← Back
Primarily 4 family with 1 store or office
99 MORGAN AVENUE
BROOKLYN · BIN 3071322
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
M1-2Zoning
5,485 sfGross Floor Area
5Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 99 MA, LLC · 2,500 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 17 docs
Floor 21p · 1 filing · 17 docs
Floor 1Under Construction3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP407/08/2026
99 MA, LLC603/22/2026
PRINCE MEDIA COMPANY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT508/16/2023
PAUL PERDEK, PROF. ENG. PLLC106/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLUSHING ONE CONSTRUCTIONGeneral Contractor303/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
HABER ELECTRIC CO., INC.Electrical103/22/2026
CONSTRUCTION XPERT INCGeneral Contractor107/08/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor107/08/2026
VILLAGE P & H NY INCPlumbing108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513508/16/2023
Building Lifecycle
All (86)Filed (6)Permit Issued (6)Signed Off (2)Violation (31)Inspection (5)Objection (6)Special Inspection (30)
07/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2026
Permit issued — Plumbing
B00913113-S1-PL
05/22/2026
Permit issued — Mechanical Systems
B00913113-I1-GC
01/30/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00534504-I1
11/22/2023
Violation issued (HPD, closed)
I
09/17/2023
Permit issued — General Construction
B00913113-I1-MS
09/15/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/16/2023
Filed — Alteration
RENOVATION OF AN EXISTING DELI STORE AND FILED DUCT WORK FOR EXISTING KITCHEN VENTILATION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
B00913113-I1
08/16/2023
Filed — Alteration
RENOVATION OF AN EXISTING DELI STORE AND FILED DUCT WORK FOR EXISTING KITCHEN VENTILATION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
B00913113-S1
08/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
08/14/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
08/14/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
08/14/2023
Special inspection requirement — Lighting controls
DEZHANG FANG
08/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
08/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
08/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
08/14/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
08/14/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/14/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
08/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
08/02/2023
Special inspection requirement — Mechanical Systems
DEZHANG FANG
08/02/2023
Special inspection requirement — Final
DEZHANG FANG
05/16/2023
Violation issued (HPD, open)
B
05/16/2023
Violation issued (HPD, open)
C
05/16/2023
Violation issued (HPD, open)
B
05/16/2023
Violation issued (HPD, open)
B
01/11/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING AND TO REMOVE ILLEGAL MEZZANINE AT 3RD FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B00704152-I1
01/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/10/2023
Objection resolved — Addressed
01/10/2023
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
01/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
01/10/2023
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
01/10/2023
Special inspection requirement — Final
DEZHANG FANG
01/10/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
01/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/10/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
01/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
01/10/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
01/10/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
01/09/2023
Objection raised — Scope
01/05/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING AND TO REMOVE ILLEGAL MEZZANINE AT 3RD FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B00704152-P2
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
01/05/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/19/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/15/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING AND TO REMOVE ILLEGAL MEZZANINE AT 3RD FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B00704152-P1
09/14/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2022
Permit issued — Sidewalk Shed
B00534504-I1-SH
05/12/2022
Permit issued — General Construction
B00704152-I1-GC-CX
03/30/2022
Objection resolved — Addressed
03/29/2022
Objection raised — Energy
03/28/2022
Objection resolved — Addressed
03/24/2022
Objection raised — Scope
03/23/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING AND TO REMOVE ILLEGAL MEZZANINE AT 3RD FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B00704152-I1
03/01/2022
Violation issued (HPD, closed)
I
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC07/09/2026
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION XPERT INC05/22/2026
DOB NOWGeneral ConstructionPermit IssuedSUPERIOR FIRE CONTROL INC09/17/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/15/2022
DOB NOWGeneral ConstructionSigned-offFLUSHING ONE CONSTRUCTION05/12/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/15/2021
BISOTISSUEDRED HOOK SIGN AND ELECTRI05/29/2015
BIS—ISSUEDRED HOOK SIGN AND ELECT05/29/2015
1 project · most recent 08/16/2023
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScope
08/16/2023Permit IssuedCONSTRUCTION XPERT INCAir Conditioning Systems, Associated Ducts and Piping
1 project · most recent 08/16/2023
Water/Sanitary
FiledStatusContractorScope
08/16/2023Signed-offPARAMOUNT SERVICES, LLCWater/Sanitary
3 projects · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023Permit IssuedHABER ELECTRIC CO., INC.General Wiring
11/02/2022CompleteHABER ELECTRIC CO., INC.—
08/03/2022CompleteV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/16/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
08/14/2023Fenestration areasDEZHANG FANGenergy_progress
08/14/2023Fenestration air leakageDEZHANG FANGenergy_progress
08/14/2023Lighting controlsDEZHANG FANGenergy_progress
08/14/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
08/14/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
08/14/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
08/14/2023Maintenance informationDEZHANG FANGenergy_progress
08/14/2023Interior lighting powerDEZHANG FANGenergy_progress
08/14/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/14/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/14/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
08/14/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
08/14/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
08/02/2023Mechanical SystemsDEZHANG FANGspecial
08/02/2023FinalDEZHANG FANGprogress
01/10/2023Air barrier - visual inspectionDEZHANG FANGenergy_progress
01/10/2023Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
01/10/2023Structural Wood FrameDEZHANG FANGprogress
01/10/2023FinalDEZHANG FANGprogress
01/10/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
01/10/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
01/10/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/10/2023Fenestration air leakageDEZHANG FANGenergy_progress
01/10/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
Latest 25 of 49.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00534504-I1Request digital key ↗
08/30/2026B00704152-P1Request digital key ↗
08/27/2026B00913113-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸BISWORK PERMIT APPLICATION2
06/01/2015321137845Open ↗
06/01/2015321137854Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026B00704152-I1Open ↗
08/30/2026B00704152-I1Open ↗
08/29/2026B00913113-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00534504-I1Open ↗
08/30/2026B00704152-I1Open ↗
08/30/2026B00704152-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B00704152-I1Open ↗
08/29/2026B00913113-I1Open ↗
08/29/2026B00913113-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00913113-S1Open ↗
08/27/2026B00913113-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B00704152-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026B00704152-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
06/01/2015321137854Open ↗
06/01/2015321137845Open ↗