← Back
Five to six families
470 IRVING AVENUE
BROOKLYN · BIN 3078061
💬 Discuss this project
1901Year Built
4Stories
C2Building Class
R6Zoning
4,256 sfGross Floor Area
6Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Five to six families · Owner of record: 470 GROUP LLC · 1,900 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
StructuralFire Protection
Roof3p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
470 GROUP LLC203/22/2026
JS REMODELING NYC INC903/22/2026
315LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2019$1.1M—Private party → 470 GROUP LLC$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUNG Y. SHIN LLC207/29/2022
L & C ASSOCIATES502/24/2021
GREEN DESIGN103/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES403/21/2026
FIVE BORO CONSULTING EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor707/08/2026
JEM FIRE PREVENTION INCFire Protection207/08/2026
EH PLUMBING & HEATING CORPlumbing207/08/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROMISE CONSULTANTS1412607/29/2022
Building Lifecycle
All (72)Filed (8)Permit Issued (8)Signed Off (5)Violation (19)Objection (2)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
04/10/2024
Violation issued (HPD, closed)
A
03/23/2023
Violation issued (HPD, closed)
A
09/21/2022
Signed off — Alteration
FILING FOR NEW HVAC SPLIT SYSTEM IN CONJUNCTION WITH THE ALT 1 JOB# 321597893. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00212822-S1
08/23/2022
Signed off — Alteration
FILING FOR STRUCTURE WORK TYPE IN CONJUNCTION WITH ALTERATION JOB# 321597893
B00363490-I1
08/23/2022
Signed off — Alteration
FILING FOR NEW HVAC SPLIT SYSTEM IN CONJUNCTION WITH THE ALT 1 JOB# 321597893. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00212822-S2
08/19/2022
Permit issued — Structural
B00363490-I1-ST
08/19/2022
Special inspection requirement — Structural Cold-Formed Steel
JUNG Y SHIN
08/19/2022
Special inspection requirement — Final
JUNG Y SHIN
08/19/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JUNG Y SHIN
08/19/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUNG Y SHIN
08/19/2022
Special inspection requirement — Concrete - Cast-In-Place
JUNG Y SHIN
08/11/2022
Objection resolved — Addressed
08/05/2022
Objection raised — Admin
07/29/2022
Filed — Alteration
FILING FOR STRUCTURE WORK TYPE IN CONJUNCTION WITH ALTERATION JOB# 321597893
B00363490-P3
07/23/2022
Permit issued — Mechanical Systems
B00212822-S2-MS
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
12/29/2021
Permit issued — Plumbing
B00212822-S1-EW-SP
10/01/2021
Permit issued — Sprinklers
B00212822-S1-PL
06/09/2021
Signed off — Alteration
FILING FOR NEW HVAC SPLIT SYSTEM IN CONJUNCTION WITH THE ALT 1 JOB# 321597893. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00212822-I1
05/06/2021
Signed off — Alteration
B00329851-I1
04/09/2021
Violation issued (HPD, closed)
A
02/25/2021
Special inspection requirement — Sprinkler Systems
JUNG Y SHIN
02/25/2021
Special inspection requirement — Energy Code Compliance Inspections
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC insulation and sealing
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC and service water heating equipment
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC and service water heating system controls
JUNG Y SHIN
02/25/2021
Special inspection requirement — Heating Systems
JUNG Y SHIN
02/25/2021
Special inspection requirement — Mechanical Systems
JUNG Y SHIN
02/25/2021
Special inspection requirement — Final
JUNG Y SHIN
02/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUNG Y SHIN
02/25/2021
Special inspection requirement — Energy Code Compliance Inspections
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC and service water heating system controls
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC and service water heating equipment
JUNG Y SHIN
02/25/2021
Special inspection requirement — HVAC insulation and sealing
JUNG Y SHIN
02/24/2021
Filed — Alteration
FILING FOR NEW HVAC SPLIT SYSTEM IN CONJUNCTION WITH THE ALT 1 JOB# 321597893. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00212822-P2
02/23/2021
Filed — Alteration
FILING FOR NEW HVAC SPLIT SYSTEM IN CONJUNCTION WITH THE ALT 1 JOB# 321597893. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00212822-P1
02/19/2021
Special inspection requirement — Sprinkler Systems
JUNG Y SHIN
02/19/2021
Special inspection requirement — Energy Code Compliance Inspections
JUNG Y SHIN
02/19/2021
Special inspection requirement — HVAC and service water heating equipment
