← Back
Three families
95 CORNELIA STREET
BROOKLYN · BIN 3077188
💬 Discuss this project
1905Year Built
3Stories
C0Building Class
R6Zoning
2,814 sfGross Floor Area
3Units
Rent Stabilized139 Open Violations 135 unresolved · 4 paperwork only ▸FDNY Report ↗
Three families · 1,875 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENTON REALTY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.208/21/2026
Building Lifecycle
All (64)Filed (2)Violation (60)Special Inspection (2)
08/21/2026
Filed — Alteration
Cap and Remove plumbing fixtures at cellar level (toilet, lavatory, shower, stove and kitchen sink) and restore to previous lawful condition. No change of use, egress or occupancy.
B01391028-I1
08/21/2026
Filed — Alteration
Proposed work consists of restoring the existing cellar to its prior condition , repairing the existing front entrance stairs and removal interior doors as shown on plans to comply with ECB violations 34323850Y;35414570J;35414572N;35555245P.
B01408907-I1
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/28/2026
Special inspection requirement — Final
05/04/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
04/09/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, closed)
I
11/06/2023
Violation issued (HPD, open)
A
11/06/2023
Violation issued (HPD, open)
A
11/06/2023
Violation issued (HPD, open)
A
11/06/2023
Violation issued (HPD, open)
A
11/06/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
B
07/29/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
B
07/29/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
B
07/29/2023
Violation issued (HPD, open)
A
07/29/2023
Violation issued (HPD, open)
A
03/22/2023
Violation issued (HPD, open)
A
02/02/2023
Violation issued (ECB, open)
Construction
11/18/2022
Violation issued (ECB, open)
Construction
05/19/2022
Violation issued (ECB, open)
Construction
05/17/2022
Violation issued (ECB, open)
Construction
05/17/2022
Violation issued (ECB, open)
Quality of Life
05/17/2022
Violation issued (ECB, open)
Construction
05/17/2022
Violation issued (ECB, open)
Quality of Life
05/17/2022
Violation issued (ECB, open)
Quality of Life
05/17/2022
Violation issued (ECB, open)
Construction
05/17/2022
Violation issued (ECB, open)
Quality of Life
02/23/2022
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
10/29/2019
Violation issued (HPD, closed)
I
10/16/2018
Violation issued (HPD, closed)
I
02/15/2018
Violation issued (HPD, open)
A
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, closed)
C
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, open)
B
02/15/2018
Violation issued (HPD, open)
B
11/21/2017
Violation issued (HPD, closed)
I
08/24/2016
Violation issued (HPD, open)
C
08/24/2016
Violation issued (HPD, open)
C
08/24/2016
Violation issued (HPD, open)
C
05/20/2016
Violation issued (HPD, open)
B
05/20/2016
Violation issued (HPD, open)
B
04/12/2016
Violation issued (HPD, open)
B
Latest 60 of 64 events.
Nothing on file for this building.
1 project · most recent 06/05/2021
General Wiring
FiledStatusContractorScope
06/05/2021Permit IssuedDREAM TEAM ELEC'L CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/28/2026Fire-Resistant Penetrations and Joints—special
05/28/2026Final—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026B01391028-I1Request digital key ↗
08/22/2026B01408907-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026B01391028-I1Open ↗
08/22/2026B01408907-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01391028-I1Open ↗
08/22/2026B01408907-I1Open ↗