← Back
Three families
226 WEIRFIELD STREET
BROOKLYN · BIN 3078624
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6Zoning
2,880 sfGross Floor Area
3Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 226 WEIRFIELD HOLDINGS LLC · 2,000 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof1p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
226 WEIRFIELD HOLDINGS LLC103/22/2026
1189 JEFFERSON603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/08/2022$425K—Private party → 226 WEIRFIELD HOLDINGS LLC$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC302/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC203/21/2026
CAVALRY MANAGEMENT203/21/2026
Building Lifecycle
All (38)Filed (3)Violation (18)Special Inspection (17)
05/06/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/12/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
03/27/2023
Violation issued (HPD, open)
A
02/08/2023
Filed — Alteration
INTERIOR RENOVATION TO EXISTING 3 FAMILY BUILDING. NO CHANGE OFUSE, EGRESS OR OCCUPANCY
B08014624-I1
02/08/2023
Filed — Alteration
Plumbing and sprinkler filed herein in conjunction with ALT 2 B08014624.
B08014747-I1
02/07/2023
Filed — Alteration
B08014767-I1
01/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
01/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
01/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/10/2022
Violation issued (HPD, open)
I
10/24/2022
Special inspection requirement — Lighting in dwelling units
10/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
10/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2022
Special inspection requirement — Maintenance information
10/24/2022
Special inspection requirement — Metering
10/24/2022
Special inspection requirement — Interior lighting power
10/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
10/24/2022
Special inspection requirement — Lighting controls
10/24/2022
Special inspection requirement — Fenestration air leakage
10/24/2022
Special inspection requirement — Fenestration areas
10/20/2022
Special inspection requirement — Final
10/03/2022
Special inspection requirement — Sprinkler Systems
03/02/2022
Violation issued (HPD, open)
I
03/02/2022
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, open)
I
04/13/2021
Violation issued (HPD, open)
A
10/31/2019
Violation issued (HPD, open)
I
10/22/2018
Violation issued (HPD, open)
I
11/30/2017
Violation issued (HPD, open)
I
11/16/2016
Violation issued (HPD, open)
I
05/19/1999
Violation issued (FDNY_ORDER, closed)
03/30/1994
Violation issued (FDNY_NOV, closed)
Nothing on file for this building.
1 project · most recent 02/08/2023
FiledStatusContractorScope
02/08/2023——46 heads
1 project · most recent 02/08/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/08/2023——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/26/2023HVAC-R and service water heating system controls—energy_progress
01/26/2023HVAC-R and service water piping design and insulation—energy_progress
01/26/2023Energy Code Compliance Inspections—progress
01/26/2023HVAC-R and service water heating equipment—energy_progress
01/25/2023Fire-Resistant Penetrations and Joints—special
10/24/2022Lighting in dwelling units—energy_progress
10/24/2022Fenestration and door U-factor and product ratings—energy_progress
10/24/2022Fire-Resistant Penetrations and Joints—special
10/24/2022Maintenance information—energy_progress
10/24/2022Metering—energy_progress
10/24/2022Interior lighting power—energy_progress
10/24/2022Fire-Resistance Rated Construction—progress
10/24/2022Lighting controls—energy_progress
10/24/2022Fenestration air leakage—energy_progress
10/24/2022Fenestration areas—energy_progress
10/20/2022Final—progress
10/03/2022Sprinkler Systems—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B08014767-I1Request digital key ↗
08/27/2026B08014624-I1Request digital key ↗
08/27/2026B08014747-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B08014767-I1Open ↗
08/13/2026B08014747-I1Open ↗
08/13/2026B08014624-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B08014767-I1Open ↗
08/13/2026B08014747-I1Open ↗
08/13/2026B08014624-I1Open ↗