JUNG Y SHIN
02/19/2021
Special inspection requirement — HVAC and service water heating system controls
JUNG Y SHIN
02/19/2021
Special inspection requirement — HVAC insulation and sealing
JUNG Y SHIN
02/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUNG Y SHIN
02/19/2021
Special inspection requirement — Heating Systems
JUNG Y SHIN
02/19/2021
Special inspection requirement — Mechanical Systems
JUNG Y SHIN
02/19/2021
Special inspection requirement — Energy Code Compliance Inspections
JUNG Y SHIN
02/19/2021
Special inspection requirement — Final
JUNG Y SHIN
02/19/2021
Special inspection requirement — HVAC and service water heating equipment
JUNG Y SHIN
02/19/2021
Special inspection requirement — HVAC insulation and sealing
JUNG Y SHIN
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/11/2021
Permit issued — Plumbing
B00212822-S1-EW-SP
01/29/2021
Filed — Alteration
FILING FOR STRUCTURE WORK TYPE IN CONJUNCTION WITH ALTERATION JOB# 321597893
B00363490-I1
11/25/2020
Violation issued (ECB, closed)
Construction
09/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/06/2020
Violation issued (ECB, closed)
Construction
07/06/2020
Violation issued (ECB, closed)
Site Safety
06/25/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJ S REMODELING NY INC08/19/2022
DOB NOWMechanical SystemsSigned-offJ S REMODELING NY INC07/23/2022
DOB NOWPlumbingSigned-offJEM FIRE PREVENTION INC12/29/2021
DOB NOWSprinklersSigned-offEH PLUMBING & HEATING COR10/01/2021
DOB NOWPlumbingSigned-offJEM FIRE PREVENTION INC02/11/2021
DOB NOWSprinklersSigned-offEH PLUMBING & HEATING COR06/22/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/12/2020
DOB NOWConstruction FenceSigned-offJ S REMODELING NY INC01/31/2020
BIS—ISSUEDJ S REMODELING NY INC06/03/2020
BIS—ISSUEDJ S REMODELING NY INC02/18/2020
BIS—ISSUEDJ S REMODELING NY INC02/18/2020
2 projects · most recent 07/28/2021
General Wiring HVAC Wiring
FiledStatusContractorScope
07/28/2021CompleteLINTECH ELECTRIC, INCGeneral Wiring, HVAC Wiring
03/06/2020CompleteELPO ELECTRICAL CONTG INC—
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/19/2022Structural Cold-Formed SteelJUNG Y SHINspecial
08/19/2022FinalJUNG Y SHINprogress
08/19/2022Structural Steel - High Strength BoltingJUNG Y SHINspecial
08/19/2022Structural Stability – Alterations of existing buildingsJUNG Y SHINspecial
08/19/2022Concrete - Cast-In-PlaceJUNG Y SHINspecial
02/25/2021Sprinkler SystemsJUNG Y SHINspecial
02/25/2021Energy Code Compliance InspectionsJUNG Y SHINprogress
02/25/2021HVAC insulation and sealing JUNG Y SHINenergy_progress
02/25/2021HVAC and service water heating equipment JUNG Y SHINenergy_progress
02/25/2021HVAC and service water heating system controls JUNG Y SHINenergy_progress
02/25/2021Heating SystemsJUNG Y SHINspecial
02/25/2021Mechanical SystemsJUNG Y SHINspecial
02/25/2021FinalJUNG Y SHINprogress
02/25/2021Fire-Resistant Penetrations and JointsJUNG Y SHINspecial
02/25/2021Energy Code Compliance InspectionsJUNG Y SHINprogress
02/25/2021HVAC and service water heating system controls JUNG Y SHINenergy_progress
02/25/2021HVAC and service water heating equipment JUNG Y SHINenergy_progress
02/25/2021HVAC insulation and sealing JUNG Y SHINenergy_progress
02/19/2021Sprinkler SystemsJUNG Y SHINspecial
02/19/2021Energy Code Compliance InspectionsJUNG Y SHINprogress
02/19/2021HVAC and service water heating equipment JUNG Y SHINenergy_progress
02/19/2021HVAC and service water heating system controls JUNG Y SHINenergy_progress
02/19/2021HVAC insulation and sealing JUNG Y SHINenergy_progress
02/19/2021Fire-Resistant Penetrations and JointsJUNG Y SHINspecial
02/19/2021Heating SystemsJUNG Y SHINspecial
Latest 25 of 32.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00212822-S2Request digital key ↗
08/15/2026B00212822-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00212822-S1Request digital key ↗
08/15/2026B00212822-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00212822-S1Request digital key ↗
08/15/2026B00212822-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00329851-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00212822-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00363490-P3Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION13
04/28/2022321597893Open ↗
02/22/2021321597893Open ↗
02/04/2021321597893Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/24/2020340711386Open ↗
12/26/2019340711386Open ↗
▸BISWORK PERMIT APPLICATION2
02/21/2020321597893Open ↗
