26/2024
Permit issued — Sprinklers
B00801465-S3-EW-SP
04/30/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Scope
04/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-P2
03/26/2024
Violation issued (FDNY_NOV, closed)
01/10/2024
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-P1
12/04/2023
Objection resolved — Addressed
10/31/2023
Permit issued — General Construction
B00801465-I1-GC
10/24/2023
Permit issued — Structural
B00801465-S2-ST
10/13/2023
Objection raised — Admin
10/11/2023
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-S3
04/14/2023
Objection raised — Admin
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Admin
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Structural
04/05/2023
Objection resolved — Addressed
03/29/2023
Filed — Alteration CO
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT CO FILING. NEW CO TO BE OBTAINED.
B00801465-S2
03/24/2023
Objection raised — Mechanical
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Admin
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Scope
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Inspections
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Inspections
03/24/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Admin
03/24/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Scope
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Structural
03/23/2023
Objection resolved — Addressed
03/15/2023
Objection raised — Zoning
Latest 60 of 85 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/10/2022$3.2M—Private party → Private party$1,351/sf building
08/02/2018$2.9M—Private party → Private party$1,235/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAUTE ARCHITECTURE DPC509/04/2024
JMV CONSULTING ENGINEERING207/16/2024
IVAN DESIGN ENG. ANALYSIS, PLLC103/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDOPS INCGeneral Contractor603/21/2026
MEGA PLBG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IVAN DESIGN ENGINEERING &6983309/04/2024
JMV CONSULTING ENGINEERIN804207/16/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offREAL PLUMBING CORP06/26/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDOPS INC10/31/2023
DOB NOWStructuralSigned-offBUILDOPS INC10/24/2023
BISPLISSUEDA & E PLUMBING CORP06/05/2013
BISPLISSUEDDELTA-SIGMA MECH CORP03/01/2013
BISOTISSUEDDAF CONTRACTING LTD01/15/2013
BISOTISSUEDDAF CONTRACTING LTD01/15/2013
BISOTISSUEDDAF CONTRACTING LTD11/08/2012
BISOTISSUEDDAF CONTRACTING LTD11/07/2012
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/23/2024Sprinkler SystemsJoseph Vutospecial
07/11/2024Sprinkler SystemsJoseph Vutospecial
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026B00801465-P4Request digital key ↗
08/24/2026B00801465-P3Request digital key ↗
08/24/2026B00801465-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
06/06/2013320532107Open ↗
03/04/2013320532107Open ↗
01/16/2013320532107Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
10/29/2013320532107Open ↗
03/26/2013320532107Open ↗
10/11/2012320532107Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00801465-I1Open ↗
08/13/2026B00801465-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00801465-I1Open ↗
08/13/2026B00801465-P4Open ↗
▸BISZONING DIAGRAM1
09/07/2012320532107Open ↗
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/24/2013320532107Open ↗
10/24/2013320532107Open ↗
10/09/2013320532107Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B00801465-S2Open ↗
08/24/2026B00801465-P4Open ↗
08/24/2026B00801465-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00801465-P3Open ↗
08/23/2026B00801465-S3Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
11/29/2013320532107Open ↗
10/05/2013320532107Open ↗
08/07/2013320532107Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/17/2013320532107Open ↗
10/29/2013320532107Open ↗
03/26/2013320532107Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00801465-P4Open ↗
08/13/2026B00801465-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B00801465-P4Open ↗
08/24/2026B00801465-P3Open ↗
08/24/2026B00801465-P1Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/07/2012320532107Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/09/2013320532107Open ↗
11/08/2012320532107Open ↗
08/07/2012320532107Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/09/2013320532107Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/07/2012320532107Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/24/2013320532107Open ↗
10/09/2013320532107Open ↗
12/24/2013320532107Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/06/2013320532107Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/07/2012320532107Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/09/2013320532107Open ↗
09/07/2012320532107Open ↗
08/07/2012320532107Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
04/16/2013320532107Open ↗
04/16/2013320532107Open ↗
12/24/2012320532107Open ↗
▸BISEFILING COVER SHEET2
10/11/2012320532107Open ↗
08/07/2012320532107Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram2
08/13/2026B00801465-I1Open ↗
08/13/2026B00801465-P4Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026B00801465-P4Open ↗
08/15/2026B00801465-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00801465-I1Open ↗
08/13/2026B00801465-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00801465-I1Open ↗
08/13/2026B00801465-P4Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00801465-I1Open ↗