← Back
Three families
279 WEIRFIELD STREET
BROOKLYN · BIN 3078363
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R6Zoning
2,850 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · 1,900 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction53p · 3 filings · 20 docs
Floor 2Under Construction64p · 4 filings · 20 docs
Floor 1Under Construction65p · 4 filings · 20 docs
CellarUnder Construction53p · 3 filings · 20 docs
Sub-BasementUnder Construction58p · 3 filings · 20 docs
1 job · most recent 01/15/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/15/2025Permit IssuedINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 job · most recent 08/07/2024
General Wiring
FiledStatusContractorScope
08/07/2024Permit IssuedL J ELEC'L SERV. INC.General Wiring
1 job · most recent 02/18/2025
Concrete Wood
FiledStatusContractorScope
02/18/2025Permit IssuedINSTYLE HOME RENOVATIONSConcrete, Wood
Building Lifecycle
All (67)Filed (9)Permit Issued (5)Violation (11)Inspection (8)Objection (4)Special Inspection (30)
07/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/27/2026
Permit issued — Plumbing
B00821569-I1-PL
11/24/2025
Violation issued (HPD, open)
I
11/10/2025
Special inspection requirement — Post-installed Anchors
Alex Schwartz
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alex Schwartz
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alex Schwartz
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alex Schwartz
11/10/2025
Special inspection requirement — Maintenance information
Alex Schwartz
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
11/06/2025
Objection resolved — Addressed
02/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
02/19/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
02/19/2025
Special inspection requirement — Concrete - Cast-In-Place
ALEKSANDR LEVIN
02/19/2025
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
02/19/2025
Special inspection requirement — Structural Wood Frame
ALEKSANDR LEVIN
02/19/2025
Special inspection requirement — Final
ALEKSANDR LEVIN
02/18/2025
Filed — Alteration
MINOR ALTERATION OF EXISTING 2-FAMILY BUILDING TO INCLUDE STRUCTURAL REINFORCEMENT OF EXISTING WOOD JOISTS FOR PARTIAL RELIEVING WALL REMOVALS, STRUCTURAL REPAIRS OF DAMAGED WOOD FRAMING, AND NEW ELEVATED EXTERIOR WOODEN DECK AT REAR.
B00821605-P1
02/07/2025
Filed — Alteration
B08040523-P1
01/23/2025
Objection raised — Scope
01/16/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
01/15/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE CELLAR,BASEMENT, FIRST AND SECOND FLOORS AND ROOF AT THE ADDRESS NOTED.
B00821569-P2
01/13/2025
Special inspection requirement — Maintenance information
Alex Schwartz
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
01/13/2025
Special inspection requirement — Post-installed Anchors
Alex Schwartz
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alex Schwartz
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alex Schwartz
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alex Schwartz
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2024
Violation issued (HPD, open)
I
11/29/2024
Permit issued — Plumbing
B00821569-I1-PL
08/07/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Structural
05/14/2024
Filed — Alteration
FILING HEREWITH MECHANICAL WORK FOR THEBUILDING AT THE ADDRESS LISTED. INCLUDES NEW TOILET AND LAUNDRY EXHAUST SYSTEMS. NATURAL VENTILATION PROVIDED, REFER TO OT APPLICATIONDRAWINGS (ARCHITECTURAL).
B00821502-P1
05/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alex Schwartz
05/14/2024
Special inspection requirement — Final
Alex Schwartz
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
05/14/2024
Special inspection requirement — Electrical motors and elevators
Alex Schwartz
05/14/2024
Special inspection requirement — Shutoff dampers
Alex Schwartz
05/14/2024
Special inspection requirement — Maintenance information
Alex Schwartz
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
05/14/2024
Special inspection requirement — Mechanical Systems
Alex Schwartz
05/14/2024
Special inspection requirement — Post-installed Anchors
Alex Schwartz
05/10/2024
Filed — Alteration
FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE CELLAR,BASEMENT, FIRST AND SECOND FLOORS AND ROOF AT THE ADDRESS NOTED.
B00821569-P1
03/06/2024
Permit issued — Mechanical Systems
B00821502-I1-MS
02/20/2024
Permit issued — Structural
B00821605-I1-ST
01/24/2024
Permit issued — General Construction
B08040523-I1-GC
11/28/2023
Violation issued (HPD, open)
I
04/13/2023
Filed — Alteration
MINOR ALTERATION OF EXISTING 2-FAMILY BUILDING TO INCLUDE STRUCTURAL REINFORCEMENT OF EXISTING WOOD JOISTS FOR PARTIAL RELIEVING WALL REMOVALS, STRUCTURAL REPAIRS OF DAMAGED WOOD FRAMING, AND NEW ELEVATED EXTERIOR WOODEN DECK AT REAR.
