← Back
General warehouse
7 REWE STREET
BROOKLYN · BIN 3070497
💬 Discuss this project
1957Year Built
1Stories
E1Building Class
M3-1Zoning
74,180 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
General warehouse · Owner of record: WEST TERMINAL, LLC · 101,275 sf lot · 0.73 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingCivil
Permit Issued — active, not yet Signed-off
Floor 1Under Construction24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAVISTONE1207/08/2026
WEST TERMINAL, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAPA ARCHITECTURE PC405/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHRISTOPHER V. PAPA ARCHITECT, PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITAN BUILDERS & CONSTRGeneral Contractor907/08/2026
TITAN REALTY & CONSTRUCTIGeneral Contractor303/21/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088105/23/2024
Building Lifecycle
All (60)Filed (4)Permit Issued (7)Violation (17)Inspection (2)Special Inspection (30)
12/31/2025
Permit issued — General Construction
B01020753-I1-GC
12/30/2025
Permit issued — Structural
B01020753-S2-GC-CX
12/30/2024
Permit issued — General Construction
B01020753-I1-GC
12/27/2024
Permit issued — Earth Work
B01020753-S2-GC-CX
12/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2024
Permit issued — Structural
B01020753-S2-GC-CX
05/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALTERATION B01020753-I1 FOR INSTALLATION OF NEW BATHROOMS AND ADDITIONAL GAS-FIRED HEATING TUBES AT LOADING BAY DOORS.
B01020753-S2
05/23/2024
Special inspection requirement — Masonry
ROBERT LIN
05/16/2024
Permit issued — Plumbing
B01020753-S1-PL
05/16/2024
Special inspection requirement — Fenestration air leakage
Christopher Papa
05/16/2024
Special inspection requirement — Metering
Christopher Papa
05/16/2024
Special inspection requirement — Fenestration areas
Christopher Papa
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Papa
05/16/2024
Special inspection requirement — Exterior lighting power
Christopher Papa
05/16/2024
Special inspection requirement — Interior lighting power
Christopher Papa
05/16/2024
Special inspection requirement — Lighting controls
Christopher Papa
05/16/2024
Special inspection requirement — Vestibules
Christopher Papa
05/16/2024
Special inspection requirement — Air barrier - visual inspection
Christopher Papa
05/16/2024
Special inspection requirement — Final
Christopher Papa
05/14/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALTERATION B01020753-I1 FOR INSTALLATION OF NEW BATHROOMS AND ADDITIONAL GAS-FIRED HEATING TUBES AT LOADING BAY DOORS.
B01020753-P1
05/14/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALTERATION B01020753-I1 FOR INSTALLATION OF NEW BATHROOMS AND ADDITIONAL GAS-FIRED HEATING TUBES AT LOADING BAY DOORS.
B01020753-S1
05/14/2024
Special inspection requirement — Air barrier - visual inspection
Christopher Papa
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Papa
05/14/2024
Special inspection requirement — Final
Christopher Papa
05/14/2024
Special inspection requirement — Interior lighting power
Christopher Papa
05/14/2024
Special inspection requirement — Metering
Christopher Papa
05/14/2024
Special inspection requirement — Vestibules
Christopher Papa
05/14/2024
Special inspection requirement — Lighting controls
Christopher Papa
05/14/2024
Special inspection requirement — Fenestration air leakage
Christopher Papa
05/14/2024
Special inspection requirement — Fenestration areas
Christopher Papa
05/14/2024
Special inspection requirement — Exterior lighting power
Christopher Papa
05/10/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GEORGE CAMBOURAKIS
05/10/2024
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
05/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
05/10/2024
Special inspection requirement — Post-installed Anchors
ROBERT LIN
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LIN
05/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT LIN
05/10/2024
Special inspection requirement — Structural Steel - Welding
ROBERT LIN
05/10/2024
Special inspection requirement — Structural Steel - Details
ROBERT LIN
05/03/2024
Permit issued — General Construction
B01020753-I1-GC
05/03/2024
Special inspection requirement — Final
ROBERT LIN
04/29/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH ALTERATION B01020753-I1 FOR INSTALLATION OF NEW BATHROOMS AND ADDITIONAL GAS-FIRED HEATING TUBES AT LOADING BAY DOORS.
