← Back
Primarily 2 family with 1 store or office
93 MONTROSE AVENUE
BROOKLYN · BIN 3071100
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6Zoning
3,075 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: KATRIEL LLC · 2,500 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFELINE GROUP407/08/2026
KATRIEL LLC/ ISAAC POLLAK .503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG ENGINEERING, P.C.105/10/2023
ENTHINK ENGINEERS LLC103/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WRG ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KSZ GROUP INCGeneral Contractor303/21/2026
SAFELINE GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG ENGINEERING, P.C.4403105/10/2023
Building Lifecycle
All (44)Filed (2)Permit Issued (2)Signed Off (2)Violation (28)Objection (4)Special Inspection (6)
12/04/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00842164-I1
08/22/2023
Signed off — Alteration
Exterior facade repair.
B00854868-I1
07/17/2023
Permit issued — General Construction
B00854868-I1-GC
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Winston Garcia
05/12/2023
Objection raised — Other
05/12/2023
Objection resolved — Addressed
05/12/2023
Objection raised — Scope
05/12/2023
Objection resolved — Addressed
05/10/2023
Filed — Alteration
Exterior facade repair.
B00854868-I1
05/09/2023
Special inspection requirement — Masonry
Winston Garcia
05/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Winston Garcia
05/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
05/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Winston Garcia
04/04/2023
Special inspection requirement — Final
Winston Garcia
03/10/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00842164-I1
03/10/2023
Permit issued — Sidewalk Shed
B00842164-I1-SH
03/09/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2022
Violation issued (HPD, closed)
I
04/21/2021
Violation issued (HPD, closed)
I
11/18/2019
Violation issued (HPD, open)
B
11/18/2019
Violation issued (HPD, closed)
I
11/15/2019
Violation issued (HPD, closed)
B
11/15/2019
Violation issued (HPD, open)
C
11/15/2019
Violation issued (HPD, closed)
B
11/15/2019
Violation issued (HPD, closed)
C
11/15/2019
Violation issued (HPD, closed)
A
11/15/2019
Violation issued (HPD, closed)
C
02/09/2018
Violation issued (HPD, closed)
C
09/17/2016
Violation issued (HPD, open)
B
09/17/2016
Violation issued (HPD, open)
B
09/17/2016
Violation issued (HPD, open)
B
09/17/2016
Violation issued (HPD, open)
A
09/17/2016
Violation issued (HPD, open)
B
09/17/2016
Violation issued (HPD, open)
A
09/17/2016
Violation issued (HPD, open)
B
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKSZ GROUP INC07/17/2023
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC03/10/2023
1 project · most recent 03/13/2023
FiledStatusContractorScope
03/13/2023CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/17/2023Exterior Insulation and Finish Systems (EIFS)Winston Garciaspecial
05/09/2023MasonryWinston Garciaspecial
05/09/2023Structural Stability – Alterations of existing buildingsWinston Garciaspecial
05/09/2023Tenant Protection Plan ComplianceWinston Garciaspecial
05/09/2023Energy Code Compliance InspectionsWinston Garciaprogress
04/04/2023FinalWinston Garciaprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00842164-I1Request digital key ↗
08/14/2026B00854868-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026B00854868-I1Open ↗
08/25/2026B00854868-I1Open ↗
08/25/2026B00854868-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00842164-I1Open ↗
08/13/2026B00854868-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00854868-I1Open ↗
08/25/2026B00854868-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00854868-I1Open ↗