← Back
Miscellaneous two family
1444 GREENE AVENUE
BROOKLYN · BIN 3075482
💬 Discuss this project
1899Year Built
3Stories
B9Building Class
R6Zoning
3,060 sfGross Floor Area
2Units
Rent Stabilized56 Open Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: CHARO REALTY INC · 2,000 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC107/20/2026
Building Lifecycle
All (67)Filed (1)Violation (58)Objection (8)
08/19/2026
Objection resolved — Resolved
08/19/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Scope
08/12/2026
Objection raised — Scope
08/10/2026
Objection raised — Cost
07/20/2026
Filed — Alteration
INTERIOR RENOVATION AT CELLAR, 1ST, 2ND & 3RD FLOOR. FLOORING, CEILING, PARTITIONS, MECHANICAL WORKS PER PLAN. NO CHANGE IN USE, EGRESS, OCCUPANCY & BULK
B01433007-I1
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
10/28/2025
Violation issued (HPD, open)
C
10/28/2025
Violation issued (HPD, open)
C
10/28/2025
Violation issued (HPD, open)
B
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, open)
B
06/09/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
03/23/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
02/25/2022
Violation issued (HPD, open)
A
02/25/2022
Violation issued (HPD, open)
I
04/09/2021
Violation issued (HPD, open)
I
04/09/2021
Violation issued (HPD, open)
A
11/25/2019
Violation issued (HPD, open)
B
11/25/2019
Violation issued (HPD, open)
B
11/25/2019
Violation issued (HPD, open)
B
11/25/2019
Violation issued (HPD, open)
B
11/25/2019
Violation issued (HPD, open)
B
10/30/2019
Violation issued (HPD, open)
I
10/17/2018
Violation issued (HPD, open)
I
11/22/2017
Violation issued (HPD, open)
I
11/09/2016
Violation issued (HPD, open)
I
10/09/2015
Violation issued (HPD, open)
I
02/20/2015
Violation issued (HPD, open)
I
04/11/1997
Violation issued (HPD, closed)
A
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
C
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
A
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
07/13/1989
Violation issued (HPD, open)
B
Latest 60 of 67 events.
Nothing on file for this building.
1 project · most recent 07/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×2
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/17/2026Mechanical Systems—special
07/17/2026Fire-Resistant Penetrations and Joints—special
07/17/2026Final—progress
07/17/2026Energy Code Compliance Inspections—progress
07/17/2026Fire-Resistance Rated Construction—progress
07/17/2026HVAC-R and service water piping design and insulation—energy_progress
07/17/2026HVAC-R and service water heating system controls—energy_progress
07/17/2026Interior lighting power—energy_progress
07/17/2026HVAC-R and service water heating equipment—energy_progress
07/17/2026Maintenance information—energy_progress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01433007-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01433007-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01433007-I1Open ↗