ECB08/04/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO FILE A CERTIFICATE OF CORRECTION FOR VIO# 39167495Z, FILE A CERTIFICATE OF CORRECTION$1K due
ECB08/04/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO OBTAIN A PERMIT FOR VIO# 39167496K. NO PERMIT ON FILE FOR INSTALLATION OF METAL GAS PIPE AND PVC PIPES IN KITCHEN AREA WALL, COMPLY WITH COMMIS$2K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
ECB11/18/2025ATOI, I OBSERVED ON THE 3RD FLOOR A GAS LINE NOT CAP, WITH NEW 1-INCH METAL GAS PIPE INSTALLED TO GAS LINE INSIDE THE FLOOR OF KITCHEN. INSIDE THE BATHROOM AN UNKNOWN MALE ADDING NEW PVC PIPES, WITH NEW PVC PIPNothing owed — awaiting certificate of correction
ECB11/18/2025ATOI, I OBSERVED NEW BREAKER BOX WITH NO COVER, ALONG WITH NEW BX-CABLE WIRES RUNNING THROUGHOUT THE 3RD FLOOR APARTMENTS TO NEW LIGHTING FIXTURES AND NEW ELECTRICAL BOXES., OBTAIN PERMITNothing owed — awaiting certificate of correction
ECB11/18/2025ATOI, I OBSERVED NEW FRAMING WORK IN PROGRESS AT THE ENTIRE 3RD FLOOR, NEW 2X4 FRAMING ALONG WITH NEW SHEETROCK FRAMING. BATHROOM WAS FULLY GUTTED OUT., OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1,900 sf lot · 1.89 FAR built · Flood zone X