Three families
713 BUSHWICK AVENUE
BROOKLYN · BIN 3073077
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
2,265 sfGross Floor Area
3Units
Three families · Owner of record: 713 BUSHWICK LLC · 1,260 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
713 BUSHWICK LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2025$1.3M—Private party → 713 BUSHWICK LLC$574/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC706/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor204/09/2026
BEST PLUMBING & HVAC INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010706/16/2026
Building Lifecycle
All (60)Filed (7)Permit Issued (3)Signed Off (1)Inspection (4)Objection (22)Special Inspection (23)
06/16/2026
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-P4
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
05/14/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/08/2026
Objection raised — Cost
05/08/2026
Objection raised — Other
05/05/2026
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-P3
04/23/2026
Signed off — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-I1
04/23/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Other
04/21/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/17/2026
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-P2
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/10/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
12/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
12/19/2025
Special inspection requirement — Lighting controls
XIUCHENG LI
12/19/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
12/15/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Other
12/07/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Energy
12/01/2025
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-P1
11/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2025
Special inspection requirement — Lighting controls
XIUCHENG LI
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
11/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
11/24/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
10/15/2025
Permit issued — Plumbing
B01231270-S1-PL
10/14/2025
Permit issued — Mechanical Systems
B01231270-S2-MS
09/04/2025
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-S2
09/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
09/03/2025
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-S1
08/18/2025
Permit issued — General Construction
B01231270-I1-GC
08/10/2025
Objection resolved — Addressed
07/27/2025
Objection resolved — Addressed
07/26/2025
Objection resolved — Addressed
07/26/2025
Objection resolved — Addressed
07/26/2025
Objection resolved — Addressed
07/26/2025
Objection resolved — Addressed
06/26/2025
Special inspection requirement — Mechanical Systems
XIUCHENG LI
06/26/2025
Special inspection requirement — Final
XIUCHENG LI
06/12/2025
Objection raised — Cost
06/12/2025
Objection raised — Scope
06/12/2025
Objection raised — Accessibility
06/12/2025
Objection raised — Zoning
06/12/2025
Objection raised — Other
06/12/2025
Objection raised — Other
06/02/2025
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC10/15/2025
DOB NOWMechanical SystemsSigned-offLXC CONSTRUCTION INC10/14/2025
DOB NOWGeneral ConstructionSigned-offLXC CONSTRUCTION INC08/18/2025
1 project · most recent 06/16/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Signed-offLXC CONSTRUCTION INCAir Conditioning Systems
Cooling
Daikin CTXS07WVJU9 7,000 BTU · Ahu ×32
2MXL18QMVJU 18,000 BTU · Condensing Unit ×16
FTXS12WVJU9 12,000 BTU · Ahu ×12
3MXL24WMVJU9 24,000 BTU · Condensing Unit ×8
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Signed-offBEST PLUMBING & HVAC INCGas, Water/Sanitary
1 project · most recent 08/01/2026
General Wiring
FiledStatusContractorScope
08/01/2026CompleteCOMBINED ELECL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/21/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/09/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/09/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/17/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
04/17/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
12/19/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
12/19/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
12/19/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
12/19/2025Lighting controlsXIUCHENG LIenergy_progress
12/19/2025Interior lighting powerXIUCHENG LIenergy_progress
12/19/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/24/2025Lighting controlsXIUCHENG LIenergy_progress
11/24/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
11/24/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
11/24/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
11/24/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/24/2025Interior lighting powerXIUCHENG LIenergy_progress
09/04/2025HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
09/04/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
09/04/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
09/04/2025HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
09/04/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/26/2025Mechanical SystemsXIUCHENG LIspecial
06/26/2025FinalXIUCHENG LIprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026B01231270-S2Request digital key ↗
08/17/2026B01231270-P4Request digital key ↗
08/17/2026B01231270-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 17
08/17/2026B01231270-P4Open ↗
08/15/2026B01231270-P3Open ↗
08/15/2026B01231270-P2Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B01231270-I1Open ↗
08/29/2026B01231270-I1Open ↗
08/27/2026B01231270-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B01231270-I1Open ↗
08/17/2026B01231270-P3Open ↗
08/17/2026B01231270-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026B01231270-I1Open ↗
08/27/2026B01231270-P1Open ↗
08/27/2026B01231270-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01231270-S2Open ↗
08/17/2026B01231270-S1Open ↗
08/17/2026B01231270-P4Open ↗
Showing 3 of 7 on file for this type