← Back
Two family frame
83 COOPER STREET
BROOKLYN · BIN 3079685
💬 Discuss this project
1899Year Built
3Stories
B2Building Class
R6Zoning
2,229 sfGross Floor Area
2Units
Rent Stabilized17 Open Violations ▸FDNY Report ↗
Two family frame · Owner of record: BESHEFA 2021 LLC · 1,650 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction28p · 2 filings · 20 docs
Floor 1Under Construction26p · 2 filings · 20 docs
CellarUnder Construction29p · 2 filings · 20 docs
BasementUnder Construction32p · 1 filing · 20 docs
Sub-Basement2p · 1 filing · 7 docs
1 job · most recent 05/21/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2026Permit IssuedRECORD GROUP INCAir Conditioning Systems
Cooling
Daikin 3MXL24WMVJU9 24,000 BTU · Condensing Unit ×8
2 jobs · most recent 05/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/21/2026Permit IssuedPLUMB-IT MECHANICAL INCGas, Water/Sanitary
07/08/2025Permit IssuedLG ELITE PLUMBING INCGas, Water/Sanitary
3 jobs · most recent 08/13/2025
General Wiring
FiledStatusContractorScope
08/13/2025Permit IssuedTRINCITY ELECTRIC, INCGeneral Wiring
07/16/2025Permit IssuedTRINCITY ELECTRIC, INC—
02/27/2020Permit IssuedINDY ELECTRIC CORP.2 meters, 2 new_meters
1 job · most recent 05/21/2026
Steel Wood
FiledStatusContractorScope
05/21/2026Permit IssuedPLUMB-IT MECHANICAL INCSteel, Wood
Building Lifecycle
All (115)Filed (9)Permit Issued (9)Violation (24)Objection (43)Special Inspection (30)
08/10/2026
Objection resolved — Resolved
08/03/2026
Objection raised — Other
07/14/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Scope
06/12/2026
Special inspection requirement — Mechanical Systems
William Alicea
06/12/2026
Special inspection requirement — Maintenance information
William Alicea
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
06/12/2026
Special inspection requirement — Final
William Alicea
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
06/11/2026
Objection raised — Scope
05/21/2026
Filed — Alteration CO
INTERIOR AND EXTERIOR RENOVATION OF EXSTING 2-FAMILY, 2 STORY BUILDING WITH BASEMENT AND CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY. ADDRESS VIOLATIONS 39163865Z AND 39163864R.
B01236965-P4
05/21/2026
Filed — Alteration CO
INTERIOR AND EXTERIOR RENOVATION OF EXSTING 2-FAMILY, 2 STORY BUILDING WITH BASEMENT AND CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY. ADDRESS VIOLATIONS 39163865Z AND 39163864R.
B01236965-P2
05/21/2026
Filed — Alteration CO
INTERIOR AND EXTERIOR RENOVATION OF EXSTING 2-FAMILY, 2 STORY BUILDING WITH BASEMENT AND CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY. ADDRESS VIOLATIONS 39163865Z AND 39163864R.
B01236965-P3
05/18/2026
Special inspection requirement — Maintenance information
William Alicea
05/18/2026
Special inspection requirement — Mechanical Systems
William Alicea
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
05/18/2026
Special inspection requirement — Final
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
05/18/2026
Special inspection requirement — Maintenance information
William Alicea
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/28/2026
Permit issued — Plumbing
B01236965-S4-PL
04/14/2026
Permit issued — Structural
B01236965-I1-GC-CX
03/27/2026
Permit issued — General Construction
B01236965-I1-GC-CX
02/24/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
12/16/2025
Objection raised — Structural
12/16/2025
Objection raised — Structural
12/16/2025
Objection raised — Other
12/10/2025
Permit issued — Mechanical Systems
B01236965-S3-MS
12/02/2025
Filed — Alteration CO
INTERIOR AND EXTERIOR RENOVATION OF EXSTING 2-FAMILY, 2 STORY BUILDING WITH BASEMENT AND CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY. ADDRESS VIOLATIONS 39163865Z AND 39163864R.
B01236965-P1
11/24/2025
Violation issued (HPD, open)
I
11/20/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
10/17/2025
Permit issued — Structural
B01236965-I1-GC-CX
10/16/2025
Violation issued (ECB, closed)
Site Safety
10/16/2025
Violation issued (ECB, closed)
Construction
10/02/2025
Objection raised — Zoning
09/29/2025
Permit issued — General Construction
B01236965-I1-GC-CX
09/22/2025
Permit issued — Plumbing
B01236965-S4-PL
09/18/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Other
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Cost
08/21/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Mechanical
Latest 60 of 115 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMPACT BUILDERS203/22/2026
BESHEFA 2021 LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2025$15K—ROSENBERG & FERRARI HOLDING, INC → Private party$7/sf building
02/27/2025$25K—ALL BORO REALTY ENTERPRISES, INC → Private party$11/sf building
02/27/2025$975K—Private party → BESHEFA 2021 LLC$437/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC705/21/2026
CKL ENGINEERING, P.C.207/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMPACT BUILDERS CORPGeneral Contractor507/08/2026
RECORD GROUP INCGeneral Contractor207/08/2026
LG ELITE PLUMBING INCPlumbing207/08/2026
CAVALRY GC&P LLCGeneral Contractor104/09/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605205/21/2026
IP CONCRETE TESTING AND I6252305/21/2026
WORLD DESIGN ARCHITECTURE9323705/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLUMB-IT MECHANICAL INC04/28/2026
DOB NOWStructuralPermit IssuedRECORD GROUP INC04/14/2026
DOB NOWGeneral ConstructionPermit IssuedCAVALRY GC&P LLC03/27/2026
DOB NOWMechanical SystemsPermit IssuedIMPACT BUILDERS CORP12/10/2025
DOB NOWStructuralPermit IssuedRECORD GROUP INC10/17/2025
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP09/29/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC09/22/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC08/04/2025
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP06/26/2025
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/12/2026Mechanical SystemsWilliam Aliceaspecial
06/12/2026Maintenance informationWilliam Aliceaenergy_progress
06/12/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
06/12/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
06/12/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
06/12/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
06/12/2026FinalWilliam Aliceaprogress
06/12/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
06/12/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/18/2026Maintenance informationWilliam Aliceaenergy_progress
05/18/2026Mechanical SystemsWilliam Aliceaspecial
05/18/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
05/18/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
05/18/2026FinalWilliam Aliceaprogress
05/18/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
05/18/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
05/18/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/18/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
05/18/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
05/18/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
05/18/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
05/18/2026Maintenance informationWilliam Aliceaenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
07/10/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
Latest 25 of 31.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026B01236965-P4Request digital key ↗
08/21/2026B01236965-I1Request digital key ↗
08/21/2026B01236965-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026B01239283-I1Open ↗
09/23/2026B01236965-S3Open ↗
09/23/2026B01236965-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026B01239283-S1Open ↗
08/21/2026B01239283-I1Open ↗
08/16/2026B01236965-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01236965-S3Open ↗
09/01/2026B01236965-S4Open ↗
08/24/2026B01236965-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/16/2026B01236965-P2Open ↗
08/13/2026B01236965-P1Open ↗
08/13/2026B01236965-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026B01239283-S1Open ↗
08/21/2026B01239283-I1Open ↗
08/16/2026B01236965-P3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/16/2026B01236965-P2Open ↗
08/16/2026B01236965-P1Open ↗
08/16/2026B01236965-I1Open ↗