← Back
Playground
1550 EAST NEW YORK AVENUE
BROOKLYN · BIN 3080660
💬 Discuss this project
0Year Built
—Stories
Q2Building Class
PARKZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Playground · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 43,560 sf lot · 0 FAR built · Flood zone X
Locations of Work
General
Floor 11p · 1 filing · 20 docs
Cellar2p · 2 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (33)Filed (7)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)Special Inspection (18)
06/23/2022
Signed off — Alteration
B00494450-I1
06/18/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/16/2022
Signed off — Alteration
The proposed work will manage stormwater runoff on the property through the use of an underground storage system located under the basketball court in Howard Playground. General construction work to be done as per plans filed.
B00502674-I1
04/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/11/2022
Violation issued (ECB, closed)
Construction
12/17/2021
Special inspection requirement — Final
Joseph Menzer
12/17/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KATHLEEN HAND
12/16/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of an underground storage system located under the basketball court in Howard Playground. General construction work to be done as per plans filed.
B00502674-P5
09/24/2021
Permit issued — General Construction
B00502674-I1-GC
09/09/2021
Permit issued — Plumbing
B00494450-I1-PL
08/11/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KATHLEEN HAND
08/10/2021
Filed — Alteration
B00494450-P2
08/10/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of an underground storage system located under the basketball court in Howard Playground. General construction work to be done as per plans filed.
B00502674-P2
08/02/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NELSON LOPEZ
08/02/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
08/02/2021
Special inspection requirement — Final
08/02/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NELSON LOPEZ
07/27/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of an underground storage system located under the basketball court in Howard Playground. General construction work to be done as per plans filed.
B00502674-P1
07/27/2021
Filed — Alteration
B00494450-P1
07/26/2021
Special inspection requirement — Subgrade Inspections
07/26/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/26/2021
Special inspection requirement — Energy Code Compliance Inspections
07/26/2021
Special inspection requirement — Final
07/26/2021
Special inspection requirement — Concrete - Precast
07/26/2021
Special inspection requirement — Concrete - Cast-In-Place
07/26/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
07/26/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/26/2021
Special inspection requirement — Energy Code Compliance Inspections
07/26/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
07/26/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/14/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of an underground storage system located under the basketball court in Howard Playground. General construction work to be done as per plans filed.
B00502674-I1
04/01/2021
Filed — Alteration
B00494450-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE RBA GROUP712/16/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEBORAH BRADLEY CONS & MGGeneral Contractor203/21/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400512/16/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDEBORAH BRADLEY CONS & MG09/24/2021
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC09/09/2021
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/18/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/17/2021FinalJoseph Menzerprogress
12/17/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKATHLEEN HANDspecial
08/11/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKATHLEEN HANDspecial
08/02/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNELSON LOPEZspecial
08/02/2021Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
08/02/2021Final—progress
08/02/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNELSON LOPEZspecial
07/26/2021Subgrade Inspections—special
07/26/2021Subsurface Investigations (Borings/Test Pits)—special
07/26/2021Energy Code Compliance Inspections—progress
07/26/2021Final—progress
07/26/2021Concrete - Precast—special
07/26/2021Concrete - Cast-In-Place—special
07/26/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
07/26/2021Subsurface Investigations (Borings/Test Pits)—special
07/26/2021Energy Code Compliance Inspections—progress
07/26/2021Alternative Materials - OTCR Buildings Bulletin Number—special
07/26/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00494450-P2Request digital key ↗
09/01/2026B00494450-I1Request digital key ↗
09/01/2026B00494450-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00494450-I1Open ↗
09/01/2026B00494450-P1Open ↗
09/01/2026B00494450-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00502674-P2Open ↗
08/24/2026B00494450-I1Open ↗
08/22/2026B00502674-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B00502674-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT7
09/01/2026B00502674-P2Open ↗
09/01/2026B00502674-P1Open ↗
09/01/2026B00502674-I1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/01/2026B00494450-I1Open ↗
09/01/2026B00494450-P1Open ↗
09/01/2026B00494450-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
09/01/2026B00502674-P2Open ↗
09/01/2026B00502674-P1Open ↗
09/01/2026B00502674-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00502674-I1Open ↗
08/13/2026B00494450-I1Open ↗