Three families
260 PALMETTO STREET
BROOKLYN · BIN 3076633
💬 Discuss this project
1931Year Built
2Stories
C0Building Class
R6Zoning
1,360 sfGross Floor Area
3Units
Rent Stabilized26 Open Violations 25 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 1,700 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 1
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NMI ARCHITECTURE, PLLC306/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor603/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUN YAN, PE7170206/20/2025
NMI ARCHITECTURE, PLLC6825306/20/2025
Building Lifecycle
All (92)Filed (3)Permit Issued (3)Signed Off (2)Violation (45)Inspection (5)Objection (18)Special Inspection (16)
05/21/2026
Violation issued (ECB, open)
Construction
05/05/2026
Violation issued (HPD, closed)
A
02/12/2026
Signed off — Alteration
This project is filed for some cosmetic repair at basement 1st & 2nd floors due to fire, Water & smoke damage, minor layout changes, new ADA bath at 1st floor, no change of use ,egress or occupancy .
B01032741-I1
02/12/2026
Signed off — Alteration
B01032846-I1
11/20/2025
Violation issued (HPD, closed)
I
09/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUN YAN
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
07/14/2025
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
07/02/2025
Objection raised — Scope
07/02/2025
Objection resolved — Addressed
06/20/2025
Filed — Alteration
This project is filed for some cosmetic repair at basement 1st & 2nd floors due to fire, Water & smoke damage, minor layout changes, new ADA bath at 1st floor, no change of use ,egress or occupancy .
B01032741-P1
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
06/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2025
Permit issued — General Construction
B01032741-I1-GC
03/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUN YAN
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
03/26/2025
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
03/07/2025
Permit issued — Plumbing
B01032846-I1-PL
11/27/2024
Violation issued (HPD, closed)
I
11/04/2024
Filed — Alteration
B01032846-I1
09/19/2024
Permit issued — General Construction
B01032741-I1-GC
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Other
07/02/2024
Objection raised — Other
07/02/2024
Objection raised — Fire_Protection
07/02/2024
Objection raised — Other
07/02/2024
Objection raised — Structural
07/02/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Inspections
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Scope
06/19/2024
Filed — Alteration
This project is filed for some cosmetic repair at basement 1st & 2nd floors due to fire, Water & smoke damage, minor layout changes, new ADA bath at 1st floor, no change of use ,egress or occupancy .
B01032741-I1
04/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2024
Violation issued (HPD, closed)
A
03/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2024
Violation issued (HPD, open)
I
02/28/2024
Violation issued (HPD, open)
I
02/28/2024
Violation issued (HPD, open)
I
02/20/2024
Violation issued (HPD, open)
A
02/20/2024
Violation issued (HPD, open)
C
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC05/30/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/07/2025
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC09/19/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/14/2025Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
07/14/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
07/14/2025Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
07/14/2025Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
07/14/2025Fenestration areasNASHAT IBRAHIMenergy_progress
07/14/2025Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
07/14/2025Fenestration air leakageNASHAT IBRAHIMenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
03/26/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
03/26/2025Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
03/26/2025Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
03/26/2025Fenestration air leakageNASHAT IBRAHIMenergy_progress
03/26/2025Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
03/26/2025Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
03/26/2025Fenestration areasNASHAT IBRAHIMenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01032741-I1Request digital key ↗
08/24/2026B01032741-P1Request digital key ↗
08/23/2026B01032846-I1Request digital key ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B01032741-I1Open ↗
09/01/2026B01032741-I1Open ↗
09/01/2026B01032741-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01032741-I1Open ↗
09/01/2026B01032741-I1Open ↗
08/23/2026B01032741-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01032741-I1Open ↗
08/23/2026B01032846-I1Open ↗
08/13/2026B01032741-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B01032741-I1Open ↗
08/23/2026B01032846-I1Open ↗
08/13/2026B01032741-P1Open ↗