B00821605-I1
02/17/2023
Filed — Alteration
FILING HEREWITH MECHANICAL WORK FOR THEBUILDING AT THE ADDRESS LISTED. INCLUDES NEW TOILET AND LAUNDRY EXHAUST SYSTEMS. NATURAL VENTILATION PROVIDED, REFER TO OT APPLICATIONDRAWINGS (ARCHITECTURAL).
B00821502-I1
02/17/2023
Filed — Alteration
FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE CELLAR,BASEMENT, FIRST AND SECOND FLOORS AND ROOF AT THE ADDRESS NOTED.
B00821569-I1
11/23/2022
Filed — Alteration
B08040523-I1
11/17/2022
Violation issued (HPD, open)
I
Latest 60 of 67 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2022$1.4M—Private party → Private party$479/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NONE202/18/2025
CO ADAPTIVE ARCHITECTURE PLLC202/07/2025
ABS ENGINEERING, PLLC501/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CO ADAPTIVE ARCHITECTURE, PLLC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INSTYLE HOME RENOVATIONSGeneral Contractor704/09/2026
INFINITI ESC PLUMBING CORPlumbing207/08/2026
SHAJI CHERIANElectrical103/21/2026
Y&L NY INTERIORS INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666402/18/2025
ABS ENGINEERING, PLLC4835501/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR01/27/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR11/29/2024
DOB NOWMechanical SystemsSigned-offINSTYLE HOME RENOVATIONS03/06/2024
DOB NOWStructuralPermit IssuedINSTYLE HOME RENOVATIONS02/20/2024
DOB NOWGeneral ConstructionPermit IssuedINSTYLE HOME RENOVATIONS01/24/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
11/10/2025Post-installed AnchorsAlex Schwartzspecial
11/10/2025HVAC-R and service water heating system controlsAlex Schwartzenergy_progress
11/10/2025HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
11/10/2025HVAC-R and service water heating equipmentAlex Schwartzenergy_progress
11/10/2025Maintenance informationAlex Schwartzenergy_progress
11/10/2025Energy Code Compliance InspectionsAlex Schwartzprogress
11/10/2025Fire-Resistant Penetrations and JointsAlex Schwartzspecial
02/19/2025Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
02/19/2025Construction Utilizing CLT or SCL, Type IV—special
02/19/2025Concrete - Cast-In-PlaceALEKSANDR LEVINspecial
02/19/2025Post-installed AnchorsALEKSANDR LEVINspecial
02/19/2025Structural Wood FrameALEKSANDR LEVINprogress
02/19/2025FinalALEKSANDR LEVINprogress
01/16/2025Construction Utilizing CLT or SCL, Type IV—special
01/13/2025Maintenance informationAlex Schwartzenergy_progress
01/13/2025Fire-Resistant Penetrations and JointsAlex Schwartzspecial
01/13/2025Post-installed AnchorsAlex Schwartzspecial
01/13/2025Energy Code Compliance InspectionsAlex Schwartzprogress
01/13/2025HVAC-R and service water heating equipmentAlex Schwartzenergy_progress
01/13/2025HVAC-R and service water heating system controlsAlex Schwartzenergy_progress
01/13/2025HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
05/14/2024HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
05/14/2024FinalAlex Schwartzprogress
05/14/2024Energy Code Compliance InspectionsAlex Schwartzprogress
05/14/2024Electrical motors and elevatorsAlex Schwartzenergy_progress
Latest 25 of 44.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B00821502-I1Request digital key ↗
08/23/2026B00821569-P2Request digital key ↗
08/23/2026B00821569-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/24/2019322008965Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00821569-P2Open ↗
09/02/2026B00821569-P2Open ↗
08/28/2026B00821569-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00821502-I1Open ↗
08/27/2026B00821502-P1Open ↗
08/23/2026B00821569-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00821569-P2Open ↗
08/28/2026B00821569-I1Open ↗
08/25/2026B00821569-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/24/2019322008965Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/24/2019322008965Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026B00821502-I1Open ↗
08/22/2026B08040523-I1Open ↗
08/13/2026B00821569-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/24/2019322008965Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/24/2019322008965Open ↗