← Back
Primarily 4 family with 1 store or office
251 WYCKOFF AVENUE
BROOKLYN · BIN 3075779
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6Zoning
4,125 sfGross Floor Area
5Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: IRVING AVENUE LLC · 2,540 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 32p · 2 filings · 20 docs
Floor 21p · 1 filing · 6 docs
Floor 111p · 3 filings · 20 docs
1 job · most recent 09/02/2025
Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2025Permit IssuedDFE CONTRACTOR LLCOthers, Ventilation Systems
Ventilation
Loren Cook USBI18DD 12,000 CFM · Kitchen Exhaust ×5
Other
— 1-1 1,000 CFM · Ductwork ×5
1 job · most recent 09/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/02/2025Signed-offJUST PLBG & HTG INCGas, Water/Sanitary
1 job · most recent 03/31/2023
FiledStatusContractorScope
03/31/2023Permit IssuedC & A ELECTRICAL CORP7 meters, 1 new_meters
1 job · most recent 07/18/2024
FiledStatusContractorScope
07/18/2024——1 scope_items
Building Lifecycle
All (96)Filed (8)Permit Issued (4)Violation (60)Inspection (9)Special Inspection (15)
02/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, open)
B
12/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/24/2025
Permit issued — Mechanical Systems
B01076210-I1-GC-CX
10/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2025
Special inspection requirement — Mechanical Systems
Albert Munoz
09/03/2025
Special inspection requirement — Final
LESLIE GOOD
09/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Albert Munoz
09/02/2025
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE. PLUMBING WORK AS PER PLAN
B01076249-P3
09/02/2025
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE BUILDING. INTERIOR RENOVATION AS PER PLAN & INSTALL COMMERCIAL KITCHEN HOOD AND DUCTWORK AS PER PLANS
B01076210-P2
08/06/2025
Special inspection requirement — Final
LESLIE GOOD
08/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/06/2025
Special inspection requirement — Mechanical Systems
Albert Munoz
07/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Permit issued — Plumbing
B01076249-I1-PL
04/23/2025
Violation issued (HPD, closed)
B
04/23/2025
Violation issued (HPD, closed)
B
04/23/2025
Violation issued (HPD, open)
C
03/07/2025
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE BUILDING. INTERIOR RENOVATION AS PER PLAN & INSTALL COMMERCIAL KITCHEN HOOD AND DUCTWORK AS PER PLANS
B01076210-P1
03/05/2025
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE. PLUMBING WORK AS PER PLAN
B01076249-P1
03/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2025
Permit issued — Mechanical Systems
B01076210-I1-GC-CX
07/18/2024
Filed — Alteration
EXISTING 3 STORY 5 FAMILY DWELLING AND STORE. REAR ENLARGEMENT TO BE REMOVED AS PER PLAN.
B01076294-I1
07/18/2024
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE BUILDING. INTERIOR RENOVATION AS PER PLAN & INSTALL COMMERCIAL KITCHEN HOOD AND DUCTWORK AS PER PLANS
B01076210-I1
07/18/2024
Filed — Alteration
EXISTING 3 STORY FRAME MIX-USE. PLUMBING WORK AS PER PLAN
B01076249-I1
05/01/2024
Violation issued (HPD, closed)
C
05/01/2024
Violation issued (HPD, closed)
B
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
A
01/11/2023
Violation issued (HPD, closed)
B
09/08/2022
Permit issued — General Construction
B00596776-I1-GC
06/10/2022
Violation issued (HPD, closed)
A
06/10/2022
Violation issued (HPD, closed)
B
06/10/2022
Violation issued (HPD, closed)
A
06/10/2022
Violation issued (HPD, closed)
C
06/10/2022
Violation issued (HPD, closed)
A
06/10/2022
Violation issued (HPD, open)
C
11/05/2021
Violation issued (HPD, closed)
A
11/05/2021
Violation issued (HPD, closed)
B
10/14/2021
Filed — Alteration
EXISTING 3 STORY FRAME & CELLAR, 5 FAMILY DWELLING AND STORE. INTERIOR RENOVATION AS PER PLAN.
B00596776-I1
09/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY VILLANO
09/23/2021
Special inspection requirement — Insulation placement and R values
LESLIE GOOD
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENLINE BLDG CONSULTANTS1107/08/2026
IRVING AVE LLC203/22/2026
OWNER OF 251 WYCKOFF AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTSCAPE409/02/2025
LESLIE M. GOOD ARCHITECTS303/07/2025
ADB ASSOCIATES107/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAST BUILDING SOLUTIONS803/21/2026
ACDE GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor207/08/2026
ABDUL AZIZElectrical103/21/2026
AZIZ ABDULElectrical103/21/2026
BEST DEMO INCGeneral Contractor107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975409/02/2025
ACV DESIGN LTD3864110/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDFE CONTRACTOR LLC10/24/2025
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK06/06/2025
DOB NOWMechanical SystemsPermit IssuedDFE CONTRACTOR LLC01/27/2025
DOB NOWGeneral ConstructionPermit IssuedBEST DEMO INC09/08/2022
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/03/2025Tenant Protection Plan Compliance—special
09/03/2025Mechanical SystemsAlbert Munozspecial
09/03/2025FinalLESLIE GOODprogress
09/03/2025Tenant Protection Plan ComplianceAlbert Munozspecial
08/06/2025FinalLESLIE GOODprogress
08/06/2025Tenant Protection Plan Compliance—special
08/06/2025Mechanical SystemsAlbert Munozspecial
03/04/2025Tenant Protection Plan Compliance—special
09/24/2021Fire-Resistant Penetrations and JointsANTHONY VILLANOspecial
09/23/2021Insulation placement and R valuesLESLIE GOODenergy_progress
09/23/2021Interior lighting powerLESLIE GOODenergy_progress
09/23/2021Energy Code Compliance InspectionsLESLIE GOODprogress
09/23/2021Lighting in dwelling unitsLESLIE GOODenergy_progress
09/23/2021Fire-Resistance Rated ConstructionLESLIE GOODprogress
09/20/2021FinalLESLIE GOODprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00596776-I1Request digital key ↗
08/24/2026B01076294-I1Request digital key ↗
08/20/2026B01076249-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00596776-I1Open ↗
08/20/2026B01076249-I1Open ↗
08/20/2026B01076249-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026B01076210-I1Open ↗
08/26/2026B00596776-I1Open ↗
08/26/2026B00596776-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01076210-I1Open ↗
08/27/2026B01076210-I1Open ↗
08/26/2026B00596776-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00596776-I1Open ↗
08/20/2026B01076249-P1Open ↗
08/20/2026B01076249-I1Open ↗
Showing 3 of 8 on file for this type