← Back
Two family frame
262 PALMETTO STREET
BROOKLYN · BIN 3076634
💬 Discuss this project
1910Year Built
3Stories
B2Building Class
R6Zoning
2,040 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 1,700 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2017$870K—— → —$426/sf building
10/28/2014$400K—Private party → 262 PALMETTO LLC$196/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP106/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCHESE CONSTRUCTION INGeneral Contractor203/21/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573106/12/2024
Building Lifecycle
All (35)Filed (1)Permit Issued (1)Signed Off (1)Violation (6)Inspection (2)Objection (14)Special Inspection (10)
09/04/2025
Signed off — Alteration
RESTORE EX. 2-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION, & MINOR STRUCTURAL WORK. PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01058329-I1
09/03/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/21/2025
Permit issued — Structural
B01058329-I1-GC-CX
07/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2024
Violation issued (ECB, closed)
Construction
07/08/2024
Violation issued (ECB, closed)
Construction
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/26/2024
Objection raised — Other
06/26/2024
Objection raised — Other
06/26/2024
Objection raised — Structural
06/26/2024
Objection raised — Inspections
06/26/2024
Objection raised — Admin
06/26/2024
Objection raised — Other
06/26/2024
Objection raised — Other
06/12/2024
Filed — Alteration
RESTORE EX. 2-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION, & MINOR STRUCTURAL WORK. PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01058329-I1
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Costanza
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
05/29/2024
Special inspection requirement — Final
Nat Costanza
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
05/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
05/29/2024
Special inspection requirement — Fenestration areas
Nat Costanza
05/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
05/29/2024
Special inspection requirement — Insulation placement and R values
Nat Costanza
05/29/2024
Special inspection requirement — Fenestration air leakage
Nat Costanza
05/29/2024
Special inspection requirement — Interior lighting power
Nat Costanza
03/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN02/21/2025
2 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
02/03/2025Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/03/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/29/2024Structural Stability – Alterations of existing buildingsNat Costanzaspecial
05/29/2024Fire-Resistant Penetrations and JointsNat Costanzaspecial
05/29/2024FinalNat Costanzaprogress
05/29/2024Energy Code Compliance InspectionsNat Costanzaprogress
05/29/2024Fire-Resistance Rated ConstructionNat Costanzaprogress
05/29/2024Fenestration areasNat Costanzaenergy_progress
05/29/2024Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
05/29/2024Insulation placement and R valuesNat Costanzaenergy_progress
05/29/2024Fenestration air leakageNat Costanzaenergy_progress
05/29/2024Interior lighting powerNat Costanzaenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01058329-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01058329-I1Open ↗
08/28/2026B01058329-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026B01058329-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01058329-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026B01058329-I1Open ↗