← Back
Three families
1416 JEFFERSON AVENUE
BROOKLYN · BIN 3078054
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized27 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1416 JEFFERSON LLC · 2,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 4 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Penthouse4p · 3 filings · 20 docs
Floor 43p · 2 filings · 20 docs
Floor 3Under Construction14p · 4 filings · 20 docs
Floor 2Under Construction11p · 4 filings · 20 docs
Floor 1Under Construction12p · 6 filings · 20 docs
CellarUnder Construction20p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1416 JEFFERSON LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/25/2022$1.3M—Private party → 1416 JEFFERSON LLC$394/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING306/01/2026
YAN ENGINEERING PLLC301/31/2023
L & C ASSOCIATES401/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor706/28/2026
A&H EXPRESS PLBG&HTG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING &5699506/01/2026
HSU & ASSOCIATES8025101/18/2023
Building Lifecycle
All (105)Filed (10)Permit Issued (4)Violation (46)Inspection (1)Objection (14)Special Inspection (30)
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Permit issued — Plumbing
B01390786-I1-PL
06/09/2026
Permit issued — General Construction
B01389385-I1-GC
06/01/2026
Filed — Alteration
PLUMBING WORK IN EXISTING 3-STORY, 3-FAMILY RESIDENTIAL BUILDING WITH CELLAR, IN CONJUNCTION WITH ALT-2 APPLICATION # B01389385-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01390786-I1
06/01/2026
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 3-STORY, 3-FAMILY RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
B01389385-I1
05/05/2026
Violation issued (HPD, open)
A
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
04/21/2026
Special inspection requirement — Maintenance information
JICHEN SUN
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT SIQECA
04/20/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT SIQECA
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT SIQECA
04/20/2026
Special inspection requirement — Fenestration areas
ROBERT SIQECA
04/20/2026
Special inspection requirement — Maintenance information
ROBERT SIQECA
04/20/2026
Special inspection requirement — Interior lighting power
ROBERT SIQECA
04/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT SIQECA
04/20/2026
Special inspection requirement — Fenestration air leakage
ROBERT SIQECA
04/20/2026
Special inspection requirement — Metering
ROBERT SIQECA
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT SIQECA
04/20/2026
Special inspection requirement — Insulation placement and R values
ROBERT SIQECA
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
05/09/2023
Violation issued (ECB, closed)
Construction
05/09/2023
Violation issued (ECB, closed)
Construction
05/09/2023
Violation issued (ECB, open)
Unknown
05/09/2023
Violation issued (ECB, closed)
Construction
04/18/2023
Permit issued — Mechanical Systems
B08031761-I1-MS
03/23/2023
Violation issued (HPD, open)
A
02/03/2023
Permit issued — Construction Fence
B08031767-I1-FN
02/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ROBERT SIQECA
02/02/2023
Special inspection requirement — Subgrade Inspections
ROBERT SIQECA
02/02/2023
Special inspection requirement — Concrete - Cast-In-Place
ROBERT SIQECA
02/02/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ROBERT SIQECA
02/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT SIQECA
02/02/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT SIQECA
02/02/2023
Special inspection requirement — Footing and Foundation
ROBERT SIQECA
02/02/2023
Special inspection requirement — Final
ROBERT SIQECA
01/31/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOUNDATION PLANS IN CONJUNCTION WITH ALT-CO JOB #B08006075-L1
B08006075-P1
01/19/2023
Special inspection requirement — Final
01/19/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/19/2023
Special inspection requirement — Subgrade Inspections
01/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/19/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/19/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
01/18/2023
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM IN CONJUNCTION WITH ALTERATION 1 APPLICATION #B08006075-I1. CONVERTING EXISTING THREE (3) DWELLING UNITS TO SIX (6) DWELLING UNITS.
B08031752-I1
01/06/2023
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE FOR ALT FILED UNDER DOB # B08006075-I1
B08031767-I1
01/04/2023
Objection raised — Inspections
01/04/2023
Objection resolved — Addressed
01/04/2023
Objection raised — Energy
01/04/2023
Objection resolved — Addressed
01/04/2023
Objection raised — Scope
01/04/2023
Objection resolved — Addressed
01/03/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOUNDATION PLANS IN CONJUNCTION WITH ALT-CO JOB #B08006075-L1
B08006075-S2
01/03/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOUNDATION PLANS IN CONJUNCTION WITH ALT-CO JOB #B08006075-L1
B08006075-S1
12/07/2022
Filed — Alteration
PROPOSED MECHANICAL SYSTEMS FILED IN CONJUNCTION WITH ALT 1 APPLICATION #B08006075-I1 CONVERTING EXISTING TWO (2) DWELLING UNITS TO SIX(6) DWELLING UNITS.