B01020753-I1
05/19/2022
Violation issued (FDNY_NOV, closed)
05/17/2022
Violation issued (FDNY_NOV, closed)
02/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2020
Violation issued (FDNY_NOV, closed)
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2008
Violation issued (FDNY_NOV, closed)
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTITAN BUILDERS & CONSTR12/31/2025
DOB NOWStructuralPermit IssuedTITAN BUILDERS & CONSTR12/30/2025
DOB NOWGeneral ConstructionPermit IssuedTITAN BUILDERS & CONSTR12/30/2024
DOB NOWEarth WorkPermit IssuedTITAN BUILDERS & CONSTR12/27/2024
DOB NOWStructuralPermit IssuedTITAN BUILDERS & CONSTR08/05/2024
DOB NOWPlumbingPermit IssuedG.P. MECHANICAL CORP05/16/2024
DOB NOWGeneral ConstructionPermit IssuedTITAN REALTY & CONSTRUCTI05/03/2024
BISOTISSUEDST SAFETY CONS. INC05/03/2019
BISPLISSUEDL R P CORP09/12/2003
1 project · most recent 05/23/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/23/2024Permit IssuedG.P. MECHANICAL CORPGas, Water/Sanitary
1 project · most recent 06/17/2024
General Wiring
FiledStatusContractorScope
06/17/2024Permit IssuedGOODALL ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/23/2024MasonryROBERT LINspecial
05/16/2024Fenestration air leakageChristopher Papaenergy_progress
05/16/2024MeteringChristopher Papaenergy_progress
05/16/2024Fenestration areasChristopher Papaenergy_progress
05/16/2024Energy Code Compliance InspectionsChristopher Papaprogress
05/16/2024Exterior lighting powerChristopher Papaenergy_progress
05/16/2024Interior lighting powerChristopher Papaenergy_progress
05/16/2024Lighting controlsChristopher Papaenergy_progress
05/16/2024VestibulesChristopher Papaenergy_progress
05/16/2024Air barrier - visual inspectionChristopher Papaenergy_progress
05/16/2024FinalChristopher Papaprogress
05/14/2024Air barrier - visual inspectionChristopher Papaenergy_progress
05/14/2024Energy Code Compliance InspectionsChristopher Papaprogress
05/14/2024FinalChristopher Papaprogress
05/14/2024Interior lighting powerChristopher Papaenergy_progress
05/14/2024MeteringChristopher Papaenergy_progress
05/14/2024VestibulesChristopher Papaenergy_progress
05/14/2024Lighting controlsChristopher Papaenergy_progress
05/14/2024Fenestration air leakageChristopher Papaenergy_progress
05/14/2024Fenestration areasChristopher Papaenergy_progress
05/14/2024Exterior lighting powerChristopher Papaenergy_progress
05/10/2024Subsurface Investigations (Borings/Test Pits)GEORGE CAMBOURAKISspecial
05/10/2024Concrete - Cast-In-PlaceROBERT LINspecial
05/10/2024Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
05/10/2024Post-installed AnchorsROBERT LINspecial
Latest 25 of 31.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01020753-P1Request digital key ↗
08/25/2026B01020753-S2Request digital key ↗
08/25/2026B01020753-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/08/2019321817771Open ↗
▸BISWORK PERMIT APPLICATION1
05/09/2019321817771Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B01020753-S2Open ↗
09/01/2026B01020753-I1Open ↗
09/01/2026B01020753-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01020753-I1Open ↗
08/13/2026B01020753-S1Open ↗
08/13/2026B01020753-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01020753-S2Open ↗
09/02/2026B01020753-S2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/08/2019321817771Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/08/2019321817771Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01020753-I1Open ↗
08/13/2026B01020753-P1Open ↗
08/13/2026B01020753-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B01020753-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01020753-S2Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/08/2019321817771Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/08/2019321817771Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01020753-S2Open ↗