Five to six families
306 HARMAN STREET
BROOKLYN · BIN 3075100
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,130 sfGross Floor Area
6Units
Rent Stabilized30 Open Violations 29 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: EOL PROPERTIES, INC. · 2,500 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof6p · 1 filing · 4 docs
Floor 35p · 1 filing · 4 docs
Floor 25p · 1 filing · 4 docs
Floor 15p · 1 filing · 4 docs
Cellar7p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EOL PROPERTIES, INC.403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2014$610K—— → —$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M. HAMDI GUNAL, PE, P. C.204/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H & S CONTRACTING OF NYGeneral Contractor403/21/2026
AMBER ELECTL CONTNG INCElectrical103/22/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.3000204/04/2023
Building Lifecycle
All (109)Filed (2)Permit Issued (3)Signed Off (1)Violation (60)Inspection (3)Objection (24)Special Inspection (16)
05/19/2026
Violation issued (ECB, open)
Construction
05/06/2025
Signed off — Alteration
Building renovation, including new kitchen and bathrooms, misc. cellar repairs as per approved plans. New steel girder/column installation in Cellar, including 4"x 4" wood load bearing walls from 1st floor to roof. No change in use, egress or occupancy
B00843672-I1
11/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2024
Permit issued — Structural
B00843672-I1-GC-CX
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/18/2024
Permit issued — General Construction
B00843672-I1-GC-CX
07/16/2024
Permit issued — Plumbing
B00804353-I1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Other
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Other
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Other
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Other
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Fire_Protection
04/10/2023
Objection resolved — Addressed
04/04/2023
Filed — Alteration
Building renovation, including new kitchen and bathrooms, misc. cellar repairs as per approved plans. New steel girder/column installation in Cellar, including 4"x 4" wood load bearing walls from 1st floor to roof. No change in use, egress or occupancy
B00843672-I1
04/04/2023
Filed — Alteration
B00804353-I1
03/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
Mehmet Gunal
03/23/2023
Violation issued (HPD, closed)
A
03/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mehmet Gunal
03/14/2023
Special inspection requirement — Concrete - Cast-In-Place
Mehmet Gunal
03/14/2023
Special inspection requirement — Structural Steel - Details
Mehmet Gunal
03/14/2023
Special inspection requirement — Structural Steel - Welding
Mehmet Gunal
03/14/2023
Special inspection requirement — Subgrade Inspections
Mehmet Gunal
03/14/2023
Special inspection requirement — Final
Mehmet Gunal
03/14/2023
Special inspection requirement — Air barrier - visual inspection
Mehmet Gunal
03/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Mehmet Gunal
03/14/2023
Special inspection requirement — Fenestration areas
Mehmet Gunal
03/14/2023
Special inspection requirement — Lighting controls
Mehmet Gunal
03/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mehmet Gunal
03/14/2023
Special inspection requirement — Lighting in dwelling units
Mehmet Gunal
03/14/2023
Special inspection requirement — Interior lighting power
Mehmet Gunal
03/14/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Mehmet Gunal
03/14/2023
Special inspection requirement — Insulation placement and R values
Mehmet Gunal
08/04/2022
Violation issued (HPD, open)
C
08/04/2022
Violation issued (HPD, closed)
B
08/04/2022
Violation issued (HPD, open)
C
08/04/2022
Violation issued (HPD, closed)
B
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH & S CONTRACTING OF NY10/03/2024
DOB NOWGeneral ConstructionSigned-offH & S CONTRACTING OF NY07/18/2024
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C07/16/2024
1 project · most recent 06/29/2025
General Wiring
FiledStatusContractorScope
06/29/2025CompleteAMBER ELECTL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/30/2023Tenant Protection Plan ComplianceMehmet Gunalspecial
03/14/2023Structural Stability – Alterations of existing buildingsMehmet Gunalspecial
03/14/2023Concrete - Cast-In-PlaceMehmet Gunalspecial
03/14/2023Structural Steel - DetailsMehmet Gunalspecial
03/14/2023Structural Steel - WeldingMehmet Gunalspecial
03/14/2023Subgrade InspectionsMehmet Gunalspecial
03/14/2023FinalMehmet Gunalprogress
03/14/2023Air barrier - visual inspectionMehmet Gunalenergy_progress
03/14/2023Fenestration and door U-factor and product ratingsMehmet Gunalenergy_progress
03/14/2023Fenestration areasMehmet Gunalenergy_progress
03/14/2023Lighting controlsMehmet Gunalenergy_progress
03/14/2023HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
03/14/2023Lighting in dwelling unitsMehmet Gunalenergy_progress
03/14/2023Interior lighting powerMehmet Gunalenergy_progress
03/14/2023Construction Operations Influencing Adjacent StructuresMehmet Gunalspecial
03/14/2023Insulation placement and R valuesMehmet Gunalenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00804353-I1Request digital key ↗
08/15/2026B00843672-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00804353-I1Open ↗
08/13/2026B00843672-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/12/2026B00843672-I1Open ↗
09/12/2026B00843672-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/12/2026B00843672-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00804353-I1Open ↗
08/13/2026B00843672-I1Open ↗
▸Other Documents2
▸DOB NOWHPD4: CONH Pilot Program2
08/13/2026B00843672-I1Open ↗
08/13/2026B00804353-I1Open ↗