B08031761-I1
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP06/17/2026
DOB NOWGeneral ConstructionPermit IssuedJ S REMODELING NY INC06/09/2026
DOB NOWMechanical SystemsPermit IssuedJ S REMODELING NY INC04/18/2023
DOB NOWConstruction FencePermit IssuedJ S REMODELING NY INC02/03/2023
1 project · most recent 12/07/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
12/07/2022Permit IssuedJ S REMODELING NY INCAir Conditioning Systems, Heating Systems
1 project · most recent 01/18/2023
FiledStatusContractorScope
01/18/2023———
2 projects · most recent 06/01/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
06/01/2026Permit IssuedA&H EXPRESS PLBG&HTG CORPGas, Water/Sanitary
12/07/2022——Gas, Storm, Water/Sanitary
1 project · most recent 12/20/2025
General Wiring
FiledStatusContractorScope
12/20/2025Permit IssuedATTRACTIVE LIGHTING ELECGeneral Wiring
1 project · most recent 01/31/2023
Steel Masonry
FiledStatusContractorScope
01/31/2023——Steel, Masonry
1 project · most recent 01/06/2023
Fence
FiledStatusContractorScope
01/06/2023Permit IssuedJ S REMODELING NY INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
04/21/2026HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
04/21/2026HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
04/21/2026Energy Code Compliance InspectionsJICHEN SUNprogress
04/21/2026Maintenance informationJICHEN SUNenergy_progress
04/21/2026HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
04/20/2026Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
04/20/2026Fire-Resistant Penetrations and JointsROBERT SIQECAspecial
04/20/2026MeteringROBERT SIQECAenergy_progress
04/20/2026Insulation placement and R valuesROBERT SIQECAenergy_progress
04/20/2026Fenestration and door U-factor and product ratingsROBERT SIQECAenergy_progress
04/20/2026Maintenance informationROBERT SIQECAenergy_progress
04/20/2026Energy Code Compliance InspectionsROBERT SIQECAprogress
04/20/2026Fenestration areasROBERT SIQECAenergy_progress
04/20/2026Interior lighting powerROBERT SIQECAenergy_progress
04/20/2026Fenestration air leakageROBERT SIQECAenergy_progress
04/20/2026Air barrier - visual inspectionROBERT SIQECAenergy_progress
02/02/2023Footing and FoundationROBERT SIQECAprogress
02/02/2023Concrete - Cast-In-PlaceROBERT SIQECAspecial
02/02/2023Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
02/02/2023Excavations - Sheeting, Shoring, and BracingROBERT SIQECAspecial
02/02/2023Subgrade InspectionsROBERT SIQECAspecial
02/02/2023Subsurface Investigations (Borings/Test Pits)ROBERT SIQECAspecial
02/02/2023Construction Operations Influencing Adjacent StructuresROBERT SIQECAspecial
02/02/2023FinalROBERT SIQECAprogress
01/19/2023Construction Operations Influencing Adjacent Structures—special
Latest 25 of 68.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08031747-I1Request digital key ↗
08/28/2026B08031761-I1Request digital key ↗
08/28/2026B08031767-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
01/10/2024340870132Open ↗
12/18/2023340870132Open ↗
11/16/2023340870132Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/29/2024340870132Open ↗
11/14/2023340870132Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/07/2026B01390786-I1Open ↗
09/07/2026B01390786-I1Open ↗
09/01/2026B08006075-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B08006075-I1Open ↗
08/28/2026B08031761-I1Open ↗
08/28/2026B08031761-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08031747-I1Open ↗
08/27/2026B08031752-I1Open ↗
08/27/2026B08006075-P1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2022340870132Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/28/2022340870132Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
01/04/2024340870132Open ↗
10/28/2022340870132Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/14/2023340870132Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B08031747-I1Open ↗
08/27/2026B08031752-I1Open ↗
08/27/2026B08006075-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/13/2026B08006075-P1Open ↗
08/13/2026B08006075-S1Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/29/2024340870132Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/28/2022340870132Open ↗
▸BISADDITIONAL INFORMATION1
11/14/2023340870132Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION5
01/04/2024340870132Open ↗
01/04/2024340870132Open ↗
01/04/2024340870132Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification1
08/27/2026B08006075-I1Open ↗