← Back
Five to six families
166 WYCKOFF AVENUE
BROOKLYN · BIN 3075161
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
5,130 sfGross Floor Area
6Units
Rent Stabilized73 Open Violations ▸
Five to six families · 2,770 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 7 docs
Floor 3Under Construction16p · 2 filings · 17 docs
Floor 2Under Construction15p · 2 filings · 17 docs
Floor 1Under Construction16p · 2 filings · 18 docs
CellarUnder Construction18p · 2 filings · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.106/10/2026
NS ENGINEERS, P.C.205/21/2026
SUSTAINABLE DESIGN ENGINEERING PLLC204/22/2026
IKRA CONSULTING LLC204/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEE CONSTRUCTIONS LLCGeneral Contractor408/26/2026
WATSON'S PLBG, HTG, & BDGPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244106/10/2026
NS ENGINEERS, P.C.1442105/20/2026
SUSTAINABLE DESIGN ENGINE1404104/22/2026
IKRA CONSULTING LLC7032104/02/2026
Building Lifecycle
All (74)Filed (7)Permit Issued (7)Violation (60)
07/23/2026
Permit issued — Mechanical Systems
B01413527-I1-MS
06/15/2026
Permit issued — Plumbing
B01368180-S1-PL
06/10/2026
Filed — Alteration
Application filed for proposed HVAC and exhaust system installation. No change in use, occupancy, or egress.
B01413527-I1
06/05/2026
Permit issued — Plumbing
B01380390-S1-PL
06/03/2026
Permit issued — General Construction
B01380390-I1-GC
05/21/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 SHOWER, 2 LAV, 2 WC, 1 SINK, 1 DW, 1 W/M); CAP AND REMOVE (1 TUB, 1 SINK, 1 WC) AT APT 2L AND 2R ON THE 2ND FLOOR
B01380390-S1
05/20/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 SHOWER, 2 LAV, 2 WC, 1 SINK, 1 DW, 1 W/M); CAP AND REMOVE (1 TUB, 1 SINK, 1 WC) AT APT 2L AND 2R ON THE 2ND FLOOR
B01380390-I1
05/13/2026
Permit issued — General Construction
B01368180-I1-GC
05/06/2026
Violation issued (HPD, closed)
A
04/23/2026
Permit issued — Plumbing
B01380416-S1-PL
04/22/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 3R AND 3L ON THE 3RD FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOOR, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B01368180-I1
04/22/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 3R AND 3L ON THE 3RD FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOOR, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B01368180-S1
04/17/2026
Permit issued — General Construction
B01380416-I1-GC
04/02/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 1R AND RETAIL SPACE ON THE 1ST FLOOR, AND CELLAR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOOR, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B01380416-I1
04/02/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 1R AND RETAIL SPACE ON THE 1ST FLOOR, AND CELLAR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW WOOD FLOOR, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B01380416-S1
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/12/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
06/01/2019
Violation issued (HPD, open)
A
05/14/2019
Violation issued (HPD, open)
B
05/14/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
B
02/04/2019
Violation issued (HPD, open)
B
02/04/2019
Violation issued (HPD, open)
B
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
B
02/04/2019
Violation issued (HPD, open)
B
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
A
02/04/2019
Violation issued (HPD, open)
C
10/27/2018
Violation issued (HPD, open)
B
10/27/2018
Violation issued (HPD, open)
B
10/27/2018
Violation issued (HPD, open)
B
10/27/2018
Violation issued (HPD, open)
A
10/27/2018
Violation issued (HPD, open)
A
10/27/2018
Violation issued (HPD, open)
B
10/27/2018
Violation issued (HPD, open)
A
05/09/2018
Violation issued (HPD, open)
B
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/12/2017
Violation issued (HPD, open)
C
04/12/2017
Violation issued (HPD, open)
B
04/12/2017
Violation issued (HPD, open)
B
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBEE CONSTRUCTIONS LLC07/23/2026
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG06/15/2026
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG06/05/2026
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC06/03/2026
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC05/13/2026
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG04/23/2026
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC04/17/2026
1 project · most recent 06/10/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Permit IssuedBEE CONSTRUCTIONS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
— 4MXM36AVJU9 34,600 BTU · Condensing Unit ×4
3MXM24AVJU9 24,000 BTU · Condensing Unit ×3
Ventilation
— FV-11VH1 50 CFM · Exhaust Fan ×17
3 projects · most recent 05/21/2026
Water/Sanitary
FiledStatusContractorScope
05/21/2026Permit IssuedWATSON'S PLBG, HTG, & BDGWater/Sanitary
04/22/2026Permit IssuedWATSON'S PLBG, HTG, & BDGWater/Sanitary
04/02/2026Permit IssuedWATSON'S PLBG, HTG, & BDGWater/Sanitary
1 project · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedO.K. ELEC'L SERVICE CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/08/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/08/2026FinalGennadiy Faybyshenkoprogress
06/08/2026Energy Code Compliance InspectionsGennadiy Faybyshenkoprogress
06/08/2026Mechanical SystemsNARESH MAHANGUspecial
03/31/2026Interior lighting powerMD MOSTAFAenergy_progress
03/30/2026FinalShamsul Siddiqueprogress
03/30/2026Energy Code Compliance InspectionsShamsul Siddiqueprogress
03/30/2026Lighting in dwelling unitsShamsul Siddiqueenergy_progress
03/30/2026Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
03/30/2026Energy Code Compliance InspectionsMD MOSTAFAprogress
03/30/2026FinalMD MOSTAFAprogress
03/30/2026Lighting in dwelling unitsMD MOSTAFAenergy_progress
03/30/2026Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
03/12/2026Lighting in dwelling unitsKenny Makenergy_progress
03/10/2026Energy Code Compliance InspectionsKenny Makprogress
03/10/2026Fire-Resistant Penetrations and JointsKenny Makspecial
03/05/2026FinalKayan Tseprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026B01380416-S1Request digital key ↗
08/17/2026B01380416-I1Request digital key ↗
08/17/2026B01368180-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B01413527-I1Open ↗
09/01/2026B01413527-I1Open ↗
08/31/2026B01380416-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B01380416-S1Open ↗
08/17/2026B01380416-I1Open ↗
08/17/2026B01368180-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01413527-I1Open ↗
09/01/2026B01413527-I1Open ↗
08/31/2026B01380416-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01380416-I1Open ↗
08/17/2026B01380416-S1Open ↗
08/17/2026B01368180-S1Open ↗
Showing 3 of 7 on file for this type