← Back
Five to six families
Willoughby-suydam Historic District
409 SUYDAM STREET · BIN 3073013
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,875 sfGross Floor Area
6Units
Rent Stabilized24 Open Violations 22 unresolved · 2 paperwork only ▸FDNY Report ↗
Five to six families · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
Floor 3Under Construction10p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
409 SUYDAM507/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)403/21/2026
XPDITE GROUP 103203/21/2026
XPDITE GROUP LLC 104203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor307/08/2026
EJP CONTRACTING CORPGeneral Contractor203/21/2026
INFINITI ESC PLUMBING CORPlumbing107/04/2026
MAROTTA & SON P&H CONTR CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAFEDE ARCHITECTURE, PLL8251210/01/2024
SHAHRISH SHUVO ENGINEERIN8524202/20/2024
VALENTINO POMPEO ARCHITEC1013202/03/2023
Building Lifecycle
All (122)Filed (6)Permit Issued (6)Violation (60)Inspection (4)Objection (18)Special Inspection (28)
07/06/2026
Permit issued — Mechanical Systems
B00989270-S2-MS
07/02/2026
Permit issued — Plumbing
B00989270-S1-PL
05/06/2026
Violation issued (HPD, open)
A
02/26/2026
Permit issued — General Construction
B00989270-I1-GC
11/20/2025
Violation issued (HPD, closed)
I
06/11/2025
Violation issued (HPD, open)
A
10/01/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE STORY + CELLAR SIX FAMILY BUILDING
B00989270-S1
10/01/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE STORY + CELLAR SIX FAMILY BUILDING
B00989270-S2
04/12/2024
Violation issued (HPD, open)
A
04/04/2024
Special inspection requirement — Mechanical Systems
Darryl E. Cook
04/04/2024
Special inspection requirement — Heating Systems
Darryl E. Cook
04/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Darryl E. Cook
04/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Darryl E. Cook
04/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Darryl E. Cook
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Darryl E. Cook
04/04/2024
Special inspection requirement — Final
Darryl E. Cook
03/19/2024
Objection resolved — Addressed
03/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darryl E. Cook
03/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Darryl E. Cook
02/28/2024
Objection resolved — Addressed
02/27/2024
Objection raised — Scope
02/27/2024
Objection raised — Scope
02/20/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE STORY + CELLAR SIX FAMILY BUILDING
B00989270-P1
02/09/2024
Special inspection requirement — Interior lighting power
Shahrish Shuvo
02/09/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
02/09/2024
Special inspection requirement — Final
Shahrish Shuvo
02/09/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
02/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
02/09/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
02/09/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
02/09/2024
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
02/08/2024
Permit issued — General Construction
B00989270-I1-GC
01/25/2024
Objection resolved — Addressed
01/24/2024
Objection raised — Scope
01/17/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION TO AN EXISTING THREE STORY + CELLAR SIX FAMILY BUILDING
B00989270-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/2023
Violation issued (HPD, closed)
C
06/07/2023
Violation issued (HPD, closed)
C
06/07/2023
Violation issued (HPD, closed)
B
04/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/29/2023
Violation issued (HPD, closed)
C
03/29/2023
Violation issued (HPD, closed)
B
03/29/2023
Violation issued (HPD, closed)
B
03/29/2023
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
03/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2023
Permit issued — Plumbing
B00740167-S1-PL
02/10/2023
Objection resolved — Addressed
02/10/2023
Objection resolved — Addressed
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VALENTINO POMPEO
02/09/2023
Objection raised — Inspections
02/09/2023
Objection raised — Admin
02/03/2023
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION OF APARTMENTS 1R AT THE 1ST FLOOR OF THE EXISTING 3 STORY RESIDENTIAL BUILDING DUE TO MINOR FIRE DAMAGE. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
B00740167-S1
01/31/2023
Violation issued (HPD, closed)
I
11/14/2022
Violation issued (HPD, closed)
I
10/06/2022
Permit issued — General Construction
B00740167-I1-GC
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedYAFE MEOD CORP07/06/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR07/02/2026
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP02/26/2026
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP02/08/2024
DOB NOWPlumbingSigned-offMAROTTA & SON P&H CONTR C02/24/2023
DOB NOWGeneral ConstructionSigned-offEJP CONTRACTING CORP10/06/2022
2 projects · most recent 10/01/2024
Water/Sanitary Gas
FiledStatusContractorScope
10/01/2024Permit IssuedINFINITI ESC PLUMBING CORWater/Sanitary
02/03/2023Signed-offMAROTTA & SON P&H CONTR CGas, Water/Sanitary
1 project · most recent 05/16/2018
FiledStatusContractorScope
05/16/2018Permit IssuedSALVATORE CAMPISI & SONS7 meters, 7 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/04/2024Mechanical SystemsDarryl E. Cookspecial
04/04/2024Heating SystemsDarryl E. Cookspecial
04/04/2024HVAC-R and service water heating equipmentDarryl E. Cookenergy_progress
04/04/2024HVAC-R and service water heating system controlsDarryl E. Cookenergy_progress
04/04/2024HVAC-R and service water piping design and insulationDarryl E. Cookenergy_progress
04/04/2024Energy Code Compliance InspectionsDarryl E. Cookprogress
04/04/2024FinalDarryl E. Cookprogress
03/07/2024Fire-Resistant Penetrations and JointsDarryl E. Cookspecial
03/07/2024Energy Code Compliance InspectionsDarryl E. Cookprogress
02/09/2024Interior lighting powerShahrish Shuvoenergy_progress
02/09/2024Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
02/09/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/09/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
02/09/2024FinalShahrish Shuvoprogress
02/09/2024Fenestration areasShahrish Shuvoenergy_progress
02/09/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
02/09/2024Fenestration air leakageShahrish Shuvoenergy_progress
02/09/2024Lighting controlsShahrish Shuvoenergy_progress
02/09/2024Lighting in dwelling unitsShahrish Shuvoenergy_progress
02/10/2023Fire-Resistant Penetrations and JointsVALENTINO POMPEOspecial
05/18/2022Fenestration and door U-factor and product ratingsVALENTINO POMPEOenergy_progress
05/18/2022Fenestration air leakageVALENTINO POMPEOenergy_progress
05/18/2022Air barrier - visual inspectionVALENTINO POMPEOenergy_progress
05/18/2022Lighting in dwelling unitsVALENTINO POMPEOenergy_progress
05/18/2022Fire-Resistance Rated ConstructionVALENTINO POMPEOprogress
Latest 25 of 28.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B00989270-S1Request digital key ↗
08/24/2026B00989270-I1Request digital key ↗
08/24/2026B00989270-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00740167-I1Open ↗
09/01/2026B00740167-I1Open ↗
09/01/2026B00740167-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00740167-I1Open ↗
08/30/2026B00989270-P1Open ↗
08/30/2026B00989270-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B00989270-P1Open ↗
08/24/2026B00989270-I1Open ↗
08/24/2026B00989270-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B00989270-S1Open ↗
08/13/2026B00740167-S1Open ↗
08/13/2026B00740167-I1Open ↗
▸Other Documents4
▸DOB NOWDHCR Document4
08/13/2026B00989270-P1Open ↗
08/13/2026B00989270-S2Open ↗
08/13/2026B00989270-I1Open ↗
Showing 3 of 4 on file for this type