← Back
Factory, light manufacturing
80 CONWAY STREET
BROOKLYN · BIN 3080569
💬 Discuss this project
1967Year Built
1Stories
F5Building Class
M1-1Zoning
17,010 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: CONWAYPER LLC · 20,550 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof3p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/19/2021$4.6M—68 CONWAY STREET, LLC → CONWAYPER LLC$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CARUSONE & CHERRES ARCHITECTS, LLC503/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JCBP DESIGN STUDIOS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDSON HTNG & COOLING LLCGeneral Contractor107/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CARUSONE & CHERRES ARCHIT6166303/28/2024
J&R DESIGN AND INSPECTION6637204/14/2023
Building Lifecycle
All (10)Filed (5)Permit Issued (2)Signed Off (2)Violation (1)
04/04/2024
Signed off — Alteration
To replace existing Rooftop unit as per plans.
B08033764-I1
04/01/2024
Signed off — Alteration
PROPOSED INSTALLATION OF 5 GAS SPACE HEATERS AT 1ST FLOOR.
B08033981-I1
03/28/2024
Filed — Alteration
To replace existing Rooftop unit as per plans.
B08033764-P2
04/14/2023
Filed — Alteration
PROPOSED INSTALLATION OF 5 GAS SPACE HEATERS AT 1ST FLOOR.
B08033981-P1
03/06/2023
Permit issued — Plumbing
B08033981-I1-PL
02/21/2023
Filed — Alteration
To replace existing Rooftop unit as per plans.
B08033764-P1
01/19/2023
Permit issued — Mechanical Systems
B08033764-I1-MS
11/21/2022
Filed — Alteration
To replace existing Rooftop unit as per plans.
B08033764-I1
11/21/2022
Filed — Alteration
PROPOSED INSTALLATION OF 5 GAS SPACE HEATERS AT 1ST FLOOR.
B08033981-I1
02/08/1989
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOE PARZIALE PLUMBING CO03/06/2023
DOB NOWMechanical SystemsSigned-offEDSON HTNG & COOLING LLC01/19/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/02/2024Mechanical SystemsJORGE CHERRESspecial
04/02/2024HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
04/02/2024HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
04/02/2024HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
04/02/2024FinalJORGE CHERRESprogress
04/02/2024Energy Code Compliance InspectionsJORGE CHERRESprogress
03/18/2024HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
03/18/2024Mechanical SystemsJORGE CHERRESspecial
03/18/2024Energy Code Compliance InspectionsJORGE CHERRESprogress
03/18/2024FinalJORGE CHERRESprogress
03/18/2024HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
03/18/2024HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
04/17/2023Energy Code Compliance InspectionsJORGE CHERRESprogress
04/17/2023HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
04/17/2023HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
04/17/2023HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
04/17/2023Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
02/16/2023HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
02/16/2023Mechanical SystemsJORGE CHERRESspecial
02/16/2023HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
02/16/2023HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
02/16/2023FinalJORGE CHERRESprogress
02/16/2023Energy Code Compliance InspectionsJORGE CHERRESprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B08033981-P1Request digital key ↗
08/27/2026B08033764-I1Request digital key ↗
08/27/2026B08033764-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026B08033764-I1Open ↗
09/01/2026B08033764-I1Open ↗
09/01/2026B08033764-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B08033981-I1Open ↗
08/27/2026B08033764-I1Open ↗
08/27/2026B08033764-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B08033764-I1Open ↗
09/01/2026B08033764-P1Open ↗
08/30/2026B08033764-P2Open ↗
Showing 3 of 4 on file for this type