← Back
Three families
377 GROVE STREET
BROOKLYN · BIN 3075967
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: SIMANA HOLDINGS LLC · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof5p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIMANA HOLDINGS LLC203/22/2026
ACP HOLDING503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS610/13/2023
SIDERIS KEFALAS ENGINEERS PC206/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T.N.T PLBG & HTG INCFire Protection107/08/2026
IMPACT BUILDERS CORPGeneral Contractor107/08/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415610/13/2023
Building Lifecycle
All (128)Filed (8)Permit Issued (3)Signed Off (2)Violation (60)Inspection (5)Objection (20)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
10/23/2023
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
10/23/2023
Special inspection requirement — Metering
DOYUN KIM
10/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
10/23/2023
Special inspection requirement — Final
DOYUN KIM
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
10/23/2023
Special inspection requirement — Mechanical Systems
DOYUN KIM
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
10/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
10/23/2023
Special inspection requirement — Heating Systems
DOYUN KIM
10/23/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DOYUN KIM
10/13/2023
Filed — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-P4
08/10/2023
Violation issued (HPD, closed)
A
06/29/2023
Signed off — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-S1
06/26/2023
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH DOB NOW # B00683855-I1.
B08012687-I1
06/16/2023
Special inspection requirement — Sprinkler Systems
DOYUN KIM
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
06/12/2023
Filed — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-P3
06/08/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DOYUN KIM
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
06/08/2023
Special inspection requirement — Heating Systems
DOYUN KIM
06/08/2023
Special inspection requirement — Mechanical Systems
DOYUN KIM
06/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
06/08/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
06/08/2023
Special inspection requirement — Final
DOYUN KIM
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
06/08/2023
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
06/08/2023
Special inspection requirement — Metering
DOYUN KIM
06/06/2023
Filed — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH DOB NOW # B00683855-I1.
B08012687-P1
05/30/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Admin
03/23/2023
Violation issued (HPD, closed)
A
03/21/2023
Filed — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-P2
03/21/2023
Filed — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-P1
03/07/2023
Permit issued — Plumbing
B00683855-S1-PL
02/24/2023
Permit issued — Sprinklers
B08012687-I1-EW-SP
02/16/2023
Objection raised — Fire_Protection
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Admin
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Admin
02/16/2023
Objection resolved — Addressed
02/16/2023
Special inspection requirement — Metering
DOYUN KIM
02/16/2023
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
02/16/2023
Special inspection requirement — Final
DOYUN KIM
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
02/16/2023
Special inspection requirement — Mechanical Systems
DOYUN KIM
02/16/2023
Special inspection requirement — Heating Systems
DOYUN KIM
02/03/2023
Filed — Alteration CO
herewith filing alteration type 1 to modify arraignment of SRO rooms on second and third floor, add dwelling at first floor, minor penetrations on roof for plumbing work and relocate scuttle per proposed plans
B00683855-S1
01/20/2023
Permit issued — Mechanical Systems
B00683855-I1-GC-CX
10/05/2022
Objection raised — Inspections
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC03/07/2023
DOB NOWSprinklersSigned-offT.N.T PLBG & HTG INC02/24/2023
DOB NOWMechanical SystemsPermit IssuedIMPACT BUILDERS CORP01/20/2023
BISOTISSUEDJURONG CONSTRUCTION LLC01/17/2013
1 project · most recent 10/13/2023
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
10/13/2023Permit IssuedIMPACT BUILDERS CORPAir Conditioning Systems, Associated Ducts and Piping
Cooling
Mitsubishi Electric MUZ-FS15NA-U1 30,000 BTU · Condensing Unit ×2
MXZ-SM48NAMHZ-U1 48,000 BTU · Condensing Unit ×2
MXZ‐2C20NAHZ3‐U1 18,000 BTU · Vrf Outdoor ×2
Ducts & Piping
Mitsubishi Electric PEFY-P24NMAU-E4MX 100 CFM · Vrf Indoor ×12
1 project · most recent 10/13/2023
Water/Sanitary
FiledStatusContractorScope
10/13/2023Signed-offT.N.T PLBG & HTG, INCWater/Sanitary
2 projects · most recent 09/05/2023
General Wiring
FiledStatusContractorScope
09/05/2023CompleteL J ELEC'L SERV. INC.General Wiring
06/22/2023CompleteL J ELEC'L SERV. INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/23/2023Lighting in dwelling unitsDOYUN KIMenergy_progress
10/23/2023MeteringDOYUN KIMenergy_progress
10/23/2023Fire-Resistance Rated ConstructionDOYUN KIMprogress
10/23/2023FinalDOYUN KIMprogress
10/23/2023Energy Code Compliance InspectionsDOYUN KIMprogress
10/23/2023Mechanical SystemsDOYUN KIMspecial
10/23/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
10/23/2023Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
10/23/2023Heating SystemsDOYUN KIMspecial
10/23/2023Exterior Insulation and Finish Systems (EIFS)DOYUN KIMspecial
06/16/2023Sprinkler SystemsDOYUN KIMspecial
06/16/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
06/08/2023Exterior Insulation and Finish Systems (EIFS)DOYUN KIMspecial
06/08/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
06/08/2023Heating SystemsDOYUN KIMspecial
06/08/2023Mechanical SystemsDOYUN KIMspecial
06/08/2023Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
06/08/2023Energy Code Compliance InspectionsDOYUN KIMprogress
06/08/2023FinalDOYUN KIMprogress
06/08/2023Fire-Resistance Rated ConstructionDOYUN KIMprogress
06/08/2023Lighting in dwelling unitsDOYUN KIMenergy_progress
06/08/2023MeteringDOYUN KIMenergy_progress
02/16/2023MeteringDOYUN KIMenergy_progress
02/16/2023Lighting in dwelling unitsDOYUN KIMenergy_progress
02/16/2023Fire-Resistance Rated ConstructionDOYUN KIMprogress
Latest 25 of 32.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00683855-P1Request digital key ↗
08/27/2026B00683855-I1Request digital key ↗
08/27/2026B00683855-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
04/05/2023320692817Open ↗
02/01/2017320692817Open ↗
01/04/2013320692817Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00683855-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B08012687-I1Open ↗
09/01/2026B08012687-I1Open ↗
08/28/2026B00683855-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00683855-P2Open ↗
08/27/2026B00683855-P1Open ↗
08/27/2026B00683855-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026B00683855-P3Open ↗
08/28/2026B00683855-P3Open ↗
08/25/2026B00683855-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/04/2013320692817Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/04/2013320692817Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/04/2013320692817Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/04/2013320692817Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/13/2026B00683855-P3Open ↗
08/13/2026B00683855-P1Open ↗
08/13/2026B00683855-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
01/04/2013320692817Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
01/04/2013320692817Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00683855-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00683855-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00683855-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00683855-P1Open ↗
08/27/2026B00683855-I1Open ↗
08/27/2026B00683855-P4Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/04/2013320692817Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/10/2023320692817Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00683855-I1Open ↗
▸Inspections & Test Reports4
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
04/10/2023320692817Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/10/2023320692817Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/10/2023320692817Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/10/2023320692817Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
01/04/2013320692817Open ↗
01/04/2013320692817Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/31/2023320692817Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/31/2023320692817Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/04/2013320692817Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/26/2023320692817Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/04/2013320692817Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/27/2026B00683855-P1Open ↗
08/27/2026B00683855-P3Open ↗
08/27/2026B00683855-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00683855-I1Open ↗