← Back
Primarily 4 family with 1 store or office
112 CENTRAL AVENUE
BROOKLYN · BIN 3072478
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6Zoning
4,967 sfGross Floor Area
5Units
Rent Stabilized35 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 112 CENTRAL AVENUE LLC · 2,500 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 3 docs
Cellar13p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
112 CENTRAL AVE FOOD804/09/2026
112 CENTRAL AVENUE LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2016$1.4M—— → —$282/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C310/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOVAL PLBG & HTG CORPPlumbing407/08/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292310/17/2024
Building Lifecycle
All (87)Filed (3)Permit Issued (6)Signed Off (1)Violation (60)Inspection (10)Special Inspection (7)
05/04/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
11/17/2025
Signed off — Alteration
PROPOSE TO RESTORE GAS SERVICE AT EXISTING DELI.
B00785129-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2025
Permit issued — Plumbing
B00785129-I1-PL
07/16/2025
Violation issued (ECB, open)
Construction
06/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2025
Violation issued (HPD, open)
A
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/27/2024
Violation issued (HPD, open)
I
11/26/2024
Violation issued (ECB, open)
Construction
10/17/2024
Filed — Alteration
CAP & REMOVE AN EXISTING BOILER. INSTALLING 4 NEW GAS BOILERS, 5 GAS HWH, & NEW GAS PIPING THROUGHOUT THE CELLAR. REPLACE GAS RISERS UP TO THE APTS AS PER PLANS SUBMITTED HEREWITH. GAS RANGES ARE TO BE REPLACED AT THE APTS.
B00495356-P1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
08/29/2024
Special inspection requirement — Maintenance information
Jose Santos
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
08/07/2024
Permit issued — Plumbing
B00495356-I1-PL
04/09/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, open)
I
10/25/2022
Permit issued — Plumbing
B00785129-I1-PL
08/30/2022
Filed — Alteration
PROPOSE TO RESTORE GAS SERVICE AT EXISTING DELI.
B00785129-I1
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
07/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/23/2022
Violation issued (HPD, open)
A
02/23/2022
Violation issued (HPD, open)
I
08/26/2021
Permit issued — Plumbing
B63656569-I1-PL
08/26/2021
Permit issued — Plumbing
B00495356-I1-PL
05/26/2021
Permit issued — Plumbing
B00495356-I1-PL
04/13/2021
Filed — Alteration
CAP & REMOVE AN EXISTING BOILER. INSTALLING 4 NEW GAS BOILERS, 5 GAS HWH, & NEW GAS PIPING THROUGHOUT THE CELLAR. REPLACE GAS RISERS UP TO THE APTS AS PER PLANS SUBMITTED HEREWITH. GAS RANGES ARE TO BE REPLACED AT THE APTS.
B00495356-I1
04/07/2021
Violation issued (HPD, open)
A
04/07/2021
Violation issued (HPD, open)
I
12/29/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2019
Violation issued (HPD, open)
I
04/03/2019
Violation issued (HPD, open)
C
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
B
04/03/2019
Violation issued (HPD, open)
C
04/03/2019
Violation issued (HPD, open)
C
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/29/2025
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP08/07/2024
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP10/25/2022
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP08/26/2021
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP08/26/2021
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP05/26/2021
BISPLISSUEDZARA PLUMBING CORP02/07/2019
BISOTISSUEDWNS CONSTRUCTION CORP12/24/2018
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/07/2009
1 project · most recent 10/17/2024
Gas
FiledStatusContractorScope
10/17/2024Permit IssuedDOVAL PLBG & HTG CORPGas
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/29/2024HVAC-R and service water heating system controlsJose Santosenergy_progress
08/29/2024Fire-Resistant Penetrations and JointsJose Santosspecial
08/29/2024Energy Code Compliance InspectionsJose Santosprogress
08/29/2024Maintenance informationJose Santosenergy_progress
08/29/2024HVAC-R and service water piping design and insulationJose Santosenergy_progress
08/29/2024HVAC-R and service water heating equipmentJose Santosenergy_progress
08/01/2022Fire-Resistant Penetrations and JointsJose Santosspecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00785129-I1Request digital key ↗
08/23/2026B00495356-I1Request digital key ↗
08/23/2026B00495356-P1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
02/07/2019340648856Open ↗
12/24/2018340648856Open ↗
12/24/2018340648856Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
04/16/2019340648856Open ↗
11/29/2018340648856Open ↗
03/31/2009320001831Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B00495356-P1Open ↗
08/24/2026B00495356-P1Open ↗
08/24/2026B00495356-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00785129-I1Open ↗
08/23/2026B00495356-P1Open ↗
08/23/2026B00495356-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00785129-I1Open ↗
08/24/2026B00495356-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/29/2018340648856Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/29/2018340648856Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/29/2018340648856Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
04/16/2019340648856Open ↗
11/29/2018340648856Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
11/29/2018340648856Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026B00495356-I1Open ↗
08/23/2026B00495356-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/31/2009320001831Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/29/2018340648856Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/29/2018340648856Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/29/2018340648856Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/29/2018340648856Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
03/31/2009320001831Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/29/2018340648856Open ↗
03/31/2009320001831Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/31/2009320001831Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/29/2018340648856Open ↗