02/21/2020321597893Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/20/2021321597893Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/21/2020321597893Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
01/17/2020321597893Open ↗
01/17/2020321597893Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/19/2019321597893Open ↗
▸BISVERIFY TAX LOT1
03/31/2022321597893Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/16/2019321597893Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/19/2022321597893Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/19/2019321597893Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026B00212822-S1Open ↗
08/29/2026B00212822-S1Open ↗
08/29/2026B00212822-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00363490-P3Open ↗
08/13/2026B00329851-I1Open ↗
08/13/2026B00212822-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026B00212822-S1Open ↗
08/28/2026B00363490-I1Open ↗
08/28/2026B00363490-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/21/2020321597893Open ↗
02/21/2020321597893Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/26/2019340711386Open ↗
▸Trade Schedules & Equipment5
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/19/2022321597893Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/31/2022321597893Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/31/2022321597893Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
11/01/2022321597893Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
01/17/2020321597893Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
11/02/2022321597893Open ↗
12/26/2019340711386Open ↗
10/16/2019321597893Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/31/2022321597893Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/21/2020321597893Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/17/2020321597893Open ↗
▸BISSTREET TREE SIGNOFF1
11/01/2022321597893Open ↗
▸BISSTREET TREES SITE PLAN1
01/24/2020340711386Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00329851-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00363490-I1Open ↗
08/13/2026B00212822-S2Open ↗
08/13/2026B00212822-S1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/17/2020321597893Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/17/2020321597893Open ↗
10/16/2019321597893Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/31/2022321597893Open ↗
▸BISINTERIOR LIGHTING POWER1
03/31/2022321597893Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/31/2022321597893Open ↗
▸BISFENESTRATION AREAS1
03/31/2022321597893Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/31/2022321597893Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/21/2020321597893Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/31/2022321597893Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/31/2022321597893Open ↗
▸BISEXTERIOR LIGHTING POWER1
03/31/2022321597893Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/31/2022321597893Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/04/2021321597893Open ↗
02/10/2020321597893Open ↗
01/17/2020321597893Open ↗
Showing 3 of 7 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
03/31/2022321597893Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/06/2022321597893Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/31/2022321597893Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/31/2022321597893Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/31/2022321597893Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/31/2022321597893Open ↗
▸BISSOIL REPORT1
01/17/2020321597893Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
04/28/2022321597893Open ↗
01/02/2020321597893Open ↗
12/17/2019321597893Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
10/19/2022321597893Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/17/2020321597893Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
01/17/2020321597893Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2022321597893Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/21/2020321597893Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION10
11/02/2022321597893Open ↗
05/05/2022321597893Open ↗
04/12/2022321597893Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET2
01/17/2020321597893Open ↗
10/22/2019321597893Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/26/2019340711386Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/26/2019340711386Open ↗
▸Other Documents3
▸BISMAINTENANCE INFORMATION1
03/31/2022321597893Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/26/2019340711386Open ↗
▸BISPLOT DIAGRAM1
10/17/2019321597893Open ↗