← Back
Primarily 2 family with 1 store or office
1602 PITKIN AVENUE
BROOKLYN · BIN 3080992
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
C4-3Zoning
4,040 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 104-52 164 LLC · 1,858 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 323p · 1 filing · 20 docs
Floor 225p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
1 job · most recent 04/27/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/27/2024Permit IssuedSTELLAR INDUSTRIES INCHeating Systems
Cooling
Daikin 4MXS36RMVJUA 4MXS36RMVJUA 36,000 BTU · Split System ×12
Heating
Daikin 4MXS36RMVJUA 4MXS36RMVJUA 36,000 BTU · Split System ×12
2 jobs · most recent 09/29/2022
General Wiring
FiledStatusContractorScope
09/29/2022CompleteTRINCITY ELECTRIC, INCGeneral Wiring
07/29/2019CompleteRICHARD NEU—
Building Lifecycle
All (88)Filed (8)Permit Issued (3)Signed Off (2)Violation (14)Inspection (9)Objection (22)Special Inspection (30)
06/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
05/08/2024
Special inspection requirement — Mechanical Systems
ELIAS RASABI
05/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
05/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
05/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
05/08/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
05/08/2024
Special inspection requirement — Final
ELIAS RASABI
05/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
05/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
05/08/2024
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
05/08/2024
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
05/08/2024
Special inspection requirement — Lighting controls
ELIAS RASABI
05/08/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
05/08/2024
Special inspection requirement — Shutoff dampers
ELIAS RASABI
05/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
05/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
ELIAS RASABI
05/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
05/08/2024
Special inspection requirement — Maintenance information
ELIAS RASABI
05/08/2024
Special inspection requirement — Fenestration areas
ELIAS RASABI
04/27/2024
Filed — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-P5
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
04/24/2024
Special inspection requirement — Mechanical Systems
ELIAS RASABI
04/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
04/24/2024
Special inspection requirement — Final
ELIAS RASABI
04/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
04/24/2024
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
04/24/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
04/24/2024
Special inspection requirement — Maintenance information
ELIAS RASABI
04/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
04/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
04/08/2024
Objection resolved — Addressed
04/01/2024
Objection raised — Other
03/22/2024
Filed — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-P4
02/05/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/28/2023
Violation issued (HPD, closed)
I
11/22/2023
Filed — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-P3
10/04/2023
Filed — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-P2
07/13/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/10/2023
Permit issued — General Construction
B07997591-I1-GC-CX
06/22/2023
Signed off — Alteration
B00201227-I1
05/25/2023
Signed off — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-S1
04/16/2023
Objection resolved — Addressed
04/16/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Other
04/10/2023
Objection raised — Other
04/04/2023
Filed — Alteration CO
Proposed renovation of existing mixed-use masonry, no work at first floor commercial. Interior alteration second thru third floor at residential portion of the building only.
B07997591-P1
02/23/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/30/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2022
Permit issued — Plumbing
B07997591-S1-PL
09/14/2022
Objection raised — Other
09/14/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Other
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection resolved — Addressed
09/09/2022
Objection resolved — Addressed
09/09/2022
Objection resolved — Addressed
Latest 60 of 88 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYLAH FURNITURE INC903/22/2026
PREET M CONSTRUCTION IN503/22/2026
ARMAAN REALTY INC103/22/2026
OWNER OF1602 PITKIN AVE103/22/2026
PITKIN GROUP1003/21/2026
104-52 164 LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBERT MONTOYA ARCHITECT704/27/2024
ROYAL ENGINEERING, P.C107/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC603/21/2026
Mark Montoya103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PREET & M CONSTRUCTIONGeneral Contractor303/21/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416604/27/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTELLAR INDUSTRIES INC07/10/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/05/2022
DOB NOWSidewalk ShedSigned-offPREET & M CONSTRUCTION08/01/2019
BISOTISSUEDRUSK RENOVATIONS, INC01/05/1998
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/13/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
05/08/2024Lighting in dwelling unitsELIAS RASABIenergy_progress
05/08/2024Mechanical SystemsELIAS RASABIspecial
05/08/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
05/08/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
05/08/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
05/08/2024Energy Code Compliance InspectionsELIAS RASABIprogress
05/08/2024FinalELIAS RASABIprogress
05/08/2024HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
05/08/2024HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
05/08/2024Insulation placement and R valuesELIAS RASABIenergy_progress
05/08/2024Fenestration air leakageELIAS RASABIenergy_progress
05/08/2024Lighting controlsELIAS RASABIenergy_progress
05/08/2024Interior lighting powerELIAS RASABIenergy_progress
05/08/2024Shutoff dampersELIAS RASABIenergy_progress
05/08/2024Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
05/08/2024Duct leakage testing, insulation and designELIAS RASABIenergy_progress
05/08/2024HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
05/08/2024Maintenance informationELIAS RASABIenergy_progress
05/08/2024Fenestration areasELIAS RASABIenergy_progress
04/24/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
04/24/2024Mechanical SystemsELIAS RASABIspecial
04/24/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
04/24/2024Energy Code Compliance InspectionsELIAS RASABIprogress
04/24/2024FinalELIAS RASABIprogress
04/24/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
Latest 25 of 38.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/26/2026B07997591-S1Request digital key ↗
08/26/2026B07997591-P5Request digital key ↗
08/26/2026B07997591-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00201227-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B07997591-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B07997591-P1Open ↗
08/26/2026B07997591-I1Open ↗
08/26/2026B07997591-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B07997591-P5Open ↗
08/26/2026B07997591-P5Open ↗
08/26/2026B07997591-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B07997591-P5Open ↗
08/24/2026B07997591-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist6
08/26/2026B07997591-P5Open ↗
08/26/2026B07997591-P3Open ↗
08/26/2026B07997591-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026B00201227-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B07997591-S1Open ↗
08/26/2026B07997591-P5Open ↗
08/26/2026B07997591-P3Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B07997591-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification6
08/26/2026B07997591-P5Open ↗
08/26/2026B07997591-P3Open ↗
08/26/2026B07997591-P2Open ↗
Showing 3 of 6 on file for this type