← Back
Miscellaneous two family
759 HOWARD AVENUE
BROOKLYN · BIN 3081498
💬 Discuss this project
1930Year Built
2Stories
B9Building Class
R6Zoning
2,288 sfGross Floor Area
2Units
34 Open Violations 30 unresolved · 4 paperwork only ▸FDNY Report ↗
Miscellaneous two family · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 2Under Construction2p · 1 filing · 3 docs
Floor 1Under Construction3p · 2 filings · 9 docs
CellarUnder Construction2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILT RIGHT DESIGN407/08/2026
OWNER OF 759 HOWARD AVE B303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION210/29/2025
NONE110/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
Building Lifecycle
All (80)Filed (3)Permit Issued (1)Violation (34)Objection (24)Special Inspection (18)
06/12/2026
Permit issued — Plumbing
B01310567-I1-PL
10/29/2025
Filed — Alteration
B01310567-I1
07/02/2025
Objection resolved — Resolved
07/02/2025
Objection resolved — Resolved
07/02/2025
Objection resolved — Resolved
07/02/2025
Objection resolved — Resolved
06/18/2025
Objection resolved — Resolved
05/29/2025
Objection raised — Cost
05/29/2025
Objection raised — Mechanical
05/29/2025
Objection raised — Admin
05/29/2025
Objection raised — Scope
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
01/09/2025
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/19/2024
Objection raised — Cost
12/19/2024
Objection raised — Zoning
12/19/2024
Objection resolved — Addressed
11/19/2024
Objection resolved — Addressed
10/24/2024
Objection raised — Other
10/24/2024
Objection raised — Other
10/21/2024
Filed — Alteration
REINFORCE EXISTING WOOD ROOF AND FLOOR JOISTS WHERE DAMAGED DUE TO PREVIOUS FIRE IN CELLAR, 1ST FL., 2ND FL., 3RD FL. AND ROOF. REPAIR EXISTING CELLAR FOOTINGS, INSTALL STEEL COLUMNS. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01080621-S2
10/20/2024
Special inspection requirement — Concrete - Cast-In-Place
10/20/2024
Special inspection requirement — Post-installed Anchors
10/14/2024
Special inspection requirement — Structural Wood Frame
10/08/2024
Objection raised — Scope
10/08/2024
Objection raised — Scope
10/08/2024
Objection raised — Scope
10/08/2024
Objection raised — Inspections
10/08/2024
Objection raised — Scope
09/30/2024
Filed — Alteration
REINFORCE EXISTING WOOD ROOF AND FLOOR JOISTS WHERE DAMAGED DUE TO PREVIOUS FIRE IN CELLAR, 1ST FL., 2ND FL., 3RD FL. AND ROOF. REPAIR EXISTING CELLAR FOOTINGS, INSTALL STEEL COLUMNS. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01080621-I1
09/30/2024
Special inspection requirement — Final
09/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/15/2024
Special inspection requirement — Lighting controls
08/15/2024
Special inspection requirement — Fenestration air leakage
08/15/2024
Special inspection requirement — Fenestration areas
08/15/2024
Special inspection requirement — Air barrier - visual inspection
08/15/2024
Special inspection requirement — Insulation placement and R values
08/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
08/15/2024
Special inspection requirement — Lighting in dwelling units
07/15/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
07/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/15/2024
Special inspection requirement — Final
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
A
11/17/2004
Violation issued (HPD, open)
C
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
11/17/2004
Violation issued (HPD, open)
B
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING06/12/2026
1 project · most recent 10/21/2024
Concrete Wood
FiledStatusContractorScope
10/21/2024——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/20/2024Concrete - Cast-In-Place—special
10/20/2024Post-installed Anchors—special
10/14/2024Structural Wood Frame—progress
09/30/2024Final—progress
09/30/2024Structural Stability – Alterations of existing buildings—special
08/15/2024Lighting controls—energy_progress
08/15/2024Fenestration air leakage—energy_progress
08/15/2024Fenestration areas—energy_progress
08/15/2024Air barrier - visual inspection—energy_progress
08/15/2024Insulation placement and R values—energy_progress
08/15/2024Fenestration and door U-factor and product ratings—energy_progress
08/15/2024Lighting in dwelling units—energy_progress
07/15/2024Exterior Insulation and Finish Systems (EIFS)—special
07/15/2024Fire-Resistance Rated Construction—progress
07/15/2024Energy Code Compliance Inspections—progress
07/15/2024Structural Stability – Alterations of existing buildings—special
07/15/2024Final—progress
07/15/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01080621-I1Request digital key ↗
08/24/2026B01080621-S1Request digital key ↗
08/20/2026B01310567-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01080621-S2Open ↗
08/24/2026B01080621-S1Open ↗
08/24/2026B01080621-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01080621-S1Open ↗
08/24/2026B01080621-I1Open ↗
08/20/2026B01310567-I1Open ↗
Showing 3 of 4 on file for this type